Monthly Operating Rept for Nov 1981
ML20038D149
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 12/01/1981
From: Hairston W
ALABAMA POWER CO.
To:
Shared Package
ML20038D146 List:
References
NUDOCS 8112160106
Download: ML20038D149 (4)


Text

.- ___ ____-___ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _

OPERATING DATA REPORT DOCKET NO. 50-364 DATE 12/1/81 COMPLETED fly W. G. Hairston, III TELEPl!ONE (205) 899-5156 OPERATING STATUS l

tes

1. Unit Name: Joseoh M. Farlev - Un i t- >
1) Cumulative data
2. Reporting Period: November. 1981 since 7/30/81,date of
3. Licensed Thermal Power (MWt): 2652 commercial operation.
4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 860*
7. Maximum Dependable Capacity (Net MWe): 829*
8. If Changes Occar in Capacity Ratings (Items Number 3 Through 7) Since Last Repcrt. Give Reasons:

N/A l

9. Power Level To Which Restricted. lf Any (Net MWe): N/A
10. Reasons For Restrictions.If Any: N/A O 1 This Month Yr to Date Cu'mulatise
11. Hours In Reporting Pedod 720 2.977 2.977
12. Number Of Hours Reactor Was Critical 716.0 2.939.0 2.939.0
13. Reactor Reserve Shutdown Hours 4.0 38.0 38.0
14. Hours Generator On.Line 714.3 2,926.4 2.926.4
15. Unit Reserve Shutdown Hours 0 o o
16. Gross Thermal Energy Generated (MWH) 1 818.794,6 7.553.651.8 7:5St651 R
17. Gross Electrical Energy Generated (MWH) 591.002 _, 2.444.408 2.444.408
18. Net Electrical Energy Generated (MWH) 562,156 -2,323,770 2.323.770
19. Unit Service Factor 99.2 98.3 98.3
20. Unit Availability Factor 99.2 98.3 98.3
21. Unit Capacity Factor iUsing MDC Net) 94.2 94.2 94.2
22. Unit Capacity Factor (Using DER Net) 94.2 94.2 94.2
23. Unit Forced Outage Rate 00.8 01.7 01.7
24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each1:

Main generator inspection: January 8 1982: approximately seven (7) days.

25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY 5/06/81 5/08/81

( INITIAL ELECTRICITY 5/24/81 5/25/81 V

COMMERCIAL OPERATION 8/01/81 7/30/81-

  • The nameplate rating / design electrical rating will be used for the maximum dependable expe rien ce. -

capacity until an accurate value can be determined from operating

'(9/77) 8112160106 811209 PDR ADOCK 05000364 R PDR.

r

/

,,"* DOCKET NO. 50-364 m .

2 UNIT d3 - . . .- . .

DATE 12/01/81 COMPLETED BY W. C. Hairston , . III 1

I TELEPHONE _ (205) 899-5156 i MONTH November, 1981 .

DAY AVERAGE DAILY POWER LEVEL

  • DAY AVERAGE DAll POWER LEVEL (MWe. Net) (Mwe. Net) 821 37 815 - '.

2 8i9 -

gg 823 *

. 3 R17 39 813 4 816

  • 821 20 5 819 787 21 ' ~

6 795 22 835 m 7 R16 23 791 i .

p' g. 828 686 24

q. ,

9 821 617 25 814 667 10 - 26 1I 809 27 661 12 818 796 23 .

13 822 821 3

14 771 30 535

..- IS 820 33 16  ; 815 .

INSTRUCEONS

, On this format. list the aversge daily unit power levelin MWe-Net for each day in the reporting month. Compute to the neare:t whole megawatt.

' ~ # * '

, (9(77) t ..

~ -- '

~ -

e -

i 1

-,,u -.. , --> , . , - - - - - - - . -

() V '

b UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. so ma UNIT NAME 3. M. Farley-Unit 2 DATE 12/1/81 REPORT MONTI{ November, 1981 COMPLETED BY W. C. Hairston . III TELEPilONE 0 05) 899-5156 w

1 a

No. Date g

, .$'E 3g

};; }Ej=

,yec Licensee @, j% Cause & Correceive Event p o- Action to 6

$5 5 j 65 g Repori # _

u) U j] Provent Recurrence 6

031 811106 S 0 B 4

  • N/A IB ZZZZZZ Unit power reduced to and held at 500 FWe to perform FNP-0-STP-33.lb (Safeguards Test Cabinet Train B Functional Test) .

032 P11125 F 0 A 4 N/A IlJ PlPEXX Unit power reduced to and held at 495 FWe to repair a Dell fluid leak on SGFP 2A.

033 811130 F 5.7 G 3 N/A ED RELIYX Turbine Trip - Reactor Trip. IDSP B Train due to the inadvertent actuation of relays in the switchhouse while performing maintenance on a panel.

I 2 3 4 F: Forced Reason: Method:

S: Scheduled A-Equipment Failure (Explain) Exhibit G . Instructions

1. Manual for Preparation of Data B-Maintenance of Test 2. Manual Scram, Entry Sheets for Licensee C Refueling 3 Automatic Scram.

D-Regulatory Restsiction Event Report (LER) File (NUREG-4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative 5

G-Operational E ror (Explain)

W/77) llother (Explain) Exhibii 1. Same Source

I l

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS NOVEMBER, 1981 There were two (2) power reductions and one (1) automatic shutdown in the month of November.

The following safety-related maintenance was performed in the month of November:

1. Performed miscellaneous maintenance on diesel generators.

l t

l l

l t

!