ML19241B833

From kanterella
Revision as of 07:27, 19 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Amend 5 to FSAR
ML19241B833
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/19/1979
From: Aswell D
LOUISIANA POWER & LIGHT CO.
To:
Office of Nuclear Reactor Regulation
Shared Package
ML19241B834 List:
References
Q-3-A29.18.05, NUDOCS 7907240346
Download: ML19241B833 (2)


Text

- _, ==:

pl e

(4

'. 1 l_0 UISI AN A

' W ORARONDE SWH P O W E P & L I G H T! P O BOX 6008

  • ORLEANS LOU'StANA 70174 * (504) 366 2345 NEW

=tm July 19, 1979 ge ,m t

,. o.~, , go r om LPL 11598

.

Q-3-A29.18.05 Director of Nuclear Reac ' ar Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555

SUBJECT:

Waterford 3 SES Docket No. 50-382 Amendment No. 5 to FSAR

REFERENCES:

(1) Letter from R. L. Baer to D. L. Aswell dated April 26, 1979 (2) Letter from R. L. Baer to D. L. Aswell dated June 11, 1979 (3) Letter from R. L. Baer to D. L. Aswell May 18, 1979 (4) Letter from R. S. Boyd to D. L. Aswell dated April 19, 1979

Dear Sir:

Enclosed are three signed originals and 60 copies of Amendment No. 5 to the Waterford 3 FSAR. This amendment reflects responses to most of the questions in the above Refereneo (i) plus routine revisions made by LP&L. Those questions in this reference not included in Amendment No. 5, but will be submitted on August 24, 1979, are as follows:

022.11 313.18 321.11 331.16 022.18 313.29 321.12 022.20 313.41 331.9 022.21 313.43 331.10 121.10 313.44 331.11 313.15 321.8 331.15 Responses to the Core Performarce Branch questions in Reference (2) will be st amitted on September 7, 1979 along with the responses to the Power Systems Branch questions.

The response to questien 371.13, regarding hydrology, in Referance (2) will be submitted on August 24, 1979.

The response to questica 022.'3, regarding containment analysis, in Reference (3) util be submitted on August 24,1979.

528  ;,g s ds'

'

n si o 7 90724o t 4

Director of t;uclear Reactor Regulation July 19, 1979 Page 2 The following Branches have not submitted Round One questions:

Reactor Systems (Branch 210)

Quality Assurance (Branch 422/ Conduct of operations)

Structural Engineering (Branch 130)

Materials Engineering (Branch 122/ Metallurgy)

Reactor Safeguards (Branch 431)

Quality Assurance (Branch 423/ Testing)

Instrumentation and Control Systems (Branch 030)

Mechanical Engincering (Branch 110)

Au: ciliary Systems (010)

In light of Mr. Denton's conne..to at our June 13, 1979 meeting at Bethesda regarding current NRC resource limitations, we believe it is incumbent upon both the NRC and LP6L to arrive at a schedule for the issuance of these late Round One questions. We are particularly concerned that several licensing issues have the potential for causing design changes. In this respect, we urgently request your consideration of quickly providing NRC comments or questions related to those issues for which we have requestcd early feedback.

So as to provide a basis for recovering lost licensing schedule rinc, LP&L is evalu-ating potential r:ethods for expediting elements of the schedule. We will be prepared to discuss these methods, end other matters, within several weeks and will contact your Mr. R. A. Benedict to arrange a meeting.

Yours very truly, A16Ud D. L. Aswell DLA/RWP/dc Enclosure

'

,

f1j cc: Mensrs. E. Blake [) ! l

-

JI M. Stevenson

STATE OF LOUISIANA)

) SS PARISH OF ORLEANS )

D. L. Aswell, being duly sworn, states that he is Vice President-Power Production of Louisiana Power & Light Company and that he is authorized on the part of said company to sign and fil' with the Nuclear Regulatory Connission this amendment.

6 D. L. Aswell SUBSCRIBED AND SWORN to before me, a Notary Public in and for tne

/ If [glay of g'~(/ 7 O Parish and State above named, this

/ .

e~

/

No'tary P ic ua

~

My Commission expires:

l(/ /1/J' b / N5 528 312