ML20149D514

From kanterella
Revision as of 04:01, 27 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-298/87-29 on 871207-10.No Violations or Deviations Noted
ML20149D514
Person / Time
Site: Cooper Entergy icon.png
Issue date: 01/06/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Trevors G
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20149D519 List:
References
NUDOCS 8801130017
Download: ML20149D514 (2)


See also: IR 05000298/1987029

Text

-

. , I

.: -

JArt j 61988 '

,

.

In Reply Refer To:

Docket: 50-298/87-29-

.

Nebraska Public Power District

-ATTN: George A. Trevors

Division Manager - Nuclear Support. .

P.O. Box 499

Columbus, NE 68601

Gentlemen:

This refers to the inspection conducted by Mr. R. E. Baer of this office during

the period December 7-10, 1987 of activities authorized by NRC Operating

License DPR-46.for the Cooper Nuclear Station, and to the discussion of our

findings with Mr. G. R. Horn and other members of your staff at the conclusion

of the inspection.

Areas examined during the inspection included portions of the radiation

protection program. Within these areas, the inspection consisted of selective

examination of procedures.and representative records, interviews with

personnel, and observations by the NRC inspector. The inspection findings are

documented in the enclosed inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is' identified in ,

paragraph 2 of the enclosed report.

Should you have any questions concerning this inspection, we will'be pleased to

discuss them with you. .

Sincerely,

Original Signed By

L I. Callan

L. J. Callan, Director

Division of Reactor Projects

Enclosures: (see next page)

RIV:FRPSI C:FR C:RPSB AC:D D:DR

REBaer/cz }pjMurray LAYande @ -GtMadsereg LJCa lan

p/%/87 4 p g /87 d/$l/87 (. / /y /.87 l/.)5/87 l

,

9Y_

88011300'17 880106

PDR ADOCK 05000298

0 DCD

p l9

. _

. . - . _ _ . _ -

/

_ _

h

_ .. . _ _ . . . . . .. _ -. , . . . _. . _ _ . .

'E. .'

.J .

.

.

Nebraska Public Power District ~ -2-

r

' Enclosure: .

Appendix - NRC Inspection Report

50-298/87-29.

cc w/ enclosures:

Cooper Nuclear Station

ATTN: Guy Horn,-Division Manager

.

of Nuclear Operations

P.O. Box 98  :

Brownville,ENebraska 68321

Kansas Radiation Control Program. Director.

.

Nebraska Radiation. Control Program Director

bcc to DMB (IE-06)

r

bec distrib. by RIV

  • RRI

'

R. D. Martin, RA "

  • Section Chief (DRP/C) *Lis'a Shea, RM/ALF .

RPSB-DRSS * MIS System .

  • RIV File * Project Engineer, DRP/C
  • RSTS Operator *W.~Long, NRR Project Manager -
  • R. Hall *DRS
  • TSS *DRP

D. Powers *R. Baer

  • B. Murray R. L. Bangart

'

  • w/766

.

U

b

b

"

.!

l

l

.

!

i

-

_ _ _ . _ _ _ _ _ _ - - - - _ _ _ _ . , -

.