ML20150B821
| ML20150B821 | |
| Person / Time | |
|---|---|
| Site: | La Crosse File:Dairyland Power Cooperative icon.png |
| Issue date: | 06/23/1988 |
| From: | Wright G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Polsean M DAIRYLAND POWER COOPERATIVE |
| References | |
| NUDOCS 8807120200 | |
| Download: ML20150B821 (1) | |
Text
m
~
M 2 3 1998 Docket No. 50-409 Dairyland Power Cooperative Lacrosse Boiling Water Reactor.
ATTN: Mr. Mark Polsean Training Department P. O. Box 275 Genoa, WI.54632 SI'8 JECT: REQUALIFICATION EXAMIFATIONS
Dear Mr. Polsean:
Regica III has completed.a pilot requalification exam at the Perry facility utilizing the new requalification examination methodology.
In order to provide you with the latest,-although not necessarily final, procedure and guidance on the requalification process the following.information is being provided for your information.
1.
Draft of ES601 Rev 5 "Administration of NRC Requalification Program Evaluations".
2.
Written Exam from Perry 3.
Selected Simulator Scenarios from Perry 4.
Selected Job Performance Measures-(JPM) from Perry.
If you have any questions on the present status of the process please contact j
meat (312)790-5695.
J Sincerely, QRIGINAt. SIGNED at GE0BQ,C,3,WfM.
Geoffrey C. Wright, Chief Operations Branch
Enclosures:
As stated 1
CC w/ enclosures:
Lacrosse, SRI cc w/o enclosures:
M. Ring, DRP 4
4 III R'ed Wright /mc
!k kDbbK
@9
[