Forwards Insp Rept 50-317/85-03 on 850304-15.No Violations Noted
ML20129B378
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 07/09/1985
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20129B382 List:
References
RTR-NUREG-CR-3511 NUDOCS 8507150501
Download: ML20129B378 (2)


See also: IR 05000317/1985003

Text

- _ - _ - . _ _

,

'

g-

'

JUL 0 91985

Docket No. 50-317 ,

License No. DPR-53

Baltimore Gas and Electric Company

ATTN: Mr. A. E. Lundvall, Jr.

Vice President, Supply

P. O. Box 1475

Baltimore, Maryland 21203

Gentlemen:

Subject: Inspection No. 50-317/85-03

This refers to the special safety inspection conducted by Dr. Jin W. Chung of

this office on March 4 - 15, 1985 at Calvert Cliffs Nuclear Power Plant, Unit 1,

'

, Lusby, Maryland of activities authorized by NRC License No. DPR-53 and to the

discussions of our findings held by Dr. Jin W. Chung with Mr. J. Tiernan and

other members .of your-staff at the conclusion of the inspection.

'

Areas examined during this inspection included systems selected from two accident

sequences documented in the Calvert Cliffs probabilistic risk assessment (NUREG/

~CR-3511). The equiptrent inspection focused on the availability of critical

components as evidenced by plant conditions and implementation of programs to

assure operability. In addition, this inspectio, examined the ability of the

Calvert Cliff staff to utilize procedures and equipment to recover from accident

'

sequences. These areas are described in the NRC Region I Inspection Report

which is enclosed'with this letter.

Within these area:, the inspection consisted of selective examinations of proce-

dures and representative records, interviews with personnel, and cbservation of

equipment and simulated activities by the inspector.

Within the scope of this inspection, no violations were observed.

No reply to this letter is required. Your cooperation with us in this matter is

appreciated.

Sincerely,

y.*"-- W ,;;J373

8507150501 850709

,

PDR ADOCK 05000317 Stewart D. Ebneter, Director

G PDR

Division of Reactor Safety

Enclosure: NRC Region I' Inspection Report Number 50-317/85-03

1

0FFICIAL RECORD COPY CAT CC1 85-03 - 0001.0.0

03/30/85

'

' ZED /

1

.

.-

2

cc w/ encl:

R. M. Douglass, Manager, Quality Assurance

L. B. Russell, Plant Superintendent

M.' E. Roberson, General Supervisor, Operations QA

Thomas Magette, Administrator, Nuclear Evaluations

R. C. L. Olson, Principal Engineer

J. A. Tiernan, Manager, Nuclear Power

R. E.-Denton, General Supervisor, Training and Technical Services

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear' Safety Information Center (NSIC)

NRC Resident Inspector

State of Maryland (2)

bcc'w/ encl:

Region I-Docket Room (with concurrences)

Senior Operations Officer (w/o encis)

DRP Section Chief

Dr. T. Murley

RI:DRS

b

RI:DRS RI:DRS

RI:DRS

Chung/jcd Anderson Durr Ebneter

} /85 Tl /8 *1/9/85 l/q/85

L

OFFICIAL RECORD COPY CAT CC1 85-03 - 0001.1.0

03/30/85