Public Meeting Summary - Category 3 - Annual Assessment Meeting - Crystal River Unit 3 Nuclear Plant
ML13134A173
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/13/2013
From: Rich D
NRC/RGN-II/DRP/RPB3
To: Hobbs T
Progress Energy Florida
References
Download: ML13134A173 (21)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 13, 2013 Mr. Terry D. Hobbs Decommissioning Director Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708

SUBJECT:

PUBLIC MEETING

SUMMARY

- CATEGORY 3 - ANNUAL ASSESSMENT MEETING - CRYSTAL RIVER UNIT 3 NUCLEAR PLANT, DOCKET NO. 50-302

Dear Mr. Hobbs:

This refers to the meeting conducted on May 1, 2013, at the Crystal River Nuclear Plant Training Center/Emergency Operations Facility located in Crystal River, Florida. The purpose of the meeting was to discuss the NRC Reactor Oversight Process Annual Assessment of your Crystal River Unit 3 Nuclear Plant. Enclosed is a list of attendees and the Crystal River annual assessment meeting presentation.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact me at (404) 997- 4721.

Sincerely,

/RA/

Daniel W. Rich, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket No.: 50-302 License No.: DPR-72

Enclosures:

1. List of Attendees
2. NRC Presentation

_________________________ X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE MJR:/RA/ DWR:/RA/

NAME MRiches DRich DATE 5/3/2013 5/13/2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO T. Hobbs 2 cc w/encls:

Kelvin Henderson, General Manager Bryan Koon, Director Nuclear Fleet Operations Florida Division of Emergency Management Progress Energy Electronic Mail Distribution Electronic Mail Distribution William A. Passetti, Chief Robert J. Duncan II, Vice President Florida Bureau of Radiation Control Nuclear Operations Department of Health Progress Energy Electronic Mail Distribution Electronic Mail Distribution Daniel R. Westcott, Supervisor Brian C. McCabe Licensing & Regulatory Programs Manager, Nuclear Oversight Crystal River Nuclear Plant (NA1B)

Shearon Harris Nuclear Power Plant Electronic Mail Distribution Progress Energy Electronic Mail Distribution Joseph W. Donahue, Vice President Nuclear Oversight Terry Hobbs, Plant General Manager Progress Energy Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution Electronic Mail Distribution Jack E. Huegel Stephen J. Cahill Manager, Nuclear Oversight Director - Engineering Nuclear Crystal River Nuclear Plant Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution Electronic Mail Distribution David T. Conley, Senior Counsel R. Alexander Glenn, General Counsel Legal Department Progress Energy Progress Energy Electronic Mail Distribution Electronic Mail Distribution Jeffrey R. Swartz Mark Rigsby Director Site Operations Manager, Support Services - Nuclear Crystal River Nuclear Plant Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution Electronic Mail Distribution Donna B. Alexander Attorney General Manager, Nuclear Regulatory Affairs Department of Legal Affairs (interim) The Capitol PL-01 Progress Energy Tallahassee, FL 32399-1050 Electronic Mail Distribution Chairman Thomas Sapporito, Consulting Associate Board of County Commissioners Post Office Box 8413 Citrus County Jupiter, FL 33468 110 N. Apopka Avenue Inverness, FL 36250

T. Hobbs 3 Letter to Terry D. Hobbs from Daniel W. Rich dated May 13, 2013

SUBJECT:

PUBLIC MEETING

SUMMARY

- CATEGORY 3- ANNUAL ASSESSMENT MEETING - CRYSTAL RIVER UNIT 3 NUCLEAR PLANT, DOCKET NO. 50-302 Distribution w/encls:

C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMCrystalRiver Resource

LIST OF ATTENDEES Nuclear Regulatory Commission (NRC)

D. Rich, Chief, Reactor Projects Branch 3 (RPB3), Region II (RII)

T. Morrissey, Senior Resident Inspector, St. Lucie, RII S. Vias, Chief, Engineering Branch 3 (EB3), RII M. Ferdas, Chief, Decommissioning Branch, Division of Nuclear Material Safety Management and Support (NMSS), Region I Bruce Watson, Chief, Reactor Decommissioning Branch, Office of Federal and State Materials and Environmental Management Programs (FSME)

J. Hickman, Reactor Decommissioning Branch, FSME Duke Energy T. Hobbs, Decommissioning Director - Crystal River 3 Nuclear Plant B. Wunderly, Plant Manager - Crystal River 3 Nuclear Plant P. Dixon, Decommissioning Support Manager - Crystal River 3 Nuclear Plant K. Meyers, Emergency Planning - Crystal River 3 Nuclear Plant H. Danenhower M. DeLowery Public Attendance R. Bright B. Bright P. Rowe B. Jordan D.M. Clark J. Keenum D. Kraut J. Thomas A. Cooke A. Sadiq Enclosure 1 2

Enclosure 2

3 Enclosure 2

4 Enclosure 2

5 Enclosure 2

6 Enclosure 2

7 Enclosure 2

8 Enclosure 2

9 Enclosure 2

10 Enclosure 2

11 Enclosure 2

12 Enclosure 2

13 Enclosure 2

14 Enclosure 2

15 Enclosure 2

16 Enclosure 2