ML20206K496
| ML20206K496 | |
| Person / Time | |
|---|---|
| Site: | La Crosse File:Dairyland Power Cooperative icon.png |
| Issue date: | 11/18/1988 |
| From: | Erickson P Office of Nuclear Reactor Regulation |
| To: | Taylor J DAIRYLAND POWER COOPERATIVE |
| Shared Package | |
| ML20206K500 | List: |
| References | |
| NUDOCS 8811290429 | |
| Download: ML20206K496 (4) | |
Text
_ - _ _ _ _ _ _ _ _ _ _ _ _.
- .i
'e UNITED STATES "g
NUCl. EAR REGULATORY COMMISSION
\\..... [f f,
wAsMGTON, D, C. 20666 November 18, 1988 Docket No. 50-409 Mr..!ames W. Taylor Genera! Manager
- v % nd Power Cooperative h
East Avenue South La Crosse, Wiscensin 54602-0817
Dear Hr. Yaylor:
SUBJECT:
LACROSSEBOILINGWATERREACTOR(LACBWR)-TEMPCRARYEXEMPTIONFROH THE SCHEDULAR PAQUIREMENTS OF THE PROPERTY INSURANCE RULE EFFECTIVE OCTOBER 4,1988(10CFR50.54(w)(5)(i))
The Coer11ssion has issued the enclosed temparary ezemption from the schedular requirements of the property insurance rule effective October 4 1988 (10 CFR 50.54(w)(5)(1)) for the La Crosse Boiling Water Reactor (LACBWR}. This part of the rule requirts Itcensees to obtain insurance policies that prioritize insurance proceeds for stabilization and decontamination after an accident and provide for payment of proceeds to an independent trustee who would disburse ft. ads for decontamination and cleanup before ahy other purpose.
The Cormission has proposed a revision of 10 CFR 50.54(w". l(i) extending ).
the irplementation schedule for 18 months (53 FR 36338, September 19, 1988 H0 wever, since this rulemaking action was not completed by October 4,1988, the Comission is issuing a temporary exemption from th requirements of 10 CFR 50.54(w)(5)(1) until completion of the pending rulemaking extending the implementation date specified in 10 CFR 50.54(w)(5)(1) but not later than April 1, 1989. Upor. completion of such ruler.aking, the licensee shall comply with the provisions of such rule.
TheCommission,pursuantto10CFR50.12(a),herebygrantsatemperaty exemption from tie schedular requirements of 10 CFR 50.54(m)(5)(1). This temporary exemption is valid until April 1,198f or until such time as action on this rulemaking is completed.
In granting the exemption, the staff has detennined that this action is authorized by law ard will not endanger life or property or the comen defenu and security and is otherwise in the public interest.
08J1J9 D
g CK 05000409 g
PNu
~i Mr. James W. Taylor November 18, 1988 A copy of this exemption is being filed with the Office of the Federal Register for publication.
sincerely, i
original signed by Peter B. Erickson, Project Manager Standart"zaticn and Non-Power y
Reactor Project Director'te Division of Reactor Projec.s - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation l
i i
Enclosure:
As stated cc w/ enclosure:
l See next page l
r i
NRC & l'ocaT PDRs I
EHylton l
PErickson I
OGC-Rockirille i
1 Gholaban TMurley/J$ntezek l
DCrutchfield CRossi
}
l EJordan BGrimes ACRS (10) (4)
TBarnhart i
GPA/PA i
ARM /LFM8 i
Lkubenstein i
t
/
/
u OGCRdhVI j.
PDSM' PDSNP /b PD P DR4 i^
(
P I Fube(nstein Elef] ton PEric n:cw CMiller
,5
- GHolahan L
l 10/p]/88 10/p/88 1)///PS 1,0/. 5/88' Ip/8/88 N/;(/88 i'
I c
I t
h i
I i
~
. ~
P.r. Jar.es L'. Taylor tioverr.ber 18, 1988
' A copy of this exemption is being filed with the Office of the Federal Register for publication.
$1ncerely, ub-W Peter B. Erickson, Project Manager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects - !!!, IV, Y and Special Projects Office of Nuclear Reactor Regulation
Enclosure:
As stated cc w/ enclosure:
See next page t
5 t
i i
i f
I I
I i
i t
i r
' ~ - - *
...,..n l... Jams. V. Tayle Docket No. 50-409 Dairyland Power Cooperative La Crosse Boiling Water Reactor cc: Fritz Schubert Esquire Staff Attorney Dairyland Power Cooperative 2615 East Avenue South La Crosse, Wisconsin 54602 Mr. Kevin P. Gallen Newman & Holtringer, P. C.
1615 L Strtet. NW Washington, D.C.
20036 Mr. John Parkyn, Plant Manager La Crosse Boiling Water Reactor i
Dairyland Power Cooperative P. D. Box 275 Genoa, Wisconsin 54632 U.S. Nuclear Regulatory Commission Resident Inspectors Office Rural Route #1, Box 276 Genoa, Wisconsin '4632 Town Chairman Town of Genoa Route 1 Genoa, Wisconsin 54632 Chairman, Public Service Commission of Uisconsin Hill Farna State Office Building P. D. Aox 7854 Madison, Wisconsin 53707 g
Regional Administrator, Region I!!
"i U.S. Nuclear Regulatory Commissien 799 Roosevelt Road Glen Ellyn, Illinois 60137 I
?
.