OPERATING DATA REPORT DOCKET NO.
50-364 DATE 12/1/81 COMPLETED fly W. G. Hairston, III TELEPl!ONE (205) 899-5156 OPERATING STATUS l
tes
- 1. Unit Name: Joseoh M.
Farlev - Un i t-
- 1) Cumulative data
- 2. Reporting Period:
November. 1981 since 7/30/81,date of
- 3. Licensed Thermal Power (MWt):
2652 commercial operation.
- 4. Nameplate Rating (Gross MWe):
860
- 5. Design Electrical Rating (Net MWe):
829
- 6. Maximum Dependable Capacity (Gross MWe):
860*
- 7. Maximum Dependable Capacity (Net MWe):
829*
- 8. If Changes Occar in Capacity Ratings (Items Number 3 Through 7) Since Last Repcrt. Give Reasons:
N/A l
- 9. Power Level To Which Restricted. lf Any (Net MWe):
N/A
- 10. Reasons For Restrictions.If Any:
N/A O
1 This Month Yr to Date Cu'mulatise
- 11. Hours In Reporting Pedod 720 2.977 2.977
- 12. Number Of Hours Reactor Was Critical 716.0 2.939.0 2.939.0
- 13. Reactor Reserve Shutdown Hours 4.0 38.0 38.0
- 14. Hours Generator On.Line 714.3 2,926.4 2.926.4
- 15. Unit Reserve Shutdown Hours 0
o o
- 16. Gross Thermal Energy Generated (MWH) 1 818.794,6 7.553.651.8 7:5St651 R
- 17. Gross Electrical Energy Generated (MWH) 591.002
_, 2.444.408 2.444.408
- 18. Net Electrical Energy Generated (MWH) 562,156
-2,323,770 2.323.770
- 19. Unit Service Factor 99.2 98.3 98.3
- 20. Unit Availability Factor 99.2 98.3 98.3
- 21. Unit Capacity Factor iUsing MDC Net) 94.2 94.2 94.2
- 22. Unit Capacity Factor (Using DER Net) 94.2 94.2 94.2
- 23. Unit Forced Outage Rate 00.8 01.7 01.7
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each1:
Main generator inspection: January 8 1982: approximately seven (7) days.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 5/06/81 5/08/81
(
INITIAL ELECTRICITY 5/24/81 5/25/81 V
COMMERCIAL OPERATION 8/01/81 7/30/81-
- The nameplate rating / design electrical rating will be used for the maximum dependable capacity until an accurate value can be determined from operating expe rien ce. -
'(9/77) 8112160106 811209 PDR ADOCK 05000364 R
PDR.
/
r DOCKET NO.
50-364 m
UNIT 2
d3 DATE 12/01/81 COMPLETED BY W. C. Hairston,. III 1
I TELEPHONE _ (205) 899-5156 i
MONTH November, 1981 DAY AVERAGE DAILY POWER LEVEL
- DAY AVERAGE DAll POWER LEVEL (MWe. Net)
(Mwe. Net) 821 37 815 -
2 8i9 gg 823 3
R17 39 813 4
816 20 821 5
819 21 ' ~
787 6
795 22 835 23 791 7
R16 m i p'
g.
828 686 24
- q.,
9 821 25 617 10 814
- 26 667 1I 809 27 661 12 818 23 796 13 822 3
821 14 771 30 535 IS 820 33 16 815 INSTRUCEONS On this format. list the aversge daily unit power levelin MWe-Net for each day in the reporting month. Compute to the neare:t whole megawatt.
(9(77)
~
t
~
e
~
i 1
-,,u
()
V b
UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.
so ma UNIT NAME
- 3. M.
Farley-Unit 2 DATE 12/1/81 REPORT MONTI{ November, 1981 COMPLETED BY W. C. Hairston. III TELEPilONE 0 05) 899-5156 1
.$'E
}
}Ej=
w a
Licensee j%
Cause & Correceive No.
Date g
3g
,yec Event p
j]
o-Action to 6
$5 5
j 65 g Repori #
u) U Provent Recurrence 6
031 811106 S
0 B
4 N/A IB ZZZZZZ Unit power reduced to and held at 500 FWe to perform FNP-0-STP-33.lb (Safeguards Test Cabinet Train B Functional Test).
032 P11125 F
0 A
4 N/A IlJ PlPEXX Unit power reduced to and held at 495 FWe to repair a Dell fluid leak on SGFP 2A.
033 811130 F
5.7 G
3 N/A ED RELIYX Turbine Trip - Reactor Trip.
IDSP B Train due to the inadvertent actuation of relays in the switchhouse while performing maintenance on a panel.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G. Instructions S: Scheduled A-Equipment Failure (Explain)
- 1. Manual for Preparation of Data B-Maintenance of Test
- 2. Manual Scram, Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restsiction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative 5
G-Operational E ror (Explain)
Exhibii 1. Same Source W/77) llother (Explain)
I l
JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE
SUMMARY
OF OPERATIONS NOVEMBER, 1981 There were two (2) power reductions and one (1) automatic shutdown in the month of November.
The following safety-related maintenance was performed in the month of November:
- 1. Performed miscellaneous maintenance on diesel generators.
l t
l l
l t
.