Public Meeting Summary - Category 3 - Annual Assessment Meeting - Crystal River Unit 3 Nuclear Plant
ML13134A173
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/13/2013
From: Rich D
NRC/RGN-II/DRP/RPB3
To: Hobbs T
Progress Energy Florida
References
Download: ML13134A173 (21)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 13, 2013 Mr. Terry D. Hobbs Decommissioning Director Crystal River Nuclear Plant (NA2C)

15760 W. Power Line Street Crystal River, FL 34428-6708

SUBJECT:

PUBLIC MEETING

SUMMARY

- CATEGORY 3 - ANNUAL ASSESSMENT MEETING - CRYSTAL RIVER UNIT 3 NUCLEAR PLANT, DOCKET NO. 50-302

Dear Mr. Hobbs:

This refers to the meeting conducted on May 1, 2013, at the Crystal River Nuclear Plant Training Center/Emergency Operations Facility located in Crystal River, Florida. The purpose of

the meeting was to discuss the NRC Reactor Oversight Process Annual Assessment of your Crystal River Unit 3 Nuclear Plant. Enclosed is a list of attendees and the Crystal River annual assessment meeting presentation.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact me at (404) 997- 4721.

Sincerely,

/RA/

Daniel W. Rich, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket No.: 50-302 License No.: DPR-72

Enclosures:

1. List of Attendees
2. NRC Presentation

_________________________ X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE MJR:/RA/ DWR:/RA/ NAME MRiches DRich DATE 5/3/2013 5/13/2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO T. Hobbs 2 cc w/encls: Kelvin Henderson, General Manager Nuclear Fleet Operations Progress Energy Electronic Mail Distribution

Robert J. Duncan II, Vice President Nuclear Operations Progress Energy Electronic Mail Distribution

Brian C. McCabe Manager, Nuclear Oversight Shearon Harris Nuclear Power Plant Progress Energy Electronic Mail Distribution

Terry Hobbs, Plant General Manager Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution

Stephen J. Cahill Director - Engineering Nuclear Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution

R. Alexander Glenn, General Counsel

Progress Energy Electronic Mail Distribution Jeffrey R. Swartz

Director Site Operations Crystal River Nuclear Plant Electronic Mail Distribution

Donna B. Alexander Manager, Nuclear Regulatory Affairs (interim)

Progress Energy Electronic Mail Distribution Thomas Sapporito, Consulting Associate Post Office Box 8413 Jupiter, FL 33468 Bryan Koon, Director Florida Division of Emergency Management Electronic Mail Distribution

William A. Passetti, Chief

Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution

Daniel R. Westcott, Supervisor Licensing & Regulatory Programs Crystal River Nuclear Plant (NA1B) Electronic Mail Distribution

Joseph W. Donahue, Vice President Nuclear Oversight

Progress Energy Electronic Mail Distribution

Jack E. Huegel Manager, Nuclear Oversight Crystal River Nuclear Plant Electronic Mail Distribution David T. Conley, Senior Counsel

Legal Department

Progress Energy Electronic Mail Distribution Mark Rigsby Manager, Support Services - Nuclear Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution

Attorney General Department of Legal Affairs The Capitol PL-01 Tallahassee, FL 32399-1050

Chairman Board of County Commissioners

Citrus County

110 N. Apopka Avenue

Inverness, FL 36250

T. Hobbs 3 Letter to Terry D. Hobbs from Daniel W. Rich dated May 13, 2013

SUBJECT:

PUBLIC MEETING

SUMMARY

- CATEGORY 3- ANNUAL ASSESSMENT MEETING - CRYSTAL RIVER UNIT 3 NUCLEAR PLANT, DOCKET NO. 50-302

Distribution w/encls

C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMCrystalRiver Resource Enclosure 1 LIST OF ATTENDEES

Nuclear Regulatory Commission (NRC)

D. Rich, Chief, Reactor Projects Branch 3 (RPB3), Region II (RII)

T. Morrissey, Senior Resident Inspector, St. Lucie, RII S. Vias, Chief, Engineering Branch 3 (EB3), RII M. Ferdas, Chief, Decommissioning Branch, Division of Nuclear Material Safety Management and Support (NMSS), Region I Bruce Watson, Chief, Reactor Decommissioning Branch, Office of Federal and State Materials and Environmental Management Programs (FSME) J. Hickman, Reactor Decommissioning Branch, FSME

Duke Energy

T. Hobbs, Decommissioning Director - Crystal River 3 Nuclear Plant B. Wunderly, Plant Manager - Crystal River 3 Nuclear Plant P. Dixon, Decommissioning Support Manager - Crystal River 3 Nuclear Plant K. Meyers, Emergency Planning - Crystal River 3 Nuclear Plant

H. Danenhower

M. DeLowery

Public Attendance

R. Bright

B. Bright P. Rowe B. Jordan D.M. Clark

J. Keenum

D. Kraut J. Thomas

A. Cooke A. Sadiq

Enclosure 2 2 Enclosure 2 3 Enclosure 2 4 Enclosure 2 5 Enclosure 2 6 Enclosure 2 7 Enclosure 2 8 Enclosure 2 9 Enclosure 2 10 Enclosure 2 11 Enclosure 2 12 Enclosure 2 13 Enclosure 2 14 Enclosure 2 15 Enclosure 2 16 Enclosure 2