Forwards Insp Repts 50-424/85-26 & 50-425/85-25 on 850608-0719.No Violations or Deviations Noted
ML20133N967
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/02/1985
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
Shared Package
ML20133N970 List:
References
NUDOCS 8508140077
Download: ML20133N967 (2)


See also: IR 05000424/1985026

Text

,

'

ibl0k

7

AUG 0 21995

feorgiaPowerCompany

v ATTN: Mr. R. J. Kelly

Executive Vice President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: REPORT NOS. 50-424/85-26 AND 50-425/85-25

On June 8 - July 19, 1985, NRC inspected activities authorized by NRC

Construction Permit Nos. CPPR-108 and CPPR-109 for your Vogtle facility. At the

conclusion of the inspection, the findings were discussed with those members of

your staff identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Should you have any questions concerning this letter, please contact us.

Sincerely,

ORIGINAL SIGNED BY

VIRGIL L BROWNLEE

Virgil L. Brownlee, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

Inspection Report Nos. 50-424/85-26

and 50-425/85-25

cp w/ encl:

t4. E. Conway, Senior Vice President

Nuclear Power

v0' O. Foster, Vice President

and General Manager, Vogtle Project

cA1. H. Gregory, III, General

Manager, Vogtle Nuclear Construction

4 Bockhold, Jr., Vogtle

Plant Manager

d. T. Gucwa, Chief

Nuclear Engineer

cc w/ encl cont'd: (See page 2)

l

I

$$00 DON [ I

.rE o / }

.

AUG 0 21985

Georgia Power Company 2

gc w/ encl:

w uble A. Thomas,

Vice President-Licensing Vogtle

Project

JdGroover, Quality

Assurance Site Manager

d.W. Hayes,QAManager

vX T. Beckham, Vice President

& General Manager - Operations

d. A. Bailey, Project Licensing

Manager

(Re'orge F. Trowbridge, Esq.

Shaw, Pittman, Potts and Trowbridge

druceW. Churchill,Esq.

Shaw, Pittman, Potts and Trowbridge

t/ Ernest L. Blake, Jr., Esq.

Shaw, Pittman, Potts and Trowbridge

ufames E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

dames G. Ledbetter, Commissioner

Department of Human Resources

i.Eharles H. Badger, Office of

Planning and Budget, Management

Review Division

Weppish Kirkland, III, Counsel

Dffice of the Consumer's Utility Council

4tfuglas C. Teper, Georgians Against

Nuclear Energy

5 fdurie Fowler, Legal Environmental

, Assistance Foundation

Wim Johnson, Executive Director

Educational Campaign for a Prosperous

j Georgia

Wlorton B. Margulies, Esq., Chairman

Administrative Judge, Atomic Safety

and Licensing Board Panel

Ar. Oscar H. Paris, Administrative Judge

Atomic Safety and Licensing Board Panel

  1. stave A. Linenberger, Jr., Administrative

Judge, Atomic Safety and Licensing Board Panel

bec w/ encl:

Document Control Desk

State of Georgia l

/CResidentInspector l

l

RII RII l

RhI gb fy

WRankin:dr MSinkule VBrownlee

8/I /85 8/ }/85 8/1/ /85

_ _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _