Summary of Meeting with Florida Power Corp Regarding Fuel Design Changes Planned for Fall 2003 Refueling, Crystal River, Unit No. 3
ML032380579
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/16/2003
From: Mozafari B
NRC/NRR/DLPM/LPD2
To:
mozafari B, NRR/DLPM, 415-2020
References
Download: ML032380579 (5)


Text

September 16, 2003 LICENSEE: Florida Power Corporation FACILITY: Crystal River Unit 3

SUBJECT:

SUMMARY

OF OCTOBER 3, 2002, MEETING REGARDING FUEL DESIGN CHANGES PLANNED FOR FALL 2003 REFUELING On October 3, 2002, the U.S. Nuclear Regulatory Commission (NRC) staff met with representatives of Florida Power Corporation (doing business as Progress Energy) at the NRC Headquarters in Rockville, Maryland. The purpose of the meeting was to discuss proposed license amendment requests required before the fall 2003 outage.

The meeting was open to the public as stated in the meeting notice dated September 20, 2002.

The enclosure is a list of attendees. The accession number for the meeting handouts is ML032340703.

The meeting involved Framatome and focused on planned Crystal River Unit 3 (CR-3) fuel design-specific license amendments and a request for review of a Framatome topical report on cycle reload analyses that is referenced in the CR-3 Core Operating Limit Report.

The CR-3 reload analysis will require NRC approval of BAW-10241(P) "The BHTP [HTP Spacer Grid Design] DNB [Departure from Nucleate Boiling] Correlation With LYNXT [thermal hydraulic computer code] and BAW-10179(P), Revision 5, "Safety Criteria and Methodology for Acceptable Cycle Reload Analyses, which Framatome indicated would be submitted in December 2002.

Following a presentation of the need for the high thermal performance fuel design at CR-3, representatives from Progress Energy and Framatome described the proposed design. The planned topical report revision would include a discussion of the range of applicability and compare the new departure from nucleate boiling correlation to experimental measurements.

The fuel design, grid features, CR-3 fuel failure history, and industry experience were discussed. The schedule for submitting CR-3 Technical Specifications changes and exemptions needed for the fall 2003 outage was also discussed.

The NRC staff expressed their appreciation for the presentation. No regulatory decisions were made.

/RA/

Brenda L. Mozafari, Senior Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-302

Enclosure:

Attendance List cc w/encl: See next page

ML032380579 OFFICE PDII-2/PM PDII-2/LA PDII-2/SC NAME BMozafari:mw EDunnington AHowe DATE 08/29/03 09/02/03 09/4/03 Meeting Summary dated Oct 2, 2002 Distribution:

PUBLIC PDII-2 R/F RidsNrrDlpm EHackett, RidsNrrDlpmLpdii AHowe, RidsNrrDlpmLpdii2 RidsNrrPMBMozafari EDunnington(paper copy)

JMundy, RidsRgn2MailCenter SRosenberg (e-mail)

RidsOgcMailCenter RidsAcrsAcnwMailCenter

ATTENDEES LIST FOR OCTOBER 3, 2002, MEETING WITH PROGRESS ENERGY TO DISCUSS CHANGES TO THE CRYSTAL RIVER UNIT 3 FUEL DESIGN PLANNED FOR THE NEXT CYCLE NAME AFFILIATION Tai L. Huang NRR/DSSA/SRXB Allen Howe NRR Steve Dembek NRR Drew Holland NRR Brenda Mozafari NRR Shih-Liang Wu NRR Undine Shoop NRR/SRXB Richard Harne Framatome ANP Jerry Holm Framatome ANP Sherry Bernhoft Progress Energy Leo Martin Progress Energy Sid Powell Progress Energy Mike Donovan Progress Energy/FPC Enclosure

Crystal River Nuclear Plant Unit 3 Florida Power Corporation cc:

Mr. R. Alexander Glenn Chairman Associate General Counsel (MAC-BT15A) Board of County Commissioners Florida Power Corporation Citrus County P.O. Box 14042 110 North Apopka Avenue St. Petersburg, Florida 33733-4042 Inverness, Florida 34450-4245 Mr. Jon A. Franke Mr. Donald L. Taylor Plant General Manager Manager Support Services Crystal River Nuclear Plant (NA2C) Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street 15760 W. Power Line Street Crystal River, Florida 34428-6708 Crystal River, Florida 34428-6708 Mr. Jim Mallay Mr. Daniel L. Roderick Framatome ANP Director Site Operations 1911 North Ft. Myer Drive, Suite 705 Crystal River Nuclear Plant (NA2C)

Rosslyn, Virginia 22209 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. William A. Passetti, Chief Department of Health Senior Resident Inspector Bureau of Radiation Control Crystal River Unit 3 2020 Capital Circle, SE, Bin #C21 U.S. Nuclear Regulatory Commission Tallahassee, Florida 32399-1741 6745 N. Tallahassee Road Crystal River, Florida 34428 Attorney General Department of Legal Affairs Mr. Richard L. Warden The Capitol Manager Nuclear Assessment Tallahassee, Florida 32304 Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Mr. Craig Fugate, Director Crystal River, Florida 34428-6708 Division of Emergency Preparedness Department of Community Affairs Mr. Dale E. Young, Vice President 2740 Centerview Drive Crystal River Nuclear Plant (NA1B)

Tallahassee, Florida 32399-2100 ATTN: Supervisor, Licensing