ML20154Q281

From kanterella
Revision as of 11:25, 22 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Restart Readiness Assessment Rept for Facility. W/O Encl
ML20154Q281
Person / Time
Site: Pilgrim
Issue date: 09/27/1988
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Driscoll M
FREDERICK C. ADAMS PUBLIC LIBRARY
References
NUDOCS 8810030355
Download: ML20154Q281 (1)


Text

g-SEP 271988 Frederick C. Adams Public Library ATTN: Ms. Mary Ann Oriscoll Summer Street Kingston, Massachusetts 02369

Dear Ms. Driscoll:

This letter forwards a copy of the Nuclear Regulatory Commission (NRC) Pilgrim Restart Assessment Panel's Restart Readiness Assessment Report for tha Pilgrim Nuclear Power Station (PNPS).

Please place this material with the copy of the PNPS Restart Plan and Self-Assessment Report, which were previously provided, and make it available for public review.

Thank you for your continuing cooperation in this matter.

Sincerely, ORIGINAL SIGNED BY Samuel J. Collins, Deputy Director Division of Reactor Projects

Enclosures:

As stated cc w/o encis:

Public Document Room (POR) local Public Document Room (LPOR) bec w/o encls:

L. T. Doerflein, DRP M. J. 010onato, DRP M. T. Miller, SLO ot RI:0RP -

0RP I RP L0oerflein/mjd Wiggins 111ns 9A4/88 9A6/88 9 4I /88 0FFICIAL RECORD COPY LIBRARY KINGSTON - 0001.0.0 09/26/88 i

1 0 8s10030355 880927 DR ADOCK0500go3 [fa' v '[

_