Audit Plan Cover Letter - Crystal River Unit 3 Nuclear Generating Plant LTP
ML23310A071
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/07/2023
From: Jack Parrott
Reactor Decommissioning Branch
To: Reid B
ADP CR3
Shared Package
ML23310A063 List:
References
EPID L-2022-LLA-0194
Download: ML23310A071 (3)


Text

Billy Reid, Site Executive ADP CR3, LLC 157060 West Power Line Street Crystal River, FL 34428

SUBJECT:

CRYSTAL RIVER UNIT 3, AUDIT PLAN IN SUPPORT OF ACCELERATED DECOMMISSIONING PARTNERS CRYSTAL RIVER REQUEST TO ADD LICENSE CONDITION TO INCLUDE LICENSE TERMINATION PLAN REQUIREMENTS (EPID L-2022-LLA-0194)

Dear Billy Reid:

By letter dated December 12, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22355A441), as supplemented by letter dated June 9, 2023 (ADAMS Accession No. ML23163A063), Accelerated Decommissioning Partners Crystal River Unit 3, LLC (ADP CR3) (the licensee) requested the U.S. Nuclear Regulatory Commission (NRC) to approve a request to add a condition to include License Termination Plan (LTP) requirements to the NRC license, No. DPR-72, for Crystal River Unit 3 Nuclear Generating Plant (CR3).

The proposed amendment would approve the LTP and add License Condition 2.C.21 that establishes the criteria for determining when changes to the LTP require NRC approval.

The LTP will be implemented by the licensee to complete decommissioning activities at the CR3 site. Once decommissioning is complete, a separate request will be made to the NRC by the licensee to terminate the CR3 license.

The U.S. Nuclear Regulatory Commission staff (NRC) is reviewing the LAR and has determined that a regulatory audit is necessary to complete its review. The corresponding regulatory audit plan is enclosed with this letter.

In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

November 7, 2023 B. Reid 2 If you have any questions, please contact Timothy Barvitskie at (301) 415-6634 or by electronic mail at timothy.barvitskie@nrc.gov, or me at (301)-415-6634 or by electronic mail at jack.parrott@nrc.gov.

Sincerely, Jack D. Parrott, Senior Project Manager Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery and Waste Projects Office of Nuclear Material Safety and Safeguards Docket No. 05000302 License No. DPR-72

Enclosure:

1. Regulatory Audit Plan cc: Crystal River Listserv Signed by Parrott, Jack on 11/07/23

ML23310A063; Ltr ML23310A071

  • via email OFFICE NMSS/DUWP/RDB NMSS/DUWP/RDB* NMSS/DUWP/RDB*

NAME Timothy T SAnderson SA JParrott JP DATE Nov 6, 2023 Nov 7, 2023 Nov 7, 2023