Forwards Insp Rept 50-298/86-14 on 860401-0531 Notice of Violation & Notice of Deviation.Notice of Deviation & Rept Details Withheld (Ref 10CFR73.21)
ML20207H899
Person / Time
Site: Cooper Entergy icon.png
Issue date: 07/17/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20207H904 List:
References
NUDOCS 8607250132
Download: ML20207H899 (3)


See also: IR 05000298/1986014

Text

,

JLL I7ggg

In Reply Refer To:

Docket: 50-298/86-14

-

Nebraska Public Power District

ATTN: J. M. Pilant, Manager, Technical

Staff-Nuclear. Power Group

P. O. Box 499' .e

< . Columbus, Nebraska. 68601:

.

.

, , . .

' '

-

Gentlemeni ,

This refers to the inspection conducted by Messrs. D. L. DuBois and

E. A.<Plettner;of this office during the period April 1 through May 31, 1986,

of activities authorized.by NRC Operating License DPR-46 for Cooper Nuclear *

Station; and'to the discussion of our findings with Mr. G. R. Horn and other

- members of your staff.at the conclusion of the inspection.

Areas examined during 'the inspection included action you have taken with regard

- .to previously identified inspection findings, Licensee Event Reports, spent

fuel shipments,' operational safety verification, and monthly surveillance and

maintenance activities. Within these areas, the inspection consisted of

selective examination of, procedures and representative records, interviews with

personnel, and observations by the inspectors. The inspection findings are

documented in the. enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

these violations, in writing, in accordance with the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations. Your response should be based on the specifics contained

in the Notice of Violation enclosed with this letter.

Also during this inspection, it was found that certain of your activities

dppeared to deviate from Commitments made to the NRC. These items and

references to the comitments are identified in the enclosed Notice of

Deviation. You are requested to respond to these deviations in writing. Your

response should be based on the specifics contained in the Notice of Deviation

enclosed with this letter.

Two unresolved items are identified in paragraph 8 of the enclosed inspection

report.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragr h 2 of the enclosed report.

) l

C:LPB/A C:EP&SF C:RP

JPlaudon LAYandt. JEGag' bardo

qf7/86 ')/l3/86 1//? g 86

REMOVAL OF THE PAGES MARKED " SAFEGUARDS INFORMATION" DECONTROLS THE REMAINDER OF THIS DOCUMENT

1 /V

8607250132 860717 8

PDR ADOCK 0500 g

. . - - - , , .- .- . - - . - -_-. . -

E 1

'

..

Nebraska Public Power District -2-

The material enclosed herewith contains Safeguards Information as defined by

10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited

by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore,

Appendix B and the attachment to Appendix C will not be placed in the Public

Document Room.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures-of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

1

Should you have any questions concerning this inspection, we will be pleased to  !

discuss them with you.  !

l

Sincerely,

"Oc@nal Signed by:"

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - Notice of Deviation (Safeguards)

3. Appendix C - NRC Inspection Report

50-298/86-14 (with Safeguards Attachment)

cc:

-Guy R. Horn,- Division Manager

of Nuclear Operations

Cooper Nuclear Station

P. O. Box 98

Brownville, Nebraska 68321

Kansas. Radiation Control Program Director

Nebraska Radiation Control Program Director

bcc: Copy of entire report maintained in RIV Security File and sent to:

G. McCorkle, NMSS

J. Gibson, SSPD/NRR

IE File

Resident Inspector (w/766)

R. Martin

Chief, EPSPS

D. Powers, EO

REMOVAL OF THE PAGES MARKED " SAFEGUARDS INFORMATION" DECONTROLS THE REMAINDER OF THIS DOCUMENT

,

-- -

-,

-

. .

1

Nebraska Public Power District -3- '

l

l

l

bec: report w/o Appendix B (Safeguards) and Safeguards Attachment to l

Appendix C w/766:

RPB D. Weiss,-LFMB(AR-2015)

SectionChief(RPSA) RIV File

MIS RSTS Operator

R&SPB

bcc: report w/o Appendix B (Safeguards) and Safeguards Attachment to

Appendix C w/o 766:

-DMB IE-04

R. Bangart, DRS&S

E. Johnson, DRS&P

,

REMOVAL OF THE PAGES MARKED " SAFEGUARDS'INFORMATION" DECONTROLS THE REMAINDER OF THIS DOCUMENT

.