ML20150B821

From kanterella
Jump to navigation Jump to search
Forwards Draft Rev 5 to ES-601, Administration of NRC Requalification Program Evaluations. W/O Encl
ML20150B821
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 06/23/1988
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Polsean M
DAIRYLAND POWER COOPERATIVE
References
NUDOCS 8807120200
Download: ML20150B821 (1)


Text

m

~

, , M 2 3 1998 Docket No. 50-409 .

Dairyland Power Cooperative Lacrosse Boiling Water Reactor.

ATTN: Mr. Mark Polsean Training Department P. O. Box 275 Genoa, WI.54632 SI'8 JECT: REQUALIFICATION EXAMIFATIONS

Dear Mr. Polsean:

Regica III has completed.a pilot requalification exam at the Perry facility utilizing the new requalification examination methodology.

In order to provide you with the latest,-although not necessarily final, procedure and guidance on the requalification process the following.information is being provided for your information.

1. Draft of ES601 Rev 5 "Administration of NRC Requalification Program Evaluations".
2. Written Exam from Perry
3. Selected Simulator Scenarios from Perry
4. Selected Job Performance Measures-(JPM) from Perry.

If you have any questions on the present status of the process please contact j meat (312)790-5695.

J Sincerely, QRIGINAt. SIGNED at GE0BQ ,C,3,WfM.

Geoffrey C. Wright, Chief Operations Branch

Enclosures:

As stated 1

CC w/ enclosures:

Lacrosse, SRI cc w/o enclosures:

M. Ring, DRP 4

4 III R'ed Wright /mc

!k kDbbK @9 [