Independent Spent Fuel Storage Installation Security Inspection Plan
ML22011A136
Person / Time
Site: Crystal River  Duke Energy icon.png
Issue date: 01/31/2022
From: Daniel Schroeder
Division of Nuclear Materials Safety I
To: Reid B
Progress Energy Florida
References
Download: ML22011A136 (2)


Text

UNIT ED STATES NUCLEA R REGULAT ORY COMMISSION REGION I 2100 R EN AISSANC E BLVD., SU ITE 100 KING OF PRUSSIA, PA 19406-27 13

January 31, 2 022

Mr. Billy Reid Site Vice President ADP CR3, LLC 2760 South Falkenbur g Rd Riverview FL, 33578

SUBJECT:

CRYSTAL RIVER UNIT 3 - INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY INSPECTION PLAN

Dear Mr. Reid:

The enclosed inspection plan lists the security inspection scheduled throu gh December 31, 2023. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well before our inspectors arrive on s it e.

In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRCs Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will c ontact y ou to discuss the change as soon as possible. Please contact me at (610) 337-5 262 with any questions you may have regarding the inspection plan.

Sincerely,

Daniel L. Schroeder, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety and Security

Docket No. 07201035 License No. DPR-72

Enclosure:

Crystal River Unit 3 - Independe nt Spent Fuel Storage Installation Security Inspection Plan

cc w/encl; M. Widener, Manager, Nuclear Security C. Becker, Chief, Bureau of Radiation Control, State of Florida

B. Reid SUBJ ECT: CRYSTAL RIVER UNIT 3 - INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY INSPECTION PLAN DATED J ANUARY 31, 2022

DIST RIBUT ION w/encl:

DLew, RA (R1O RAMAIL RESOURCE)

RLorson, DRA (R1O RAMAIL RESOURCE)

BWelling, DRSS (R1DRSSMAIL RESOURCE)

TBloomer, DRSS (R1DRSSMAIL RESOURCE)

ADimitriadis, DRSS DTifft, SLO DSchroede r, DRSS TE c k, DRSS ALinde, DRSS

FILE: Https://usnrc.sharepoint.com/teams/RIDRSPSBSEC/Shared Documents/Decommissioning/2022 Inspection L ett er s/ Cr y st al Ri v er/ C R S e c ur ity I ns p S c h e d l ett er 2 0 2 2. d oc x ADAMS A CCE SSI O N NUMBER: ML22011A136 SUNSI Review Non-Sensitive Publicly Available Se e Non-P u b l ic ly Available

OFFI CE RI/DRSS RI/DRSS RI/DRSS

NAME TE ck/t e ADimitriadis/ad DSchroeder/dls

DAT E 01/11/2022 01/13/2022 0 1/ 31 /2022

OFFIC IAL R ECORD COPY