Letter Sequence Other |
---|
|
|
MONTHYEAR3F1222-01, Nuclear Power Station - License Amendment Request 262 Addition of License Condition 2.C.21, License Termination Plan2022-12-12012 December 2022 Nuclear Power Station - License Amendment Request 262 Addition of License Condition 2.C.21, License Termination Plan Project stage: Request ML23103A1922023-04-19019 April 2023 Request for Supplemental Information Enclosure Project stage: Other ML23103A1892023-04-19019 April 2023 Nuclear Generating Plant - NRC Request for Supplemental Information (License No. DPR-72, Docket Nos. 50-302 and 72-1035) Project stage: Request ML23103A1902023-04-19019 April 2023 Request for Supplemental Information Cover Letter Project stage: Other 3F0623-02, Maintenance Support Building2023-06-0909 June 2023 Maintenance Support Building Project stage: Request ML23187A1112023-07-25025 July 2023 Acceptance of Requested Licensing Action License Request to Add License Condition to Include License Termination Plan Requirements Project stage: Acceptance Review ML23310A0722023-11-0707 November 2023 Audit Plan - Crystal River Unit 3 Nuclear Generating Plant LTP Project stage: Other ML23310A0712023-11-0707 November 2023 Audit Plan Cover Letter - Crystal River Unit 3 Nuclear Generating Plant LTP Project stage: Other ML23310A0632023-11-0707 November 2023 Audit Plan - Crystal River Unit 3 Nuclear Generating Plant LTP Project stage: Request ML23354A0572023-12-22022 December 2023 License Termination Plan Request for Additional Information Project stage: Request ML23354A0632023-12-22022 December 2023 Cover Letter - Crystal River License Termination Plan Request for Additional Information Project stage: RAI ML23354A0642023-12-22022 December 2023 Enclosure - Crystal River License Termination Plan Request for Additional Information Project stage: RAI ML24030A7482024-02-12012 February 2024 Audit Report Cover Letter and Report - Crystal River Unit 3 Nuclear Generating Plant LTP Project stage: Other ML24030A7472024-02-13013 February 2024 Audit Report Attachment - Crystal River Unit 3 Nuclear Generating Plant LTP Project stage: Other ML24054A6462024-02-29029 February 2024 Request for RAI Extension Related to the Crystal River License Termination Plan Project stage: Request ML24054A6452024-02-29029 February 2024 Letter - Reply to Request for RAI Extension Related to the Crystal River License Termination Plan Project stage: RAI ML24054A5412024-02-29029 February 2024 Response to Request for Additional Information Extension Project stage: Request ML24089A0362024-03-29029 March 2024 Response to Audit Plan in Support of Accelerated Decommissioning Partners and Request to Add License Condition to Include License Termination Plan Requirements. W/Enclosures 1 to 5 Project stage: Other 3F0824-02, Withdrawal of License Amendment Request to Add License Condition 2.C.21, License Termination Plan, Proposed Change Number 2622024-08-12012 August 2024 Withdrawal of License Amendment Request to Add License Condition 2.C.21, License Termination Plan, Proposed Change Number 262 Project stage: Withdrawal ML24226B2392024-08-27027 August 2024 Application for License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Acknowledgement of Withdrawal Project stage: Other 2023-07-25
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000302/20240012024-09-23023 September 2024 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3, NRC Inspection Report No. 05000302/2024001 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24226B2392024-08-27027 August 2024 Application for License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Acknowledgement of Withdrawal ML24179A0702024-07-26026 July 2024 SHPO S106 Completion Crystal River Unit 3 ML24205A2192024-07-24024 July 2024 Tribal S106 Completion Crystal River Unit 3: Muscogee Nation ML24205A2182024-07-24024 July 2024 Tribal S106 Completion Crystal River Unit 3: Seminole Nation of Oklahoma ML24179A0912024-07-24024 July 2024 Tribal S106 Completion Crystal River Unit 3: Seminole Tribe of Florida ML24205A2202024-07-24024 July 2024 Tribal S106 Completion Crystal River Unit 3_Miccosukee Tribe of Florida ML24190A1912024-07-0808 July 2024 Fws Concurrence for Crystal River Unit 3 ML24172A2552024-06-20020 June 2024 Fws to NRC Species List: Florida Ecological Services Field Office 06/20/2024 ML24170A9242024-06-18018 June 2024 024-0023697 Crystal River License Termination Plan Unit 3 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24114A2262024-04-24024 April 2024 Amended Special Package Authorization for the Cr3 Middle Package (Crystal River 3 Middle Package - Docket No. 71-9393) IR 05000302/20230022024-04-17017 April 2024 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report No. 05000302/2023002 ML24054A0612024-04-0202 April 2024 Request to Initiate Section 106 Consultation Regarding the License Termination Plan for Crystal River Unit 3 in Citrus County, Florida ML24079A2492024-04-0202 April 2024 Tribal S106 Initiation Crystal River Unit 3-Johnson, Lewis Johnson ML24054A0582024-04-0202 April 2024 Achp S106 Initiation Crystal River Unit 3 - Letter 1 ML24079A2472024-04-0202 April 2024 Tribal S106 Initiation Crystal River Unit 3-Cypress, Talbert ML24079A2482024-04-0202 April 2024 Tribal S106 Initiation Crystal River Unit 3-Hill, David Hill ML24054A0812024-04-0202 April 2024 Tribal S106 Initiation Crystal River Unit 3-Osceola, Marcellus ML24089A0362024-03-29029 March 2024 Response to Audit Plan in Support of Accelerated Decommissioning Partners and Request to Add License Condition to Include License Termination Plan Requirements. W/Enclosures 1 to 5 ML24073A1922024-03-11011 March 2024 Fws to NRC, List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project ML24054A6452024-02-29029 February 2024 Letter - Reply to Request for RAI Extension Related to the Crystal River License Termination Plan ML24030A7482024-02-12012 February 2024 Audit Report Cover Letter and Report - Crystal River Unit 3 Nuclear Generating Plant LTP ML23342A0942024-01-0909 January 2024 – Independent Spent Fuel Storage Installation Security Inspection Plan ML23354A0632023-12-22022 December 2023 Cover Letter - Crystal River License Termination Plan Request for Additional Information ML23345A1882023-12-0606 December 2023 Fws to NRC Crystal River Species List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project ML23320A2592023-11-17017 November 2023 STC-23 077 Notification of the Crystal River Unit 3 Generating Plant License Termination Plan Public Meeting and Federal Register Notice ML23313A1322023-11-15015 November 2023 Request for Additional Information for the Environmental Assessment of the License Termination Plan for Crystal River Unit 3 Nuclear Generating Plant ML23310A0712023-11-0707 November 2023 Audit Plan Cover Letter - Crystal River Unit 3 Nuclear Generating Plant LTP ML23187A1112023-07-25025 July 2023 Acceptance of Requested Licensing Action License Request to Add License Condition to Include License Termination Plan Requirements ML23107A2722023-06-13013 June 2023 Letter Transmitting NRC Survey Results for East Settling Pond ML23160A2962023-06-0909 June 2023 Response to Crystal River, Unit 3 – Supplemental Information Needed for Acceptance on the Application for a License Amendment Regarding Approval of the License Termination Plan ML23107A2732023-06-0707 June 2023 Orise Independent Survey Report Dcn 5366-SR-01-0 IR 05000302/20220032023-05-25025 May 2023 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report No. 05000302/2022003 ML23103A1902023-04-19019 April 2023 Request for Supplemental Information Cover Letter ML23058A2532023-03-22022 March 2023 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River, Unit 3 - NRC Inspection Report No. 05000302/2022003 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22265A0192022-09-26026 September 2022 Nuclear Generating Plant - U.S. Nuclear Regulatory Commissions Analysis of ADP CR3, LLCs Decommissioning Funding Status Report (License No. DPR-72, Docket Nos. 50-302 and 72-1035) IR 05000302/20220022022-08-0909 August 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report 05000302/2022002 IR 05000302/20220012022-05-0303 May 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report 05000302/2022001 ML22116A1752022-04-27027 April 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3- Independent Spent Fuel Storage Installation Security Inspection Report 07201035/2022401 ML22105A3992022-04-18018 April 2022 Nuclear Generating Plant - Change in NRC Project Manager ML22011A1362022-01-31031 January 2022 Independent Spent Fuel Storage Installation Security Inspection Plan ML22024A2142022-01-24024 January 2022 Nuclear Generating Plant - NMFS NRC Letter - Crystal River Energy Complex Biological Opinion Status (License No. DPR-72, Docket Nos. 50-302 and 72-1035) IR 05000302/20210042022-01-24024 January 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report No. 05000302/2021004 ML21351A0052021-12-20020 December 2021 NRC Analysis of ADP CR3, LLC Decommissioning Funding Status Report for the Crystal River Unit 3 Nuclear Generating Plant (License No. DPR-72, Docket Nos. 50-302 and 72-1035) ML21322A2702021-11-24024 November 2021 Nuclear Generating Plant - Issuance of Amendment No. 260 Approving the Independent Spent Fuel Storage Installation Only Security Plan, Rev 3 IR 05000302/20210032021-11-0909 November 2021 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report Nos. 05000302/2021003 and 07201035/2021001 ML21288A4292021-10-18018 October 2021 Letter - Crystal River Unit 3 Nuclear Generating Plant - Correction to Safety Evaluation Related to the Issuance of Amendment No. 259 Approving the Independent Spent Fuel Storage Installation Only Emergency Plan 2024-09-23
[Table view] Category:Report
MONTHYEAR3F0324-03, Enclosures 10 - 17: Crystal River, Unit 3, Response to Request for Additional Information2024-03-31031 March 2024 Enclosures 10 - 17: Crystal River, Unit 3, Response to Request for Additional Information ML24090A0042024-03-29029 March 2024 Enclosure 6, Part 1: Crystal River, Unit 3 - Appendix E – CHAR-05 Site Characterization of Buildings ML24030A7472024-02-13013 February 2024 Audit Report Attachment - Crystal River Unit 3 Nuclear Generating Plant LTP ML24030A7482024-02-12012 February 2024 Audit Report Cover Letter and Report - Crystal River Unit 3 Nuclear Generating Plant LTP ML23345A1882023-12-0606 December 2023 Fws to NRC Crystal River Species List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project ML24090A0052023-10-10010 October 2023 Enclosure 6, Part 2: Crystal River, Unit 3, DD Survey 23-10-0096 ML23160A2962023-06-0909 June 2023 Response to Crystal River, Unit 3 – Supplemental Information Needed for Acceptance on the Application for a License Amendment Regarding Approval of the License Termination Plan ML23160A2972023-06-0909 June 2023 CR3 Site Characterization Survey Report (CHAR-01) Impacted Open Land Survey Areas 3F0623-02, Maintenance Support Building2023-06-0909 June 2023 Maintenance Support Building ML23160A2982023-06-0909 June 2023 Site Characterization Surveys ML23107A2732023-06-0707 June 2023 Orise Independent Survey Report Dcn 5366-SR-01-0 3F0522-01, Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 20222022-05-17017 May 2022 Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 2022 3F0520-01, Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 20202020-05-18018 May 2020 Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 2020 3F0320-01, NRC Commitment Change Report - March 20202020-03-17017 March 2020 NRC Commitment Change Report - March 2020 ML19343A8252019-12-0606 December 2019 Letter from Erika Bailey, Oak Ridge Institute for Science and Education, to John Hickman, NRC, Forwarding Independent Confirmatory Survey Summary and Results for the 3,854-Acre Area Partial Site Release at the Crystal River Energy Complex ML19022A0762019-01-22022 January 2019 Partial Site Release Request ML19029A0092018-11-0707 November 2018 Reference 16 - Defueled Safety Analysis Report DSAR-R002 ML18303A2942018-06-21021 June 2018 Golder Associates, Inc. - Citrus Combined Cycle Project - CFR 122.21(r) Report 3F0518-03, Safety Analysis Report and 10 CFR 50.59 - 10 CFR 72.48 Report - May 20182018-05-24024 May 2018 Safety Analysis Report and 10 CFR 50.59 - 10 CFR 72.48 Report - May 2018 ML16176A3392016-10-28028 October 2016 Decommissioning Lessons Learned Report and Transmittal Memorandum ML19029A0102016-06-28028 June 2016 Reference 3 - Crystal River, Unit 3, Historical Site Assessment Rev. 00 3F0616-02, Nrg Commitment Change Report - June 20162016-06-14014 June 2016 Nrg Commitment Change Report - June 2016 ML13343A1782013-12-31031 December 2013 Report P23-1680-001, Rev. 0, Site-Specific Decommissioning Cost Estimate for Crystal River Unit 3 Nuclear Generating Plant. 3F0113-08, Attachment D: ANP-3195(NP), Revision 0, Response for Crystal River Unit 3, EPU Licensing Amendment Report NRC Reactor Systems Branch Requests for Additional Information (Non-Proprietary) and Attachment E: Location of Reactor Systems RAI Re2013-01-31031 January 2013 Attachment D: ANP-3195(NP), Revision 0, Response for Crystal River Unit 3, EPU Licensing Amendment Report NRC Reactor Systems Branch Requests for Additional Information (Non-Proprietary) and Attachment E: Location of Reactor Systems RAI Res 3F1112-01, Alion Technical Report ALION-PLN-ENER-8706-02, Rev. 0, Crystal River 3: Bypass Fiber Quantity Test Plan2012-11-0707 November 2012 Alion Technical Report ALION-PLN-ENER-8706-02, Rev. 0, Crystal River 3: Bypass Fiber Quantity Test Plan 3F1112-02, 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 174 of 250 Through Page 250 of 2502012-10-31031 October 2012 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 174 of 250 Through Page 250 of 250 ML12314A3932012-10-31031 October 2012 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 81 of 250 Through Page 173 of 250 ML12314A3922012-10-31031 October 2012 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 1 of 250 Through Page 80 of 250 3F0912-01, ANP-3156 Np, Crystal River 3 EPU Boric Acid Precipitation RAI Responses, Attachment C2012-09-30030 September 2012 ANP-3156 Np, Crystal River 3 EPU Boric Acid Precipitation RAI Responses, Attachment C 3F0712-03, Attachment E to 3F0712-03, Technical Report, ANP-3052, Rev. 2, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip.2012-06-30030 June 2012 Attachment E to 3F0712-03, Technical Report, ANP-3052, Rev. 2, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip. ML12314A3912012-05-31031 May 2012 17877-0002-100, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment 2 ML12205A3582012-05-31031 May 2012 Attachment D to 3F0712-03, Technical Report, ANP-3114(NP), Rev. 0, CR-3 EPU - Feedwater Line Break Analysis Sensitivity Studies. ML12284A1382012-05-25025 May 2012 Report EGS-TR-HC589-01, Seismic Qualification Test Report for Structural Verification Testing of Iccms Cabinet Assembly. 3F0512-01, NRC Commitment Change Report - May 20122012-05-14014 May 2012 NRC Commitment Change Report - May 2012 3F0112-04, Response to Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch Technical Review of the CR-3 Extended Power Uprate LAR2012-01-0505 January 2012 Response to Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch Technical Review of the CR-3 Extended Power Uprate LAR ML12205A3572011-12-15015 December 2011 Attachment a to 3F0712-03, CR-3 LOCA Summary Report - EPU/ROTSG/Mark-B-HTP, Revision 4 3F1211-14, Summary of Changes to Evaluation Models and Peak Cladding Temperature for Large Break Loss of Coolant Analysis and Small Break Loss of Coolant Analysis2011-12-14014 December 2011 Summary of Changes to Evaluation Models and Peak Cladding Temperature for Large Break Loss of Coolant Analysis and Small Break Loss of Coolant Analysis 3F1011-08, ANP-3052, Rev. 0, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip2011-10-25025 October 2011 ANP-3052, Rev. 0, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip ML11237A0682011-08-0505 August 2011 Siemens Technical Report CT-27438, Missile Probability Analysis Report Progress Energy Crystal River 3, Revision 1A ML11207A4442011-06-15015 June 2011 Attachment 7- Crystal River Unit 3 Extended Power Uprate Technical Report 3F0511-02, Response to Request for Additional Information Required for the Development of the Confirmatory LOCA and Non-LOCA Models2011-05-0606 May 2011 Response to Request for Additional Information Required for the Development of the Confirmatory LOCA and Non-LOCA Models ML1101906672010-10-0404 October 2010 Levy, Units 1 and 2, Cola (Sensitive Material), Rev. 2 - Levy County Emergency Plan Part 02 - Draft (Redacted) 3F0910-01, CFR 50.46 Notification of Change in Peak Cladding Temperature for Small Break Loss of Coolant Accident Analysis2010-09-0808 September 2010 CFR 50.46 Notification of Change in Peak Cladding Temperature for Small Break Loss of Coolant Accident Analysis ML1019304172010-05-0606 May 2010 Tritium Database Report ML1010603472010-04-0909 April 2010 5.2.2.4.4. Quality Control and Nondestructive Testing ML1028710882010-03-12012 March 2010 7.6 Vibration Due to Cutting Tendons ML1028711112010-02-25025 February 2010 7.11 Added Stress from Pulling Tendons ML1028711102010-02-23023 February 2010 6.3 Thermal Effects of Greasing ML1028804682010-02-19019 February 2010 7.9 Inadequate Hydro Blasting Nozzles Rate Part 3 ML1028711212010-02-19019 February 2010 7.10 Hydrodemolition Induced Cracking 2024-03-31
[Table view] Category:Technical
MONTHYEAR3F0324-03, Enclosures 10 - 17: Crystal River, Unit 3, Response to Request for Additional Information2024-03-31031 March 2024 Enclosures 10 - 17: Crystal River, Unit 3, Response to Request for Additional Information ML24090A0042024-03-29029 March 2024 Enclosure 6, Part 1: Crystal River, Unit 3 - Appendix E – CHAR-05 Site Characterization of Buildings ML24030A7472024-02-13013 February 2024 Audit Report Attachment - Crystal River Unit 3 Nuclear Generating Plant LTP ML24030A7482024-02-12012 February 2024 Audit Report Cover Letter and Report - Crystal River Unit 3 Nuclear Generating Plant LTP ML23345A1882023-12-0606 December 2023 Fws to NRC Crystal River Species List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project ML24090A0052023-10-10010 October 2023 Enclosure 6, Part 2: Crystal River, Unit 3, DD Survey 23-10-0096 3F0623-02, Maintenance Support Building2023-06-0909 June 2023 Maintenance Support Building ML23160A2982023-06-0909 June 2023 Site Characterization Surveys ML23160A2972023-06-0909 June 2023 CR3 Site Characterization Survey Report (CHAR-01) Impacted Open Land Survey Areas ML23160A2962023-06-0909 June 2023 Response to Crystal River, Unit 3 – Supplemental Information Needed for Acceptance on the Application for a License Amendment Regarding Approval of the License Termination Plan ML23107A2732023-06-0707 June 2023 Orise Independent Survey Report Dcn 5366-SR-01-0 3F0522-01, Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 20222022-05-17017 May 2022 Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 2022 3F0520-01, Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 20202020-05-18018 May 2020 Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 2020 3F0320-01, NRC Commitment Change Report - March 20202020-03-17017 March 2020 NRC Commitment Change Report - March 2020 ML19343A8252019-12-0606 December 2019 Letter from Erika Bailey, Oak Ridge Institute for Science and Education, to John Hickman, NRC, Forwarding Independent Confirmatory Survey Summary and Results for the 3,854-Acre Area Partial Site Release at the Crystal River Energy Complex ML19022A0762019-01-22022 January 2019 Partial Site Release Request ML19029A0092018-11-0707 November 2018 Reference 16 - Defueled Safety Analysis Report DSAR-R002 ML18303A2942018-06-21021 June 2018 Golder Associates, Inc. - Citrus Combined Cycle Project - CFR 122.21(r) Report 3F0518-03, Safety Analysis Report and 10 CFR 50.59 - 10 CFR 72.48 Report - May 20182018-05-24024 May 2018 Safety Analysis Report and 10 CFR 50.59 - 10 CFR 72.48 Report - May 2018 ML19029A0102016-06-28028 June 2016 Reference 3 - Crystal River, Unit 3, Historical Site Assessment Rev. 00 ML13343A1782013-12-31031 December 2013 Report P23-1680-001, Rev. 0, Site-Specific Decommissioning Cost Estimate for Crystal River Unit 3 Nuclear Generating Plant. 3F1112-01, Alion Technical Report ALION-PLN-ENER-8706-02, Rev. 0, Crystal River 3: Bypass Fiber Quantity Test Plan2012-11-0707 November 2012 Alion Technical Report ALION-PLN-ENER-8706-02, Rev. 0, Crystal River 3: Bypass Fiber Quantity Test Plan ML12314A3932012-10-31031 October 2012 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 81 of 250 Through Page 173 of 250 ML12314A3922012-10-31031 October 2012 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 1 of 250 Through Page 80 of 250 3F1112-02, 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 174 of 250 Through Page 250 of 2502012-10-31031 October 2012 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 174 of 250 Through Page 250 of 250 3F0912-01, ANP-3156 Np, Crystal River 3 EPU Boric Acid Precipitation RAI Responses, Attachment C2012-09-30030 September 2012 ANP-3156 Np, Crystal River 3 EPU Boric Acid Precipitation RAI Responses, Attachment C 3F0712-03, Attachment E to 3F0712-03, Technical Report, ANP-3052, Rev. 2, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip.2012-06-30030 June 2012 Attachment E to 3F0712-03, Technical Report, ANP-3052, Rev. 2, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip. ML12205A3582012-05-31031 May 2012 Attachment D to 3F0712-03, Technical Report, ANP-3114(NP), Rev. 0, CR-3 EPU - Feedwater Line Break Analysis Sensitivity Studies. ML12314A3912012-05-31031 May 2012 17877-0002-100, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment 2 ML12284A1382012-05-25025 May 2012 Report EGS-TR-HC589-01, Seismic Qualification Test Report for Structural Verification Testing of Iccms Cabinet Assembly. ML12205A3572011-12-15015 December 2011 Attachment a to 3F0712-03, CR-3 LOCA Summary Report - EPU/ROTSG/Mark-B-HTP, Revision 4 3F1011-08, ANP-3052, Rev. 0, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip2011-10-25025 October 2011 ANP-3052, Rev. 0, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip ML11237A0682011-08-0505 August 2011 Siemens Technical Report CT-27438, Missile Probability Analysis Report Progress Energy Crystal River 3, Revision 1A ML11207A4442011-06-15015 June 2011 Attachment 7- Crystal River Unit 3 Extended Power Uprate Technical Report ML1101906672010-10-0404 October 2010 Levy, Units 1 and 2, Cola (Sensitive Material), Rev. 2 - Levy County Emergency Plan Part 02 - Draft (Redacted) ML1010603472010-04-0909 April 2010 5.2.2.4.4. Quality Control and Nondestructive Testing ML1028711122010-02-19019 February 2010 7.9 Inadequate Hydro Blasting Nozzles Rate Part 1 ML1028804682010-02-19019 February 2010 7.9 Inadequate Hydro Blasting Nozzles Rate Part 3 ML1028711212010-02-19019 February 2010 7.10 Hydrodemolition Induced Cracking ML1028711132010-02-19019 February 2010 7.9 Inadequate Hydro Blasting Nozzles Rate Part 2 ML1028711452010-02-18018 February 2010 7.8 Excessive Water Jet Pressure Part 1 ML1028711462010-02-18018 February 2010 7.8 Excessive Water Jet Pressure Part 2 ML1028804582010-02-18018 February 2010 7.8 Excessive Water Jet Pressure Part 3 ML1028711482010-02-0707 February 2010 7.2 Vibration Induced by Hydro Blasting Part 1 ML1028711492010-02-0707 February 2010 7.2 Vibration Induced by Hydro Blasting Part 2 ML1028702832010-02-0303 February 2010 6.6 Original Tensioning T(2) ML1028702912010-02-0202 February 2010 6.5 Inadequate RetensioningT1 ML1028704062010-01-27027 January 2010 Email - from: Dyksterhouse, Don (Don.Dyksterhouse@Pgnmail.Com) to: Lake, Louis Dated Wednesday, January 27, 2010 Design Basis Calculations Attachments: 0102-0135-02 Concrete Strength and Elastic.... Ro Final.Pdf; 0102-0135-03 Ro Final.Pdf; ML1028706922010-01-22022 January 2010 Ctl 059169 Final Report.Pdf ML1028805162010-01-16016 January 2010 Email - from: Miller, Craig L (Craig.Miller@Pgnmail.Com) to: Lake, Louis; Thomas, George; Carrion, Robert; 'Trowe@Wje.Com'; Sealey, Mac Cc: Williams, Charles R. Dated Saturday, January 16, 2010 1:19PM Subject: Failure Mode 2.6 for Review.. 2024-03-31
[Table view] |
Text
Mr. Billy Reid, Site Executive ADP CR3, LLC 157060 West Power Line Street Crystal River, FL 34428
SUBJECT:
CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT - AUDIT REPORT FOR ACCELERATED DECOMMISSIONING PARTNERS CRYSTAL RIVER REQUEST TO ADD LICENSE CONDITION TO INCLUDE TERMINATION PLAN REQUIREMENTS (EPID NO. L-2022-LLA-0194)
Dear Mr. Reid:
By letter dated December 12, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22355A441), as supplemented by letter dated June 9, 2023 (ML23163A063), Accelerated Decommissioning Partners Crystal River Unit 3, LLC (ADP CR3)
(the licensee) requested U.S. Nuclear Regulatory Commission (NRC) approval of a request to add a condition to include License Termination Plan (LTP) requirements to NRC License No. DPR-72 for the Crystal River Unit 3 Nuclear Generating Plant (CR3).
The proposed amendment would approve the LTP and add License Condition 2.C.21, which establishes the criteria for determining when changes to the LTP require NRC approval. The LTP will be implemented by the licensee to complete decommissioning activities at the CR3 site. Once decommissioning is complete, a separate request will be made to the NRC by the licensee to terminate the CR3 license.
Enclosed is a report on the regulatory audit conducted by the NRC staff from November 13, 2023, to January 19, 2024, in connection with its review of the CR3 LTP application. The audit report does not make any regulatory conclusions or findings, but is part of the administrative record of the NRC staffs review of the application and may provide information supporting the NRC staffs safety evaluation of the CR3 LTP. The audit followed the plan provided by letter dated November 7, 2023 (ML23310A063), unless otherwise noted in the enclosed report.
In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
February 12, 2024 If you have any questions, please contact Timothy Barvitskie at (301)-415-2480 or by electronic mail at timothy.barvitskie@nrc.gov, or me at (301)-415-6634 or by electronic mail at jack.parrott@nrc.gov.
Sincerely, Jack D. Parrott, Senior Project Manager Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery and Waste Projects Office of Nuclear Material Safety and Safeguards Docket No. 50-302 License No. DPR-72
Enclosure:
Audit Report cc w/enclosure: Crystal River Listserv Signed by Parrott, Jack on 02/12/24
ML24030A748 OFFICE NMSS/DUWP/RDB NMSS/DUWP/RDB NMSS/DUWP/RDB NMSS/DUWP/RDB NAME TBarvitskie TBMDoell MDSAnderson SA JParrott JP DATE Feb 05, 2024 Feb 06, 2024 Feb 07, 2024 Feb 12, 2024
OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS
REGULATORY AUDIT
SUMMARY
REGARDING LICENSE AMENDMENT REQUEST TO APPROVE THE
LICENSE TERMINATION PLAN (LTP) AND ADD A LICENSE CONDITION
THAT ESTABLISHES THE CRITERIA FOR DETERMINING WHEN
A CHANGE TO THE LTP REQUIRES PRIOR NRC APPROVAL
ACCELERATED DECOMMISSIONING PARTNERS CRYSTAL RIVER UNIT 3
CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT
DOCKET NO. 50-302
1.0 BACKGROUND
By letter dated December 12, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22355A441), as supplemented by letter dated June 9, 2023 (ML23163A063), Accelerated Decommissioning Partners Crystal River Unit 3, LLC (ADP CR3, the licensee) requested U.S. Nuclear Regulatory Commission (NRC) approval of a license amendment request (LAR) to add a condition to include License Termination Plan (LTP) requirements to NRC License No. DPR-72 for the Crystal River Unit 3 Nuclear Generating Plant (CR3).
The proposed LAR would approve the CR3 LTP and add License Condition 2.C.21, which establishes the criteria for determining when changes to the LTP require prior NRC approval.
The LTP will be implemented by the licensee to complete decommissioning activities at the CR3 site. Once decommissioning is complete, a separate request will be made to the NRC by the licensee to terminate the CR3 license.
This report summarizes the regulatory audit conducted by the NRC staff from November 13, 2023, to January 19, 2024, in connection with its review of the CR3 LTP application. The audit report does not make any regulatory conclusions or findings, but is part of the administrative record of the NRC staffs review of the application and may provide information supporting the NRC staffs safety evaluation of the CR3 LTP. The audit followed the plan provided by letter dated November 7, 2023 (ML23310A063), unless otherwise noted in this audit report.
Enclosure 2.0 AUDIT DATES AND LOCATION
The regulatory audit was conducted from November 13, 2023, to January 19, 2024, via an online portal established by the licensee that allowed the NRC staff to view documents remotely via the internet and included and onsite portion at the CR3 site in Crystal River, Florida from December 4 to December 8, 2023.
3.0 AUDIT ACTIVITIES
On November 13, 2023, a virtual entrance meeting for the audit was held between the NRC staff and representatives of ADP CR3 to discuss the audit process and provide an overview of the specific focus topics provided to the licensee in the audit plan (ML23310A063). The purpose of the entrance meeting was to provide an overview of the audit process and to ensure clarity and understanding regarding the topics outlined in the audit plan.
Prior to commencement of the audit, the NRC staff reviewed the LTP LAR and provided preliminary discussion topics for the audit by email on November 17, 2023 which are described in the attachment to this audit report. On November 29, 2023, the licensee established the online portal requested in Section VI of the NRCs audit plan.
The NRC staff discussed the specific focus topics and the information the licensee provided in the online portal with representatives of ADP CR3 during the onsite audit from December 4 to December 8, 2023, and through virtual meetings held between the NRC staff and ADP CR3 following the onsite portion of the audit on December 14, 2023, January 9, 2024, and January 16, 2024. In addition, during the onsite portion of the audit ADP CR3 conducted a site tour of CR3, which helped further NRC staffs understanding of the site layout and relationship to facility structures as they relate to information described in the LTP.
Technical discussions during the audit were focused on the following major areas: compliance with radiological criteria for license termination (CRCLT), hydrology and groundwater (HGW),
site characterization (SC), plans for radiological site remediation (PRSR), and the final radiation survey plan (FSS). During the onsite portion of the audit, various topics were discussed within each of the major areas, as summarized in the attachment to this audit report.
The NRC staff and the licensee discussed and determined closure paths at the conclusion of each topic, as applicable. For CRCLT, the discussions involved the overall approach to considering multiple contaminated media, the applicability of the building occupancy conceptual model to subsurface structures, the approach to accounting for dose contributions from hard-to detect radionuclides, and the justification for key modeling parameters. For HGW, the discussions focused on the conceptual site model, the potential dose from existing groundwater contamination, and support for input parameter values for the groundwater pathway in the dose models. However, staff understands that the licensee may instead demonstrate that the saturated groundwater zone does not meet the definition of an aquifer, thus removing the groundwater pathway from dose models.
For SC, the discussions included characterization measurement and sampling methodology and results for surface and subsurface soils, building interiors, building basement structures, embedded piping, and backfill materials, and survey unit classification. For PRSR, the discussion was comprised of the as low as reasonably achievable (ALARA) analysis and the inputs to the ALARA calculations. For FSS, the discussion focused on final status survey design and implementation, including instrument sensitivity, radionuclide fractions, surrogate
radionuclides, insignificant contributors, investigation levels, isolation and controls, discrete radioactive particles, survey and sampling methodology for various media (e.g., basement structures, embedded piping, pavement areas and shallow concrete slabs, haul paths), and application of derived concentration guideline levels (e.g., gross activity, embedded piping, basement structures, building surfaces).
On December 8, 2023, at the conclusion of the onsite portion of the audit, the NRC staff briefed the licensee on the priority topics that the licensee should prioritize resolution of in order to facilitate a continued timely review of the CR3 LTP. The NRC staff chose these topics based on two criteria that could significantly delay the staffs ongoing review of the CR3 LTP. First, the NRC staff selected items that may result in a higher level of time or effort for the licensee to resolve. Second, the NRC staff prioritized areas that could have significant cascading effects on other elements of the licensees decommissioning approach.
Following the briefing, the NRC staff and the licensee discussed that the NRC would issue requests for additional information (RAIs) in the near term to address these high priority items.
Accordingly, the NRC staff used the discussions during the audit to inform RAIs focused on the priority items, which were provided to the licensee in a letter dated December 22, 2023 (ML23354A063 and ML23354A064).
4.0 RESULTS OF THE AUDIT
The NRC staff gained insight into the licensees approach to address the identified concerns in each of the major areas described in Section 3.0 of this audit report. Based on the discussions during the audit, the licensee intends to make changes to several sections of the CR3 LTP and submit a revised LTP on the docket in order to address items characterized during the audit.
Many of the licensees planned changes to the CR3 LTP are anticipated to have cascading impacts on other parts of the LTP, which will also be reviewed by the NRC staff upon receipt of the revised LTP.
Due to the nature of the changes being made to the CR3 LTP, the NRC staff conveyed to the licensee that they anticipate the need for subsequent discussions upon receipt of the revised LTP, and that additional information may be needed to support the NRCs review of the LTP.
Subsequent discussions may also take place based on the licensees response to the NRC staffs initial RAIs.
The table provided in the attachment to this audit report provides a comprehensive summary of the topics discussed during the CR3 LTP audit in each of the major areas and outlines the basis for each discussion topic, along with the proposed path to resolution, as applicable.
5.0 AUDIT PARTICIPANTS
Provided below is a list of audit participants from the NRC, ADP CR3, and ADP CR3 consultants:
NRC Staff Louis Caponi Christianne Ridge Kathryn Robertson-DeMers Greg Chapman Randy Fedors
Jack Parrott Timothy Barvitskie Shaun Anderson Chris McKenney
ADP CR3 Bryant Akins Chuck Burtoff Nelson Langub John Jernigan Billy Reid Marshall Blake
ADP CR3 Consultants Tom Silko Claude Wiblin James Stewart Bland Nadia Glucksberg
6.0 DOCUMENTS REVIEWED
The table below provides a list of documents that the NRC staff reviewed during the audit.
Document/File Title Revision/Date CR3 2023 R2 ALARA_ 11-Crystal River Unit 3 Nuclear November 29, 2023 29-2023-REV01_Final Generating Plant Generic Draft.docx ALARA Evaluation
Set of 19 RESRAD-Onsite RESRAD-Onsite Summary: Files generated from models summary files for soil DCGL CR3_DCGL_RAD run between development with file names February 11, 2022, and in the format: February 15, 2022
CR3-DCGL-RADIONUCLIDE-
SUMMARY
.REP
Where RADIONUCLIDE represents each of the 19 radionuclides of concern
Document/File Title Revision/Date Set of 19 RESRAD-Onsite RESRAD-Onsite Probabilistic Files generated from models probabilistic output files for Results Summary: run between soil DCGL development with CR3_DCGL_RAD February 11, 2022, and file names in the format: February 15, 2022
CR3-DCGL-RADIONUCLIDE -
MC
SUMMARY
.REP
Where RADIONUCLIDE represents each of the 19 radionuclides of concern 2021-1209-RESRAD Input Technical Support Document December 9, 2021 Values Memo-DF.pdf 134300, Development of Site-Specific Values for RESRAD Hydrogeological and Hydrological Parameters, ADP CR3 Decommissioning, Crystal River, Florida Six laboratory procedures for Folder: 11. Vendor different sets of radionuclideslaboratory analysis types, techniques, methods, and MDC by media SMG-OFF-BF-00_Survey SMG Off-site Backfill October 4, 2023 Plan_Rev-01_signed.pdf Characterization Worksheet