ML111640059
| ML111640059 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 06/07/2011 |
| From: | NRC/RGN-II/DRP/RPB3 |
| To: | |
| Shared Package | |
| ML111640053 | List: |
| References | |
| Download: ML111640059 (16) | |
Text
Crystal River Nuclear Plant y
Unit 3 A
l A M
i Annual Assessment Meeting 2010 Reactor Oversight Process 2010 Reactor Oversight Process June 7, 2011
Meeting Agenda Meeting Agenda
- Introduction
- Review of Reactor Oversight Process
- National Summary of Plant Performance y
- Discussion of Crystal River Unit 3 Performance
- Questions and Answers
Our Mission T
li d
l t To license and regulate our Nations civilian use of nuclear materials in order to protect public health and safety, promote the common defense and security and defense and security, and protect the environment.
Reactor Oversight Process
- The NRC program to inspect, measure, and assess the safety performance of commercial nuclear p
power plants and to respond to any decline in performance decline in performance.
Reactor Oversight Process Safety Strategic Performance Areas Safety Strategic Performance Areas Safety Cornerstones Baseline Inspection Performance Indicator R
lt Safety Cornerstones Baseline Inspection Performance Indicator R
lt Baseline Inspection Results Significance Significance Results Baseline Inspection Results Significance Significance Results Significance Threshold Action Matrix g
Threshold Significance Threshold Action Matrix g
Threshold Action Matrix Action Matrix Regulatory Response
Significance Threshold Inspection Findings & Performance Indicators p
g Green Green:
Very Low Safety Significance White:
Low to Moderate Safety Significance Y ll Y ll S b t ti l S f t Si ifi Yellow Yellow:
Substantial Safety Significance Red Red:
High Safety Significance
Reactor Oversight Framework Reactor Oversight Framework Protect Public Health and Safety and the Environment Strategic Areas Reactor Safety Radiation Safety Safeguards Initiating Mitigating Barrier Emergency Public Occ pational Ph sical Safety Cornerstones Initiating Events Mitigating Systems Barrier Integrity Emergency Preparedness Public Radiation Occupational Radiation Physical Protection
Action Matrix Action Matrix Licensee Regulatory Degraded Multiple Unacceptable Response Response Cornerstone Degraded Performance Cornerstone Increasing Safety Significance Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions
S f Pl t P f
Summary of Plant Performance Licensee Response 89 Licensee Response 89 Regulatory Response 9
D d d C t
6 Degraded Cornerstone 6
Multiple/Repetitive Deg. Cornerstone 0
Unacceptable 0
Total 104 Total 104
Crystal River Unit 3 Inspection Activities
- Resident Inspector Baseline
- Resident Inspector Baseline
- Regional Baseline Inspections P
f I di t
I ti
- Performance Indicator Inspections
- One Special Inspection - Containment D l i
ti Delamination
- Two Team Inspections
- Problem Identification and Resolution
- Design Modifications
Crystal River Unit 3 Inspection Results esu s
- All Inspection Findings Green
- All Performance Indicators within the nominal, expected Range (Green or N/A)
Annual Assessment Summary
- Operated safely in a manner that preserved public Crystal River Unit 3
- Operated safely in a manner that preserved public health and safety and protected the environment
Public Information Public Information Th NRC l
hi h i
it k
i th
- The NRC places a high priority on keeping the public and stakeholders informed of its activities.
- At www.nrc.gov, you can:
- Find public meeting dates and transcripts; Find public meeting dates and transcripts;
- Read NRC testimony, speeches, press releases, and policy decisions; and A
th NRC Lib t
fi d NRC bli ti d
- Access the NRC Library to find NRC publications and documents.
What Do You Think of the ROP?
a o
ou o
e O
The biennial ROP external survey is coming 3rd Quarter 2011, and we want to hear from you!
O f
Email ROPsurvey@nrc.gov to be notified when the ROP survey is available.
For information on ROP stakeholder feedback, please visit our website at please visit our website at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/program-evaluations.html#section3
End of Presentation End of Presentation Nuclear Regulatory Commission Nuclear Regulatory Commission Region II Cr stal Cit Florida Crystal City, Florida J
7 2011 June 7, 2011
Crystal River Public Meeting Crystal River Public Meeting C
t d Q ti Comments and Questions