Documents 880120 & 21 Telcons Between R Christians,J Parkyn & L Nelson of Util & R Meck,J Foster & P Erickson of NRC Re Comments & Questions Arising from Review of Proposed Rev 10 to Emergency Plan Submitted on 870929
ML20149J838
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 02/19/1988
From: Rubenstein L
Office of Nuclear Reactor Regulation
To: Taylor J
DAIRYLAND POWER COOPERATIVE
References
TAC-66420, NUDOCS 8802230244
Download: ML20149J838 (3)


Text

__

t l

February 19, 1988 i

Docket No. 50-409 DISTRIBUTION:

Mr. James W. Taylor, General Manager

[BocRet n le 2

EJordan I

Dairyland Power Cooperative NRC & Local PDRs JPartlow f

i; 2615 East Avenue South PDSNP Rdg ACRS (10)

I I

Lacrosse, Wisconsin 54602-0816 PErickson OGC-Rockville i

j EHylton LRubenstein 1

Dear fir. Taylor:

1

SUBJECT:

REVISION TO EftERGENCY PLAN, REQUEST FOR ADDITIONAL INFORMATION i

]

(TAC-66420) 4 l

By letter dated September 29, 1987, you submitted a proposed Revision No. 10 j

to the Emergency Plan for the Lacrosse Boiling Water Reactor (LACBWR).

This I

letter documents the January 20 and 21, 1988, telephone conversations among l

Roger Christians, John Parkyn and Larry Nelson of Dairyland Power Cooperative l

(DPC) and Robert l!eck, James Foster and Peter Erickson of the Nuclear Regulatory Comission (NRC) concerning comments and questions arising from the l

l review of the proposed Revision 10. A subsequent January 28, 1988, discussion i

between Rcbert Meck and Roger Christians is also reflected in this letter.

The proposed plan reflects the perranent shutdown and defueled status of LACBWR

)

and provides a revised analysis. The plan was reviewed by NRC Headquarters and i

NRC Regicn III under the DPC proposed assumption that in a worst-case accident i

4 the Environmental Protection Agency Protective Action Guides (PAGs) for j

pre-planned actions to protect the public would not be exceeded at the plant i

boundary. The NRC is independently assessing DPC's proposed assumption.

{

t Significant questions and coments were in the areas of Emergency Planring

[

Zone (EPZ) boundary definition, staffing and duties of emergency responders on i

day and back-shifts, limiting erergency classifications to Notification of Unusual Events and Alert, and the timing of offsite notifications.

DPC staff I

comitted to including a definition of the EPZi elaborating on the responsi-j bilities and duties of responderst and providing a technical basis for not needing Site Area and General Emergency Classifications.

DPC staff indicated

+

that they would begin incorporating the coments in Revision 10 of their crergency plan and plan to resubmit Revision 10 by the end of February, 1988.

1 If there are any questions concerning these corrents please contact Peter B.

l Erickson at (301) 492-1126.

l ll Sincero1y, I

original signed by l

Lester S. Rubenstein, Director 8802230244 380219 Standardization and Non-Power j

l PDR ADOCK 05000409 Reactor Project Directorate i

i F

PDR Division of Reactor Projects - III, !Y, Y and Special Projects 4

Office of Nuclear Reactor Regulation 1

f l

cc: See next page vC PDSNP P)

LRubenstein(

PDSitt

/

PErick EN Kon i

j 02/fg/88 02/h/88 02/]c/68 7

l l

l t

[o n%

E

'e,%

UNITED STATES A

l' 3 NUCLEAR REGULATORY COMMISSION l

2 wAsmuoToN. o. c. rosss k... f February 19, 1988 i

Docket No. 50-409 Mr. James W. Taylor, General Manager Dairyland Power Cooperative 2615 East Avenue South i

Lacrosse, Wiscensin 54602-0316

Dear Mr. Taylor:

SUBJECT:

REVISION TO EMERGENCY P'.AN, REQUEST FOR ADDITIONAL INFORMATION (TAC-66420)

By letter dated Septerrber 29, 1987, you submitted a proposed Revision No. 10 to the Emergency Plan for the Lacrosse Boiling Water Reactor (LACBWR). This letter documents the January 20 and 21, 1988, telephone conversations among Roger Christians, John Parkyn and Larry Nelson of Dairyland Power Cooperative l

(DPC) and Robert Heck, James Foster and Peter Erickson of the Nuclear Regulatory Comission (NRC) concerning coments and questions arising from the review of the proposed Revision 10. A subsequent January 28, 1988, discussion between Robert Meck and Roger Christians is also reflected in this letter, The proposed plan reflects the permanent shutdown and defueled status of LACBWR and provides a revised analysis. The plan was reviewed by NRC Headquarters and NRC Region III under the DPC proposed assumption that in a worst-case accident the Environmental Protection Agency Protective Action Guides (PAGs) for pre-planned actions to protect the public would not be exceeded at the plant boundary. The NRC is independently assessing DPC's proposed assumption.

t Significant questions and coments were in the areas of Emergency Dianning l

Zone (EPZ) boundary definition, staffing and duties of emergency responders on day and back-shifts, limiting emergency classifications to Notification of Unusual Events and Alert, and the timing of offsite notifications. DPC staff

~

comitted to including a definition of the EPZ; elaborating on the responsi-bilities and duties of respondersi and providing a technical basis for not reeding Site Area and General Emergency Classifications.

DPC staff indicated

-]

that they would begin incorporating the coments in Revision 10 of their emergency plan and plan to resubmit Revision 10 by the end of February, 1986.

I If there are any questions concerning these corrnents please contact Peter B.

Erickson at (301) 492-1126.

l i

Sincerely, CST

)

Lester S. Rubenstein Director Standardization and Non-Power l

Reactor Project Directorate Division of Reactor Projects - !!!, IV, Y and Special Projects Office of Nuclear Reactor Regulation cc: See next page I

I

,o j

^[

l j

Mr. James W. Taylor Docket No. 50-409 Dairyland Power Cooperative la Crosse Boiling Water Reactor i

l i

i ec:

Fritz Schubert, Esquire i

Staff Attorney i

Dairyland Power Cooperative 2615 East Avenue South i

La Crosse, Wisconsin 54602 Mr. Kevin P. Gallen I

t Newman & Holtzinger, P. C.

)

1615 L Street, NW l

Washington, D.C.

20036 Mr. John Parkyn, Plant Manager l

)

La Crosse Boiling Water Reactor i

Dairyland Power Cooperative P. O. Box 275 Genoa, Wisconsin 54632

}

I U.S. Nuclear Regulatory Commissien l

Resident Inspectors Office Rural Route #1, Box 276 4

Genoa, Wisconsin 54632 l

i Town Chairman Town of Genoa i

Route 1 i

Genoa, Wisconsin 54632 l

I

[

Chairnan, Public Service Comission of Wisconsin Hill Farms State Office Building I

P. O. Box 7854 i

Madison, Wisconsin 53707 Regional Administrator, Region !!!

f 1

U.S. Nuclear Regulatory Comission t

799 Roosevelt Road l

l Glen Ellyn, Illinois 60137 j

j i

)

l 1

i I

1 l

l J

i l

I 1

I i

i i

r