Summary of Meeting with Progress Energy (Brunswick, Harris, Robinson & Crystal River) Regarding Fire Protection Initiatives
ML050540216
Person / Time
Site: Harris, Brunswick, Crystal River, Robinson  Duke Energy icon.png
Issue date: 03/03/2005
From: Chandu Patel
NRC/NRR/DLPM/LPD2
To:
Carolina Power & Light Co
Patel C P, NRR/DLPM, 415-3025
References
Download: ML050540216 (8)


Text

March 3, 2005 LICENSEES:

Carolina Power & Light Company and Florida Power Corporation (Also doing business as Progress Energy)

FACILITIES:

Brunswick, Shearon Harris, H. B. Robinson, and Crystal River

SUBJECT:

SUMMARY

OF THE DECEMBER 9, 2004, MEETING WITH PROGRESS ENERGY TO DISCUSS FIRE PROTECTION INITIATIVES On December 9, 2004, the U.S. Nuclear Regulatory Commission (NRC) staff held a public meeting at the NRC Headquarters in Rockville, Maryland with Progress Energy (PE). PEs purpose for this meeting was to update the NRC staff on their current corporate plans with regard to ongoing fire protection (FP) initiatives. This meeting was classified as a Category 1 meeting, which provided an opportunity for the public to communicate with the NRC after the business portion, but before the meeting was adjourned. The list of attendees is attached. The meeting handouts provided by PE have been placed in the Agencywide Documents Access and Management System (ADAMS Accession No. ML043640269).

PE is planning to address site-specific safe shutdown analysis issues and planning to incorporate the latest industry information regarding cable failure modes and probabilities into each plants safe shutdown analysis. The outcome expected from this initiative is to improve safety and to have a consistent approach for all sites operated by PE. PE is considering the use of forward-looking tools (risk analysis tools) as well.

The safe shutdown analysis methodology involves validating cable locations, flow paths, and equipment selection, and analysis of fire-affected equipment. After gathering this information PE plans to determine design strategies to handle risk-significant or non-compliant findings.

Special consideration is being focused on the NRC's circuit analysis efforts and the feasibility of manual actions.

PE discussed its methodology, and the NRC staff provided feedback on the analysis. The Harris plant is leading the effort, having completed validating flow path, equipment selection, and locating cables. Harris is expected to be completed in 2005, with Brunswick, Robinson, and Crystal River 3 being completed in 2006. Problem resolution and modifications are not included in this schedule.

PE plans to use fire-rated cable to meet 10 CFR 50, Appendix R, III.G.2 requirements (or NUREG-0800 equivalent commitments). PE has been performing cable testing and plans to submit exemptions and deviations where appropriate as a possible resolution to findings.

Nothing in the PE presentation was intended to be a commitment. The NRC staff and licensee briefly discussed other topics such as Manual Action Feasibility and PEs internal initiatives.

The NRC staff found the meeting beneficial and found PEs efforts proactive. PE expressed its appreciation of the NRC staffs comments and the opportunity to present their ongoing efforts to improve their FP programs. No followup actions were identified.

/RA/

Chandu P. Patel, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-325, 50-324, 50-400, 50-261, and 50-302

Attachment:

List of Attendees cc w/att: See next page

ML050540216 NRC-001 OFFICE PDII-2/PM PDII-2/LA PDII-2/SC SPLB/DSSA NAME CPatel EDunnington MMarshall SWeerakoddy DATE 03/01/05 03/01/05 03/03/05 03/01/05

ATTENDANCE LIST NUCLEAR REGULATORY COMMISSION STAFF MEETING WITH PROGRESS ENERGY AT NRC HEADQUARTERS DECEMBER 9, 2004 Name Organization Chandu Patel NRC/NRR/DLPM/PDII Sunil Weerakkody NRC/NRR/DSSA/SPLB Daniel M. Frumkin NRC/NRR/DSSA/SPLB Paul W. Gaffney Progress Energy Chuck Baucom Progress Energy Ken Heffner Progress Energy Jeff Ertman Progress Energy Steve Hardy Progress Energy Fred Emerson NEI Frank Dola Progress Energy Frank Modlin Progress Energy John Kunzmann Progress Energy Michael Marshall NRC/NRR/DLPM/PDII Richard Dipert NRC/NRR/DSSA/SPLB Ray Gallucci NRC/NRR/DSSA/SPLB Albert Wong NRC/NRR/DSSA/SPLB Bob Radlinski NRC/NRR/DSSA/SPLB Bob Wolfgang NRC/NRR/DSSA/SPLB John Hannon NRC/NRR/DSSA/SPLB Robert Schin RII/DRS/EB (By Phone)

Terry Prince Engineering, Planning, & Management, Inc.

(By Phone)

Attachment

Crystal River Nuclear Plant Unit 3 Florida Power Corporation cc:

Mr. R. Alexander Glenn Associate General Counsel (MAC-BT15A)

Florida Power Corporation P.O. Box 14042 St. Petersburg, Florida 33733-4042 Mr. Jon A. Franke Plant General Manager Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. Jim Mallay Framatome ANP 1911 North Ft. Myer Drive, Suite 705 Rosslyn, Virginia 22209 Mr. William A. Passetti, Chief Department of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin #C21 Tallahassee, Florida 32399-1741 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Mr. Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 David T. Conley Associate General Counsel II - Legal Dept.

Progress Energy Service Company, LLC Post Office Box 1551 Raleigh, North Carolina 27602-1551 Chairman Board of County Commissioners Citrus County 110 North Apopka Avenue Inverness, Florida 34450-4245 Mr. Michael J. Annacone Engineering Manager Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. Daniel L. Roderick Director Site Operations Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708 Senior Resident Inspector Crystal River Unit 3 U.S. Nuclear Regulatory Commission 6745 N. Tallahassee Road Crystal River, Florida 34428 Mr. Richard L. Warden Manager Nuclear Assessment Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. Dale E. Young, Vice President Crystal River Nuclear Plant (NA1B)

ATTN: Supervisor, Licensing

& Regulatory Programs 15760 W. Power Line Street Crystal River, Florida 34428-6708

Carolina Power & Light Company cc:

David T. Conley, Associate General Counsel II Legal Department Progress Energy Service Company, LLC Post Office Box 1551 Raleigh, North Carolina 27602-1551 Ms. Margaret A. Force Assistant Attorney General State of North Carolina Post Office Box 629 Raleigh, North Carolina 27602 U. S. Nuclear Regulatory Commission Resident Inspector's Office H. B. Robinson Steam Electric Plant Route 5, Box 413 Hartsville, South Carolina 29550 Mr. William G. Noll, Director Site Operations H. B. Robinson Steam Electric Plant, Unit No. 2 Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina 29550 Ms. Beverly Hall, Section Chief N.C. Department of Environment and Natural Resources Division of Radiation Protection 3825 Barrett Dr.

Raleigh, North Carolina 27609-7721 Mr. Robert P. Gruber, Executive Director Public Staff N. C. Utilities Commission 4326 Mail Service Center Raleigh, North Carolina 27699-4326 Resident Inspector U. S. Nuclear Regulatory Commission Brunswick Steam Electric Plant 8470 River Road Southport, North Carolina 28461 Mr. John H. ONeill, Jr.

Shaw, Pittman, Potts & Trowbridge 2300 N Street, NW.

Washington, DC 20037-1128 Mr. J. W. Moyer, Vice President H. B. Robinson Steam Electric Plant, Unit No. 2 Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina 29550 Mr. Henry H. Porter, Assistant Director Division of Radioactive Waste Management South Carolina Department of Health and Environmental Control 2600 Bull Street Columbia, South Carolina 29201 Mr. Chris L. Burton, Manager Performance Evaluation and Regulatory Affairs, PEB 7 Progress Energy Post Office Box 1551 Raleigh, North Carolina 27602-1551 U. S. Nuclear Regulatory Commission Resident Inspectors Office Shearon Harris Nuclear Power Plant 5421 Shearon Harris Road New Hill, North Carolina 27562-9998 Mr. James Scarola, Vice President Shearon Harris Nuclear Power Plant Carolina Power & Light Company Post Office Box 165 New Hill, North Carolina 27562-0165 Mr. Cornelius J. Gannon, Vice President Brunswick Steam Electric Plant Carolina Power & Light Company Post Office Box 10429 Southport, North Carolina 28461-0429

Carolina Power & Light Company cc:

Mr. David R. Sandifer, Chairperson Brunswick County Board of Commissioners Post Office Box 249 Bolivia, North Carolina 28422 Mr. Robert J. Duncan II, Director Site Operations Shearon Harris Nuclear Power Plant Carolina Power & Light Company Post Office Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165 Mr. T. P. Cleary, Director Site Operations Brunswick Steam Electric Plant Carolina Power & Light Company Post Office Box 10429 Southport, North Carolina 28461-0429 Mr. David H. Hinds Plant General Manager Brunswick Steam Electric Plant Carolina Power & Light Company Post Office Box 10429 Southport, North Carolina 28461-0429 Mr. Norman R. Holden, Mayor City of Southport 201 East Moore Street Southport, North Carolina 28461 Public Service Commission State of South Carolina Post Office Drawer 11649 Columbia, South Carolina 29211 Mr. Warren Lee Emergency Management Director New Hanover County Department of Emergency Management Post Office Box 1525 Wilmington, North Carolina 28402-1525 Chairman of the North Carolina Utilities Commission Post Office Box 29510 Raleigh, North Carolina 27626-0510 Mr. C. T. Baucom Supervisor, Licensing/Regulatory Programs H. B. Robinson Steam Electric Plant, Unit No. 2 Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina 29550 Mr. Herb Council, Chair Board of County Commissioners of Wake County P.O. Box 550 Raleigh, North Carolina 27602 Mr. Edward T. ONeil Manager - Support Services Brunswick Steam Electric Plant Carolina Power & Light Company P.O. Box 10429 Southport, North Carolina 28461 J. F. Lucas, Manager Support Services - Nuclear H. B. Robinson Steam Electric Plant, Unit No. 2 Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina 29550 Mr. Terry C. Morton, Manager Support Services Shearon Harris Nuclear Power Plant Carolina Power & Light Company Post Office Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165 Mr. David H. Corlett, Supervisor Licensing/Regulatory Programs Shearon Harris Nuclear Power Plant Carolina Power & Light Company Post Office Box 165, Mail Zone 1 New Hill, North Carolina 27562-0165

Carolina Power & Light Company cc:

Mr. Dan Stoddard, Plant General Manager H. B. Robinson Steam Electric Plant, Unit No. 2 Carolina Power & Light Company 3581 West Entrance Road Hartsville, South Carolina 29550 Mr. Tommy Emerson, Chair Board of County Commissioners of Chatham County Post Office Box 87 Pittsboro, North Carolina 27312 Mr. C. S. Hinnant, Senior Vice President Nuclear Generation & Chief Nuclear Officer Progress Energy CPB 12 Post Office Box 1551 Raleigh, North Carolina 27602-1551