ML092310005

From kanterella
Jump to navigation Jump to search
Public Meeting Summary - License Renewal Inspection Results Crystal River Nuclear Plant
ML092310005
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/19/2009
From: Mark Franke
NRC/RGN-II/DRS/EB3
To: Franke J
Progress Energy Florida
References
Download: ML092310005 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 August 19, 2009 Mr. Jon Franke, Vice President Crystal River Nuclear Plant (NA1B)

ATTN: Supervisor, Licensing &

Regulatory Programs 15760 West Power Line Street Crystal River, FL 34428-6708

SUBJECT:

PUBLIC MEETING

SUMMARY

- LICENSE RENEWAL INSPECTION RESULTS CRYSTAL RIVER NUCLEAR PLANT - DOCKET NO. 50 - 302 Dear Mr. Franke On August 14, 2009, the Nuclear Regulatory Commission (NRC or the staff) conducted a public meeting at the Crystal River Nuclear Plant EOF/Training Center in Crystal River, FL. The purpose of the meeting was to present the results of a License Renewal Inspection conducted from July 27 to August 13, 2009 for Crystal River Unit 3.

In opening remarks, Mr. M. Franke of the NRC staff briefly described the license renewal process and how the inspection was part of the safety review portion of the process. Mr. L.

Lake of the NRC staff presented the results of the inspection. The public was invited to observe the meeting and had opportunities to communicate with the NRC after the business portion of the meeting, before the meeting was adjourned.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and enclosure will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact me at 404-562-6349.

Sincerely,

/RA/

Mark Franke Branch Chief, Engineering Branch 3 Division of Reactor Safety

Enclosure:

List of Attendees cc w/encl.: (See page 2)

FPC 2

cc w/encl:

R. J. Duncan, II Vice President Nuclear Operations Carolina Power & Light Company Electronic Mail Distribution Brian C. McCabe Manager, Nuclear Regulatory Affairs Progress Energy Carolinas, Inc.

Electronic Mail Distribution James W. Holt Plant General Manager Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution Stephen J. Cahill Engineering Manager Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution R. Alexander Glenn Associate General Counsel (MAC - BT15A)

Florida Power Corporation Electronic Mail Distribution Steven R. Carr Associate General Counsel Legal Department Progress Energy Service Company, LLC P.O. Box 1551 Raleigh, NC 27602-1551 Christos Kamilaris Director Fleet Support Services Carolina Power & Light Company Electronic Mail Distribution William A. Passetti Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution Daniel R. Westcott Supervisor Licensing & Regulatory Programs Crystal River Nuclear Plant (NA1B)

Electronic Mail Distribution Thomas D. Walt Vice President Nuclear Oversight Carolina Power and Light Company Electronic Mail Distribution Jack E. Huegel Manager, Nuclear Oversight Crystal River Nuclear Plant Electronic Mail Distribution Mark Rigsby Manager, Support Services - Nuclear Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution Senior Resident Inspector U.S. Nuclear Regulatory Commission Crystal River Nuclear Generating Plant U.S. NRC 6745 N Tallahassee Rd Crystal River, FL 34428 Attorney General Department of Legal Affairs The Capitol PL-01 Tallahassee, FL 32399-1050 Craig Fugate Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution Chairman Board of County Commissioners Citrus County 110 N. Apopka Avenue Inverness, FL 36250

X SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS RII:DRS RII:DRP SIGNATURE

/RA/

/RA/

/RA/

NAME M. Franke L. Lake M. Sykes DATE 8/19/2009 8/18/2009 8/ /2009 8/18/2009 8/ /2009 8/ /2009 8/ /2009 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO

Enclosure LIST OF ATTENDEES Crystal River Unit 3 Public Meeting August 14, 2009 Participants Affiliation Mark Franke US Nuclear Regulatory Commission (NRC)

Louis Lake NRC Robert Carrion NRC Joel Rivera - Ortiz NRC Eugene Huang NRC Cecil Fletcher NRC Tom Morrissey NRC Roger Hannah NRC Jon Franke Progress Energy Nuclear (PGN)

Michael Heath PGN Dennis Herrin PGN M. D. Rigsby PGN Ernie Kapopoulos PGN Blair Wunderly PGN Steve Cahill PGN John H. Ring Public Norman Hopkins Public Ron Finnin Public Chris Staubus Public Brad Myers Public Jim Brenson Public Ron Bright Public Roger Foderingham Public Mark P. Klutho Public