ML23160A296
From kanterella
Jump to navigation
Jump to search
ML23160A296 | |
Person / Time | |
---|---|
Site: | Crystal River |
Issue date: | 06/09/2023 |
From: | Reid B ADP CR3 |
To: | Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation, Document Control Desk |
Shared Package | |
ML23163A063 | List: |
References | |
3F0623-02 | |
Download: ML23160A296 (1) | |
Similar Documents at Crystal River | |
---|---|
Category:Letter
MONTHYEARIR 05000302/20240012024-09-23023 September 2024
[Table view]Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3, NRC Inspection Report No. 05000302/2024001 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24226B2392024-08-27027 August 2024 Application for License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Acknowledgement of Withdrawal ML24179A0702024-07-26026 July 2024 SHPO S106 Completion Crystal River Unit 3 ML24205A2192024-07-24024 July 2024 Tribal S106 Completion Crystal River Unit 3: Muscogee Nation ML24205A2182024-07-24024 July 2024 Tribal S106 Completion Crystal River Unit 3: Seminole Nation of Oklahoma ML24179A0912024-07-24024 July 2024 Tribal S106 Completion Crystal River Unit 3: Seminole Tribe of Florida ML24205A2202024-07-24024 July 2024 Tribal S106 Completion Crystal River Unit 3_Miccosukee Tribe of Florida ML24190A1912024-07-0808 July 2024 Fws Concurrence for Crystal River Unit 3 ML24172A2552024-06-20020 June 2024 Fws to NRC Species List: Florida Ecological Services Field Office 06/20/2024 ML24170A9242024-06-18018 June 2024 024-0023697 Crystal River License Termination Plan Unit 3 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24114A2262024-04-24024 April 2024 Amended Special Package Authorization for the Cr3 Middle Package (Crystal River 3 Middle Package - Docket No. 71-9393) IR 05000302/20230022024-04-17017 April 2024 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report No. 05000302/2023002 ML24054A0612024-04-0202 April 2024 Request to Initiate Section 106 Consultation Regarding the License Termination Plan for Crystal River Unit 3 in Citrus County, Florida ML24079A2492024-04-0202 April 2024 Tribal S106 Initiation Crystal River Unit 3-Johnson, Lewis Johnson ML24054A0582024-04-0202 April 2024 Achp S106 Initiation Crystal River Unit 3 - Letter 1 ML24079A2472024-04-0202 April 2024 Tribal S106 Initiation Crystal River Unit 3-Cypress, Talbert ML24079A2482024-04-0202 April 2024 Tribal S106 Initiation Crystal River Unit 3-Hill, David Hill ML24054A0812024-04-0202 April 2024 Tribal S106 Initiation Crystal River Unit 3-Osceola, Marcellus ML24089A0362024-03-29029 March 2024 Response to Audit Plan in Support of Accelerated Decommissioning Partners and Request to Add License Condition to Include License Termination Plan Requirements. W/Enclosures 1 to 5 ML24073A1922024-03-11011 March 2024 Fws to NRC, List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project ML24054A6452024-02-29029 February 2024 Letter - Reply to Request for RAI Extension Related to the Crystal River License Termination Plan ML24030A7482024-02-12012 February 2024 Audit Report Cover Letter and Report - Crystal River Unit 3 Nuclear Generating Plant LTP ML23342A0942024-01-0909 January 2024 – Independent Spent Fuel Storage Installation Security Inspection Plan ML23354A0632023-12-22022 December 2023 Cover Letter - Crystal River License Termination Plan Request for Additional Information ML23345A1882023-12-0606 December 2023 Fws to NRC Crystal River Species List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project ML23320A2592023-11-17017 November 2023 STC-23 077 Notification of the Crystal River Unit 3 Generating Plant License Termination Plan Public Meeting and Federal Register Notice ML23313A1322023-11-15015 November 2023 Request for Additional Information for the Environmental Assessment of the License Termination Plan for Crystal River Unit 3 Nuclear Generating Plant ML23310A0712023-11-0707 November 2023 Audit Plan Cover Letter - Crystal River Unit 3 Nuclear Generating Plant LTP ML23187A1112023-07-25025 July 2023 Acceptance of Requested Licensing Action License Request to Add License Condition to Include License Termination Plan Requirements ML23107A2722023-06-13013 June 2023 Letter Transmitting NRC Survey Results for East Settling Pond ML23160A2962023-06-0909 June 2023 Response to Crystal River, Unit 3 – Supplemental Information Needed for Acceptance on the Application for a License Amendment Regarding Approval of the License Termination Plan ML23107A2732023-06-0707 June 2023 Orise Independent Survey Report Dcn 5366-SR-01-0 IR 05000302/20220032023-05-25025 May 2023 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report No. 05000302/2022003 ML23103A1902023-04-19019 April 2023 Request for Supplemental Information Cover Letter ML23058A2532023-03-22022 March 2023 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River, Unit 3 - NRC Inspection Report No. 05000302/2022003 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22265A0192022-09-26026 September 2022 Nuclear Generating Plant - U.S. Nuclear Regulatory Commissions Analysis of ADP CR3, LLCs Decommissioning Funding Status Report (License No. DPR-72, Docket Nos. 50-302 and 72-1035) IR 05000302/20220022022-08-0909 August 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report 05000302/2022002 IR 05000302/20220012022-05-0303 May 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report 05000302/2022001 ML22116A1752022-04-27027 April 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3- Independent Spent Fuel Storage Installation Security Inspection Report 07201035/2022401 ML22105A3992022-04-18018 April 2022 Nuclear Generating Plant - Change in NRC Project Manager ML22011A1362022-01-31031 January 2022 Independent Spent Fuel Storage Installation Security Inspection Plan ML22024A2142022-01-24024 January 2022 Nuclear Generating Plant - NMFS NRC Letter - Crystal River Energy Complex Biological Opinion Status (License No. DPR-72, Docket Nos. 50-302 and 72-1035) IR 05000302/20210042022-01-24024 January 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report No. 05000302/2021004 ML21351A0052021-12-20020 December 2021 NRC Analysis of ADP CR3, LLC Decommissioning Funding Status Report for the Crystal River Unit 3 Nuclear Generating Plant (License No. DPR-72, Docket Nos. 50-302 and 72-1035) ML21322A2702021-11-24024 November 2021 Nuclear Generating Plant - Issuance of Amendment No. 260 Approving the Independent Spent Fuel Storage Installation Only Security Plan, Rev 3 IR 05000302/20210032021-11-0909 November 2021 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report Nos. 05000302/2021003 and 07201035/2021001 ML21288A4292021-10-18018 October 2021 Letter - Crystal River Unit 3 Nuclear Generating Plant - Correction to Safety Evaluation Related to the Issuance of Amendment No. 259 Approving the Independent Spent Fuel Storage Installation Only Emergency Plan 2024-09-23 Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50 MONTHYEAR3F0623-02, Maintenance Support Building2023-06-0909 June 2023
[Table view]Maintenance Support Building ML23160A2982023-06-0909 June 2023 Site Characterization Surveys ML23160A2972023-06-0909 June 2023 CR3 Site Characterization Survey Report (CHAR-01) Impacted Open Land Survey Areas ML23160A2962023-06-0909 June 2023 Response to Crystal River, Unit 3 – Supplemental Information Needed for Acceptance on the Application for a License Amendment Regarding Approval of the License Termination Plan 3F1222-01, Nuclear Power Station - License Amendment Request 262 Addition of License Condition 2.C.21, License Termination Plan2022-12-12012 December 2022 Nuclear Power Station - License Amendment Request 262 Addition of License Condition 2.C.21, License Termination Plan 3F0122-01, License Amendment Request to Remove from the Facility Operating License, Appendix B, Environmental Protection Plan (Non-Radiological) Technical Specifications2022-01-26026 January 2022 License Amendment Request to Remove from the Facility Operating License, Appendix B, Environmental Protection Plan (Non-Radiological) Technical Specifications 3F0321-02, License Amendment Request, Rev. 0, ISFSI Security Plan, Rev. a2021-03-17017 March 2021 License Amendment Request, Rev. 0, ISFSI Security Plan, Rev. a 3F1120-02, and Crystal River Nuclear Plant - Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization2020-11-19019 November 2020 and Crystal River Nuclear Plant - Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization 3F0619-01, Application for Order Consenting to Direct Transfer of Control of Licenses and Approving Conforming License Amendment2019-06-14014 June 2019 Application for Order Consenting to Direct Transfer of Control of Licenses and Approving Conforming License Amendment ML19130A1952019-05-0808 May 2019 Letter - FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition 3F0119-02, License Amendment Request 326, Revision 0, ISFSI Only Emergency Plan, Revision 12019-01-16016 January 2019 License Amendment Request #326, Revision 0, ISFSI Only Emergency Plan, Revision 1 3F0717-01, Submittal of Crystal River Unit 3 - License Amendment Request 321, Revision 1, ISFSI Only Physical Security Plan2017-07-0505 July 2017 Submittal of Crystal River Unit 3 - License Amendment Request #321, Revision 1, ISFSI Only Physical Security Plan 3F1216-01, License Amendment Request 324, Revision 0, Cyber Security Plan License Condition Removal2016-12-0909 December 2016 License Amendment Request #324, Revision 0, Cyber Security Plan License Condition Removal 3F0816-01, License Amendment Request 323, Revision 0, Permanently Defueled Technical Specifications for the Independent Spent Fuel Storage Installation to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pools2016-08-31031 August 2016 License Amendment Request #323, Revision 0, Permanently Defueled Technical Specifications for the Independent Spent Fuel Storage Installation to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pools 3F0316-01, License Amendment Request No. 320, Revision 0, Cyber Security Plan Implementation Schedule Milestone 82016-03-31031 March 2016 License Amendment Request No. 320, Revision 0, Cyber Security Plan Implementation Schedule Milestone 8 3F0915-01, Supplement to Application for Order Approving Transfer of License and for Conforming License Amendment Pursuant to 10 CFR 50.80 and 10 CFR 50.902015-09-22022 September 2015 Supplement to Application for Order Approving Transfer of License and for Conforming License Amendment Pursuant to 10 CFR 50.80 and 10 CFR 50.90 3F0815-01, License Amendment Request No. 318, Revision 0, Permanently Defueled Emergency Plan, Revision 2, and Permanently Defueled Emergency Action Level Bases Manual, Revision 1, for the Independent Spent Fuel Storage Installation2015-08-27027 August 2015 License Amendment Request No. 318, Revision 0, Permanently Defueled Emergency Plan, Revision 2, and Permanently Defueled Emergency Action Level Bases Manual, Revision 1, for the Independent Spent Fuel Storage Installation 3F0715-03, Application for Order Approving Transfer of License and for Conforming License Amendment Pursuant to 10 CFR 50.80 and 10 CFR 50.902015-07-28028 July 2015 Application for Order Approving Transfer of License and for Conforming License Amendment Pursuant to 10 CFR 50.80 and 10 CFR 50.90 3F1114-01, Application for Order Approving Transfer of License and for Conforming License Amendment Pursuant to 10 CFR 50.80 and 10 CFR 50.902014-11-0707 November 2014 Application for Order Approving Transfer of License and for Conforming License Amendment Pursuant to 10 CFR 50.80 and 10 CFR 50.90 RA-13-1001, License Amendment Request - Cyber Security Plan Implementation Schedule Milestone 82013-12-19019 December 2013 License Amendment Request - Cyber Security Plan Implementation Schedule Milestone 8 3F0913-04, License Amendment Request 315, Revision 0, Permanently Defueled Emergency Plan and Emergency Action Level Scheme, and Request for Exemption to Certain Radiological Emergency Response Plan Requirements Defined by 10 CFR 502013-09-26026 September 2013 License Amendment Request #315, Revision 0, Permanently Defueled Emergency Plan and Emergency Action Level Scheme, and Request for Exemption to Certain Radiological Emergency Response Plan Requirements Defined by 10 CFR 50 3F0913-02, License Amendment Request 313, Revision 1, Revision to Improved Technical Specifications Administrative Controls for Permanently Defueled Conditions and Response to Requests for Additional Information2013-09-0404 September 2013 License Amendment Request #313, Revision 1, Revision to Improved Technical Specifications Administrative Controls for Permanently Defueled Conditions and Response to Requests for Additional Information 3F0413-01, License Amendment Request 313, Revision 0, Revision to Improved Technical Specifications Administrative Controls for Permanently Defueled Conditions2013-04-25025 April 2013 License Amendment Request #313, Revision 0, Revision to Improved Technical Specifications Administrative Controls for Permanently Defueled Conditions 3F0313-03, Renewal of the Crystal River Units 1, 2 and 3 Industrial Wastewater Permit FL00001592013-03-0606 March 2013 Renewal of the Crystal River Units 1, 2 and 3 Industrial Wastewater Permit FL0000159 RA-12-031, Carolina Power & Light Company and Florida Power Corporation'S License Amendment Request - Cyber Security Plan Implementation Schedule Milestones2012-09-12012 September 2012 Carolina Power & Light Company and Florida Power Corporation'S License Amendment Request - Cyber Security Plan Implementation Schedule Milestones 3F0112-10, License Amendment Request 311, Revision 1, Emergency Feedwater Pump Fuel Oil Volume2012-01-19019 January 2012 License Amendment Request #311, Revision 1, Emergency Feedwater Pump Fuel Oil Volume 3F0611-02, Attachments 1, 2 & 3, 4 & 6 Crystal River Unit 3, License Amendment Request 309, Revision 0 Attachment 1, Description of Proposed Change, Background, Justification for the Request, Determination of No Significant Hazards Considerations2011-06-15015 June 2011 Attachments 1, 2 & 3, 4 & 6 Crystal River Unit 3, License Amendment Request #309, Revision 0 Attachment 1, Description of Proposed Change, Background, Justification for the Request, Determination of No Significant Hazards Considerations RA-11-010, Progress Energy Carolinas, Inc., & Progress Energy Florida, Inc., Submittal of Application for Approval of Indirect Transfers of Control of License Pursuant to 10 CFR 50.80 and 10 CFR ,72.502011-03-30030 March 2011 Progress Energy Carolinas, Inc., & Progress Energy Florida, Inc., Submittal of Application for Approval of Indirect Transfers of Control of License Pursuant to 10 CFR 50.80 and 10 CFR ,72.50 3F0311-04, License Amendment Request 313, Revision 0 Revise Shutdown Margin Definition for Stuck Rod Exception2011-03-24024 March 2011 License Amendment Request #313, Revision 0 Revise Shutdown Margin Definition for Stuck Rod Exception 3F0211-01, License Amendment Request 311, Revision 0, Emergency Feedwater Pump Fuel Oil Volume2011-02-25025 February 2011 License Amendment Request #311, Revision 0, Emergency Feedwater Pump Fuel Oil Volume 3F1210-05, License Amendment Request 310, Revision 0, Departure from a Method of Evaluation for Auxiliary Building Overhead Crane and Revisions to Associated Commitments2010-12-20020 December 2010 License Amendment Request #310, Revision 0, Departure from a Method of Evaluation for Auxiliary Building Overhead Crane and Revisions to Associated Commitments RA-10-011, Request for Approval of the Carolina Power & Light Company and Florida Power Corporation Cyber Security Plan2010-07-0808 July 2010 Request for Approval of the Carolina Power & Light Company and Florida Power Corporation Cyber Security Plan 3F0209-05, License Amendment Request 307, Revision 0, Methodology for Rod Ejection Accident Analysis Under Extended Power Uprate Conditions2009-02-26026 February 2009 License Amendment Request #307, Revision 0, Methodology for Rod Ejection Accident Analysis Under Extended Power Uprate Conditions 3F0209-06, License Amendment Request 310, Revision 0: Application to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-490, Rev. 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Technical Specification2009-02-26026 February 2009 License Amendment Request #310, Revision 0: Application to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-490, Rev. 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Technical Specification 3F1208-06, License Amendment Request 300, Revision 0 Addition of TSTF 479, Revision 0 and TSTF 497, Revision 0 to the Inservice Testing (IST) Program2008-12-17017 December 2008 License Amendment Request #300, Revision 0 Addition of TSTF 479, Revision 0 and TSTF 497, Revision 0 to the Inservice Testing (IST) Program ML0900502532008-12-16016 December 2008 Systems Drawings Supporting License Renewal ML0900800552008-12-16016 December 2008 License Renewal Application. Cover Page to Section 3.2 ML0900800562008-12-16016 December 2008 License Renewal Application. Section 3.3 ML0900807292008-12-16016 December 2008 License Renewal Application. Section 3.5 to End ML0900807312008-11-30030 November 2008 License Renewal Application, Consisting of Applicant'S Environmental Report 3F1108-01, License Amendment Request 304, Revision 0, Emergency Diesel Generator Voltage and Frequency Limits Revision2008-11-0606 November 2008 License Amendment Request #304, Revision 0, Emergency Diesel Generator Voltage and Frequency Limits Revision ML0828301372008-10-0606 October 2008 License Amendment Request to Eliminate Work Hour Controls to Support Compliance with Revised 10 CFR 26 3F0808-01, License Amendment Request 301, Revision 0, Application to Modify Improved Technical Specifications for Replacement Steam Generators2008-08-28028 August 2008 License Amendment Request #301, Revision 0, Application to Modify Improved Technical Specifications for Replacement Steam Generators 3F0708-09, License Amendment Request 299, Revision 1, Supplement 1, Application to Revise Technical Specifications Control Room Envelope Habitability in Accordance with TSTF 448, Revision 3, Using the Consolidated Line Item..2008-07-29029 July 2008 License Amendment Request #299, Revision 1, Supplement 1, Application to Revise Technical Specifications Control Room Envelope Habitability in Accordance with TSTF 448, Revision 3, Using the Consolidated Line Item.. 3F0608-08, License Amendment Request 299, Revision 1: Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using Consolidated Line Item Improvement Process..2008-06-19019 June 2008 License Amendment Request #299, Revision 1: Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using Consolidated Line Item Improvement Process.. 3F0108-14, License Amendment Request 298, Revision 0: Application to Modify Improved Technical Specifications for Replacement Steam Generators2008-01-22022 January 2008 License Amendment Request #298, Revision 0: Application to Modify Improved Technical Specifications for Replacement Steam Generators 3F0108-03, License Amendment Request 302, Revision 0, Surveillance Requirement (SR) 3.7.5.2: Emergency Feedwater System2008-01-17017 January 2008 License Amendment Request #302, Revision 0, Surveillance Requirement (SR) 3.7.5.2: Emergency Feedwater System 3F1007-01, License Amendment Request No. 275, Revision 0, Application for Technical Specification Change TSTF-374, Revision to ITS 5.6.2.14 and Associated Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvement Process2007-10-25025 October 2007 License Amendment Request No. 275, Revision 0, Application for Technical Specification Change TSTF-374, Revision to ITS 5.6.2.14 and Associated Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvement Process 3F0807-05, License Amendment Request (LAR) 296, Revision 1, Supplement 1: Measurement Uncertainty Recapture, Submittal of the Cameron Bounding Uncertainty Analysis Report2007-08-30030 August 2007 License Amendment Request (LAR) #296, Revision 1, Supplement 1: Measurement Uncertainty Recapture, Submittal of the Cameron Bounding Uncertainty Analysis Report 3F0807-03, License Amendment Request 294, Revision 0, Elimination of Spent Fuel Pool Missile Shields, Supplement 12007-08-23023 August 2007 License Amendment Request #294, Revision 0, Elimination of Spent Fuel Pool Missile Shields, Supplement #1 2023-06-09 Category:Report MONTHYEAR3F0324-03, Enclosures 10 - 17: Crystal River, Unit 3, Response to Request for Additional Information2024-03-31031 March 2024
[Table view]Enclosures 10 - 17: Crystal River, Unit 3, Response to Request for Additional Information ML24090A0042024-03-29029 March 2024 Enclosure 6, Part 1: Crystal River, Unit 3 - Appendix E – CHAR-05 Site Characterization of Buildings ML24030A7472024-02-13013 February 2024 Audit Report Attachment - Crystal River Unit 3 Nuclear Generating Plant LTP ML24030A7482024-02-12012 February 2024 Audit Report Cover Letter and Report - Crystal River Unit 3 Nuclear Generating Plant LTP ML23345A1882023-12-0606 December 2023 Fws to NRC Crystal River Species List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project ML24090A0052023-10-10010 October 2023 Enclosure 6, Part 2: Crystal River, Unit 3, DD Survey 23-10-0096 ML23160A2962023-06-0909 June 2023 Response to Crystal River, Unit 3 – Supplemental Information Needed for Acceptance on the Application for a License Amendment Regarding Approval of the License Termination Plan ML23160A2972023-06-0909 June 2023 CR3 Site Characterization Survey Report (CHAR-01) Impacted Open Land Survey Areas 3F0623-02, Maintenance Support Building2023-06-0909 June 2023 Maintenance Support Building ML23160A2982023-06-0909 June 2023 Site Characterization Surveys ML23107A2732023-06-0707 June 2023 Orise Independent Survey Report Dcn 5366-SR-01-0 3F0522-01, Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 20222022-05-17017 May 2022 Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 2022 3F0520-01, Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 20202020-05-18018 May 2020 Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 2020 3F0320-01, NRC Commitment Change Report - March 20202020-03-17017 March 2020 NRC Commitment Change Report - March 2020 ML19343A8252019-12-0606 December 2019 Letter from Erika Bailey, Oak Ridge Institute for Science and Education, to John Hickman, NRC, Forwarding Independent Confirmatory Survey Summary and Results for the 3,854-Acre Area Partial Site Release at the Crystal River Energy Complex ML19022A0762019-01-22022 January 2019 Partial Site Release Request ML19029A0092018-11-0707 November 2018 Reference 16 - Defueled Safety Analysis Report DSAR-R002 ML18303A2942018-06-21021 June 2018 Golder Associates, Inc. - Citrus Combined Cycle Project - CFR 122.21(r) Report 3F0518-03, Safety Analysis Report and 10 CFR 50.59 - 10 CFR 72.48 Report - May 20182018-05-24024 May 2018 Safety Analysis Report and 10 CFR 50.59 - 10 CFR 72.48 Report - May 2018 ML16176A3392016-10-28028 October 2016 Decommissioning Lessons Learned Report and Transmittal Memorandum ML19029A0102016-06-28028 June 2016 Reference 3 - Crystal River, Unit 3, Historical Site Assessment Rev. 00 3F0616-02, Nrg Commitment Change Report - June 20162016-06-14014 June 2016 Nrg Commitment Change Report - June 2016 ML13343A1782013-12-31031 December 2013 Report P23-1680-001, Rev. 0, Site-Specific Decommissioning Cost Estimate for Crystal River Unit 3 Nuclear Generating Plant. 3F0113-08, Attachment D: ANP-3195(NP), Revision 0, Response for Crystal River Unit 3, EPU Licensing Amendment Report NRC Reactor Systems Branch Requests for Additional Information (Non-Proprietary) and Attachment E: Location of Reactor Systems RAI Re2013-01-31031 January 2013 Attachment D: ANP-3195(NP), Revision 0, Response for Crystal River Unit 3, EPU Licensing Amendment Report NRC Reactor Systems Branch Requests for Additional Information (Non-Proprietary) and Attachment E: Location of Reactor Systems RAI Res 3F1112-01, Alion Technical Report ALION-PLN-ENER-8706-02, Rev. 0, Crystal River 3: Bypass Fiber Quantity Test Plan2012-11-0707 November 2012 Alion Technical Report ALION-PLN-ENER-8706-02, Rev. 0, Crystal River 3: Bypass Fiber Quantity Test Plan 3F1112-02, 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 174 of 250 Through Page 250 of 2502012-10-31031 October 2012 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 174 of 250 Through Page 250 of 250 ML12314A3932012-10-31031 October 2012 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 81 of 250 Through Page 173 of 250 ML12314A3922012-10-31031 October 2012 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 1 of 250 Through Page 80 of 250 3F0912-01, ANP-3156 Np, Crystal River 3 EPU Boric Acid Precipitation RAI Responses, Attachment C2012-09-30030 September 2012 ANP-3156 Np, Crystal River 3 EPU Boric Acid Precipitation RAI Responses, Attachment C 3F0712-03, Attachment E to 3F0712-03, Technical Report, ANP-3052, Rev. 2, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip.2012-06-30030 June 2012 Attachment E to 3F0712-03, Technical Report, ANP-3052, Rev. 2, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip. ML12314A3912012-05-31031 May 2012 17877-0002-100, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment 2 ML12205A3582012-05-31031 May 2012 Attachment D to 3F0712-03, Technical Report, ANP-3114(NP), Rev. 0, CR-3 EPU - Feedwater Line Break Analysis Sensitivity Studies. ML12284A1382012-05-25025 May 2012 Report EGS-TR-HC589-01, Seismic Qualification Test Report for Structural Verification Testing of Iccms Cabinet Assembly. 3F0512-01, NRC Commitment Change Report - May 20122012-05-14014 May 2012 NRC Commitment Change Report - May 2012 3F0112-04, Response to Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch Technical Review of the CR-3 Extended Power Uprate LAR2012-01-0505 January 2012 Response to Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch Technical Review of the CR-3 Extended Power Uprate LAR ML12205A3572011-12-15015 December 2011 Attachment a to 3F0712-03, CR-3 LOCA Summary Report - EPU/ROTSG/Mark-B-HTP, Revision 4 3F1211-14, Summary of Changes to Evaluation Models and Peak Cladding Temperature for Large Break Loss of Coolant Analysis and Small Break Loss of Coolant Analysis2011-12-14014 December 2011 Summary of Changes to Evaluation Models and Peak Cladding Temperature for Large Break Loss of Coolant Analysis and Small Break Loss of Coolant Analysis 3F1011-08, ANP-3052, Rev. 0, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip2011-10-25025 October 2011 ANP-3052, Rev. 0, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip ML11237A0682011-08-0505 August 2011 Siemens Technical Report CT-27438, Missile Probability Analysis Report Progress Energy Crystal River 3, Revision 1A ML11207A4442011-06-15015 June 2011 Attachment 7- Crystal River Unit 3 Extended Power Uprate Technical Report 3F0511-02, Response to Request for Additional Information Required for the Development of the Confirmatory LOCA and Non-LOCA Models2011-05-0606 May 2011 Response to Request for Additional Information Required for the Development of the Confirmatory LOCA and Non-LOCA Models ML1101906672010-10-0404 October 2010 Levy, Units 1 and 2, Cola (Sensitive Material), Rev. 2 - Levy County Emergency Plan Part 02 - Draft (Redacted) 3F0910-01, CFR 50.46 Notification of Change in Peak Cladding Temperature for Small Break Loss of Coolant Accident Analysis2010-09-0808 September 2010 CFR 50.46 Notification of Change in Peak Cladding Temperature for Small Break Loss of Coolant Accident Analysis ML1019304172010-05-0606 May 2010 Tritium Database Report ML1010603472010-04-0909 April 2010 5.2.2.4.4. Quality Control and Nondestructive Testing ML1028710882010-03-12012 March 2010 7.6 Vibration Due to Cutting Tendons ML1028711112010-02-25025 February 2010 7.11 Added Stress from Pulling Tendons ML1028711102010-02-23023 February 2010 6.3 Thermal Effects of Greasing ML1028804682010-02-19019 February 2010 7.9 Inadequate Hydro Blasting Nozzles Rate Part 3 ML1028711212010-02-19019 February 2010 7.10 Hydrodemolition Induced Cracking 2024-03-31 Category:Technical MONTHYEAR3F0324-03, Enclosures 10 - 17: Crystal River, Unit 3, Response to Request for Additional Information2024-03-31031 March 2024
[Table view]Enclosures 10 - 17: Crystal River, Unit 3, Response to Request for Additional Information ML24090A0042024-03-29029 March 2024 Enclosure 6, Part 1: Crystal River, Unit 3 - Appendix E – CHAR-05 Site Characterization of Buildings ML24030A7472024-02-13013 February 2024 Audit Report Attachment - Crystal River Unit 3 Nuclear Generating Plant LTP ML24030A7482024-02-12012 February 2024 Audit Report Cover Letter and Report - Crystal River Unit 3 Nuclear Generating Plant LTP ML23345A1882023-12-0606 December 2023 Fws to NRC Crystal River Species List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project ML24090A0052023-10-10010 October 2023 Enclosure 6, Part 2: Crystal River, Unit 3, DD Survey 23-10-0096 3F0623-02, Maintenance Support Building2023-06-0909 June 2023 Maintenance Support Building ML23160A2982023-06-0909 June 2023 Site Characterization Surveys ML23160A2972023-06-0909 June 2023 CR3 Site Characterization Survey Report (CHAR-01) Impacted Open Land Survey Areas ML23160A2962023-06-0909 June 2023 Response to Crystal River, Unit 3 – Supplemental Information Needed for Acceptance on the Application for a License Amendment Regarding Approval of the License Termination Plan ML23107A2732023-06-0707 June 2023 Orise Independent Survey Report Dcn 5366-SR-01-0 3F0522-01, Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 20222022-05-17017 May 2022 Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 2022 3F0520-01, Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 20202020-05-18018 May 2020 Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 2020 3F0320-01, NRC Commitment Change Report - March 20202020-03-17017 March 2020 NRC Commitment Change Report - March 2020 ML19343A8252019-12-0606 December 2019 Letter from Erika Bailey, Oak Ridge Institute for Science and Education, to John Hickman, NRC, Forwarding Independent Confirmatory Survey Summary and Results for the 3,854-Acre Area Partial Site Release at the Crystal River Energy Complex ML19022A0762019-01-22022 January 2019 Partial Site Release Request ML19029A0092018-11-0707 November 2018 Reference 16 - Defueled Safety Analysis Report DSAR-R002 ML18303A2942018-06-21021 June 2018 Golder Associates, Inc. - Citrus Combined Cycle Project - CFR 122.21(r) Report 3F0518-03, Safety Analysis Report and 10 CFR 50.59 - 10 CFR 72.48 Report - May 20182018-05-24024 May 2018 Safety Analysis Report and 10 CFR 50.59 - 10 CFR 72.48 Report - May 2018 ML19029A0102016-06-28028 June 2016 Reference 3 - Crystal River, Unit 3, Historical Site Assessment Rev. 00 ML13343A1782013-12-31031 December 2013 Report P23-1680-001, Rev. 0, Site-Specific Decommissioning Cost Estimate for Crystal River Unit 3 Nuclear Generating Plant. 3F1112-01, Alion Technical Report ALION-PLN-ENER-8706-02, Rev. 0, Crystal River 3: Bypass Fiber Quantity Test Plan2012-11-0707 November 2012 Alion Technical Report ALION-PLN-ENER-8706-02, Rev. 0, Crystal River 3: Bypass Fiber Quantity Test Plan ML12314A3932012-10-31031 October 2012 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 81 of 250 Through Page 173 of 250 ML12314A3922012-10-31031 October 2012 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 1 of 250 Through Page 80 of 250 3F1112-02, 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 174 of 250 Through Page 250 of 2502012-10-31031 October 2012 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 174 of 250 Through Page 250 of 250 3F0912-01, ANP-3156 Np, Crystal River 3 EPU Boric Acid Precipitation RAI Responses, Attachment C2012-09-30030 September 2012 ANP-3156 Np, Crystal River 3 EPU Boric Acid Precipitation RAI Responses, Attachment C 3F0712-03, Attachment E to 3F0712-03, Technical Report, ANP-3052, Rev. 2, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip.2012-06-30030 June 2012 Attachment E to 3F0712-03, Technical Report, ANP-3052, Rev. 2, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip. ML12205A3582012-05-31031 May 2012 Attachment D to 3F0712-03, Technical Report, ANP-3114(NP), Rev. 0, CR-3 EPU - Feedwater Line Break Analysis Sensitivity Studies. ML12314A3912012-05-31031 May 2012 17877-0002-100, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment 2 ML12284A1382012-05-25025 May 2012 Report EGS-TR-HC589-01, Seismic Qualification Test Report for Structural Verification Testing of Iccms Cabinet Assembly. ML12205A3572011-12-15015 December 2011 Attachment a to 3F0712-03, CR-3 LOCA Summary Report - EPU/ROTSG/Mark-B-HTP, Revision 4 3F1011-08, ANP-3052, Rev. 0, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip2011-10-25025 October 2011 ANP-3052, Rev. 0, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip ML11237A0682011-08-0505 August 2011 Siemens Technical Report CT-27438, Missile Probability Analysis Report Progress Energy Crystal River 3, Revision 1A ML11207A4442011-06-15015 June 2011 Attachment 7- Crystal River Unit 3 Extended Power Uprate Technical Report ML1101906672010-10-0404 October 2010 Levy, Units 1 and 2, Cola (Sensitive Material), Rev. 2 - Levy County Emergency Plan Part 02 - Draft (Redacted) ML1010603472010-04-0909 April 2010 5.2.2.4.4. Quality Control and Nondestructive Testing ML1028711122010-02-19019 February 2010 7.9 Inadequate Hydro Blasting Nozzles Rate Part 1 ML1028804682010-02-19019 February 2010 7.9 Inadequate Hydro Blasting Nozzles Rate Part 3 ML1028711212010-02-19019 February 2010 7.10 Hydrodemolition Induced Cracking ML1028711132010-02-19019 February 2010 7.9 Inadequate Hydro Blasting Nozzles Rate Part 2 ML1028711452010-02-18018 February 2010 7.8 Excessive Water Jet Pressure Part 1 ML1028711462010-02-18018 February 2010 7.8 Excessive Water Jet Pressure Part 2 ML1028804582010-02-18018 February 2010 7.8 Excessive Water Jet Pressure Part 3 ML1028711482010-02-0707 February 2010 7.2 Vibration Induced by Hydro Blasting Part 1 ML1028711492010-02-0707 February 2010 7.2 Vibration Induced by Hydro Blasting Part 2 ML1028702832010-02-0303 February 2010 6.6 Original Tensioning T(2) ML1028702912010-02-0202 February 2010 6.5 Inadequate RetensioningT1 ML1028704062010-01-27027 January 2010 Email - from: Dyksterhouse, Don (Don.Dyksterhouse@Pgnmail.Com) to: Lake, Louis Dated Wednesday, January 27, 2010 Design Basis Calculations Attachments: 0102-0135-02 Concrete Strength and Elastic.... Ro Final.Pdf; 0102-0135-03 Ro Final.Pdf; ML1028706922010-01-22022 January 2010 Ctl 059169 Final Report.Pdf ML1028805162010-01-16016 January 2010 Email - from: Miller, Craig L (Craig.Miller@Pgnmail.Com) to: Lake, Louis; Thomas, George; Carrion, Robert; 'Trowe@Wje.Com'; Sealey, Mac Cc: Williams, Charles R. Dated Saturday, January 16, 2010 1:19PM Subject: Failure Mode 2.6 for Review.. 2024-03-31 |
Text