December 03, 2009 LICENSEE:
Florida Power Corporation FACILITY:
Crystal River Unit 3 Nuclear Generating Plant
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON OCTOBER 28, 2009, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FLORIDA POWER CORPORATION, CONCERNING LICENSEE RESPONSE TO A REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Florida Power Corporation (FPC) held a telephone conference call on October 28, 2009, to discuss the applicants response to a request for additional information concerning the Crystal River Unit 3 Nuclear Generating Plant (CR-3) license renewal application. The telephone conference call was useful in clarifying the applicants response to requests for information (RAIs) related to neutron absorption materials in the spent fuel pools at CR-3.
By letter dated October 2, 2009, FPC provided responses to RAIs B.2.37-1 and RAI 3.3.2.2.6-1.
RAI B.2.37-1 requested information related to the Carborundum Monitoring Program and RAI 3.3.2.2.6-1 requested information on how the applicant planned to manage the aging effects of Boral in the spent fuel pool. The staff sought clarification on the use of weight loss to determine the acceptability of the Carborundum spent fuel pool material. The staff also sought clarification on the licensees plan for monitoring both Carborundum and Boral in the spent fuel pool for the period of extended operation including: determining a baseline as a reference point for determining the trend of neutron absorption material loss, the frequency of inspection, and the
Florida Power Corporation type of inspection that will be implemented. The staff may consider issuing additional RAIs related to the applicants plans for managing the aging effects of the spent fuel pool neutron absorbing materials.
The enclosure provides a listing of the participants.
The applicant had an opportunity to comment on this summary.
/RA/
Robert Kuntz, Sr. Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-302
Enclosure:
List of Participants cc w/encl: See next page
ML093290034 OFFICE LA:DLR PM:RPB2:DLR BC:RPB2:DLR PM:RPB2:DLR NAME SFigueroa RKuntz DWrona RKuntz DATE 11/ 25/09 11/30/09 12/1/09 12/3/09
ENCLOSURE TELEPHONE CONFERENCE CALL CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS OCTOBER 28, 2009 PARTICIPANTS AFFILIATIONS Robert Kuntz U.S. Nuclear Regulatory Commission (NRC)
Matthew Yoder NRC Emma Wong NRC Aloysius Obodoako NRC Kent Wood NRC Allen Hiser NRC Mike Heath Florida Power Corporation Bob Reynolds Florida Power Corporation Mike Fletcher Florida Power Corporation Mike Culver Florida Power Corporation
Letter to Florida Power Corporation from R. Kuntz, dated December 03, 2009 DISTRIBUTION:
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON OCTOBER 28, 2009, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND FLORIDA POWER CORPORATION, CONCERNING LICENSEE RESPONSE TO A REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT LICENSE RENEWAL APPLICATION HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRer1 Resource RidsNrrDlrRer2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDciCvib Resource RidsNrrDciCpnb Resource RidsNrrDciCsgb Resource RidsNrrDraAfpb Resource RidsNrrDraApla Resource RidsNrrDeEmcb Resource RidsNrrDeEeeb Resource RidsNrrDssSrxb Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsOgcMailCenter RKuntz EKeegan AJones, OGC LLake, RII MSykes, RII TMorrissey, RII RReyes, RI
Crystal River Nuclear Generating Plant Unit 3 cc:
Mr. R. Alexander Glenn Associate General Counsel (MAC-BT15A)
Florida Power Corporation P.O. Box 14042 St. Petersburg, FL 33733-4042 Mr. James W. Holt Plant General Manager Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708 Mr. William A. Passetti, Chief Department of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin #C21 Tallahassee, FL 32399-1741 Attorney General Department of Legal Affairs The Capitol Tallahassee, FL 32304 Mr. Ruben D. Almaluer, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100 Chairman Board of County Commissioners Citrus County 110 North Apopka Avenue Inverness, FL 34450-4245 Mr. Stephen J. Cahill Engineering Manager Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708 Mr. Daniel R. Westcott Supervisor, Licensing & Regulatory Programs Crystal River Nuclear Plant 15760 W. Power Line Street Crystal River, FL 34428-6708 Mr. Jon A. Franke, Vice President Crystal River Nuclear Plant (NA1B)
ATTN: Supervisor, Licensing & Regulator Programs 15760 W. Power Line Street Crystal River, FL 34428-6708 Senior Resident Inspector Crystal River Unit 3 U.S. Nuclear Regulatory Commission 6745 N. Tallahassee Road Crystal River, FL 34428 Ms. Phyllis Dixon Manager, Nuclear Assessment Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708 Mr. David T. Conley Associate General Counsel II - Legal Dept.
Progress Energy Service Company, LLC Post Office Box 1551 Raleigh, NC 27602-1551 Mr. Daniel L. Roderick Vice President, Nuclear Projects &
Construction Crystal River Nuclear Plant (SA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708 Mr. Mark Rigsby Manager, Support Services - Nuclear Crystal River Nuclear Plant (SA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708 Mr. Robert J. Duncan II Vice President, Nuclear Operations Progress Energy Post Office Box 1551 Raleigh, NC 27602-1551 Mr. Brian C. McCabe Manager, Nuclear Regulatory Affairs Progress Energy Post Office Box 1551 Raleigh, NC 27602-1551