ML111540092
ML111540092 | |
Person / Time | |
---|---|
Site: | Callaway |
Issue date: | 06/03/2011 |
From: | Miller G B NRC/RGN-IV/DRP |
To: | Heflin A C Union Electric Co |
References | |
Download: ML111540092 (18) | |
Similar Documents at Callaway | |
---|---|
Category:Letter
MONTHYEARIR 05000483/20240032024-10-23023 October 2024
[Table view]Integrated Inspection Report 05000483/2024003 IR 05000483/20240132024-10-21021 October 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000483/2024013 IR 05000483/20244012024-10-0909 October 2024 Material Control and Accounting Program Inspection Report 05000483/2024401 Public ULNRC-06901, Concurrent Inoperability of Control Room Air Conditioning System Train and Opposite Train Emergency Diesel Generator Results in Condition Prohibited by Technical Specifications Limiting (Letter)2024-10-0101 October 2024 Concurrent Inoperability of Control Room Air Conditioning System Train and Opposite Train Emergency Diesel Generator Results in Condition Prohibited by Technical Specifications Limiting (Letter) ML24247A3042024-09-11011 September 2024 Regulatory Audit Questions for License Renewal Commitments 34 and 35 (EPID L-2024-LRO-0009) - Non-Proprietary IR 05000483/20244032024-08-28028 August 2024 Security Baseline Inspection 05000483-2024-403 IR 05000483/20240052024-08-14014 August 2024 Updated Inspection Plan for Callaway Plant (Report 05000483/2024005) IR 05000483/20253012024-08-0505 August 2024 Notification of NRC Initial Operator Licensing Examination 05000483/2025301 ML24212A2822024-08-0202 August 2024 Regulatory Audit Summary Concerning Review of Request No. C3R-01 for Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections IR 05000483/20240022024-07-18018 July 2024 And Independent Spent Fuel Storage Installation Integrated Inspection Report 05000483/2024002 and 07201045/2024001 ML24185A1032024-07-16016 July 2024 2024 Biennial Problem Identification and Resolution Inspection Report ULNRC-06892, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC00062024-06-26026 June 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0006 ULNRC-06891, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00052024-06-26026 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0005 ULNRC-06884, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00022024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0002 ULNRC-06886, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00042024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0004 ULNRC-06885, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00032024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0003 ML24144A0492024-06-11011 June 2024 Requests for Relief from ASME OM Code Pump and Valve Testing Requirements for Fifth 120-Month Inservice Testing Interval ML24158A5222024-06-0606 June 2024 Application to Revise Technical Specifications to Adopt Tstf-569, Rev. 2, Revise Response Time Testing Definition (LDCN 24-0008) ML24178A1132024-06-0606 June 2024 Ameren Missouris Intent to Adopt Revision 1 to Amendment 0 of Certificate of Compliance No. 1040 as Applicable to the ISFSI at the Callaway Plant Site ML24143A1632024-05-23023 May 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Storage Canister HGMPC0001 ULNRC-06882, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC00122024-05-16016 May 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0012 ML24137A2342024-05-16016 May 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Canister HGMPC0011 ML24122A1502024-05-0707 May 2024 Audit Plan to Support Review of Steam Generator License Renewal Response to Commitment Nos 34 and 35 ULNRC-06877, Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 252024-05-0606 May 2024 Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 25 IR 05000483/20244022024-05-0606 May 2024 Security Baseline Inspection Report 05000483/2024402 (Full Report) IR 05000483/20240112024-05-0101 May 2024 NRC Post-Approval Site Inspection for License Renewal (Phase 2) Report 05000483/2024011 ULNRC-06856, CFR 50.59 and 10 CFR 72.48 Summary Report2024-05-0101 May 2024 CFR 50.59 and 10 CFR 72.48 Summary Report ULNRC-06869, Submittal of Callaway, Unit 1, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 Submittal of Callaway, Unit 1, 2023 Annual Radiological Environmental Operating Report ML24122A1132024-04-30030 April 2024 Submittal of Callaway, Unit 1, 2023 Annual Radioactive Effluent Release Report ULNRC-06876, Registration of Dry Spent Fuel Storage Canister HGMPC00102024-04-25025 April 2024 Registration of Dry Spent Fuel Storage Canister HGMPC0010 ML24108A1082024-04-17017 April 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0009 ULNRC-06871, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00072024-04-17017 April 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0007 ULNRC-06872, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00082024-04-17017 April 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0008 ULNRC-06866, Submittal of Cycle 26 Commitment Change Summary Report2024-04-17017 April 2024 Submittal of Cycle 26 Commitment Change Summary Report IR 05000483/20240012024-04-16016 April 2024 Integrated Inspection Report 05000483/2024001 IR 05000483/20244042024-04-0909 April 2024 Cyber Security Inspection Report 05000483/2024404 ML24088A3212024-04-0101 April 2024 Notification of Commercial Grade Dedication Inspection (05000483/2024013) and Request for Information ML24086A5132024-03-26026 March 2024 CFR 50.46 Annual Report Regarding ECCS Evaluation Model Revisions ULNRC-06863, Submittal of Annual Exposure Report for 20232024-03-20020 March 2024 Submittal of Annual Exposure Report for 2023 ML24079A1622024-03-19019 March 2024 Re Nuclear Property Insurance Reporting ML24066A1932024-03-0707 March 2024 2024 Callaway Plant Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ULNRC-06852, Owners Activity Reports (OAR-1 Forms) for Cycle/Refuel 262024-03-0505 March 2024 Owners Activity Reports (OAR-1 Forms) for Cycle/Refuel 26 IR 05000483/20230062024-02-28028 February 2024 Annual Assessment Letter for Callaway Plant Report 05000483/2023006 ML24052A3662024-02-26026 February 2024 Regulatory Audit Plan in Support of Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections ULNRC-06858, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-02-21021 February 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation ML24036A1712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0079 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ULNRC-06853, Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.7172024-01-29029 January 2024 Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.717 ML24008A0552024-01-19019 January 2024 Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code (EPID L-2023-LLR- 0061) IR 05000483/20230042024-01-19019 January 2024 – Integrated Inspection Report 05000483/2023004 ML23353A1712024-01-18018 January 2024 Issuance of Amendment No. 237 to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 2024-09-11 Category:Meeting Briefing Package/Handouts MONTHYEARML24157A0642024-06-13013 June 2024
[Table view]Earls 2024 Workshop Presentation ULNRC-06767, Presentation Information for Planned Pre-Application Meeting2022-09-0606 September 2022 Presentation Information for Planned Pre-Application Meeting ULNRC-06753, Presentation Information for Pre-Submittal Meeting Regarding Updated Spent Fuel Criticality Safety Analysis2022-06-23023 June 2022 Presentation Information for Pre-Submittal Meeting Regarding Updated Spent Fuel Criticality Safety Analysis ML22047A0952022-02-15015 February 2022 Presentation Information for Planned Pre-Application Meeting (Closed Meeting), Non-Proprietary (Redacted) Version for Closed Meeting ML22047A0942022-02-15015 February 2022 Presentation Information for Planned Pre-Application Meeting (Public Meeting) ML21271A6132021-09-28028 September 2021 Enclosure 2: Callaway Unit 1 Presentation Information for Planned Pre-Application Meeting (Closed Meeting), Non-Proprietary (Redacted) Version for Closed Meeting ML21271A6122021-09-28028 September 2021 Enclosure 1: Callaway Unit 1 Presentation Information for Planned Pre-Application Meeting (Public Meeting) ML21211A0712021-07-30030 July 2021 Meeting Slides for Pre-submittal Teleconference to Discuss EP Revision LAR ML21123A2622021-05-0303 May 2021 Presentation Information for Planned Pre-Application Meeting (Closed Meeting), Non-Proprietary (Redacted) Version for Closed Meeting ML21123A2602021-05-0303 May 2021 Presentation Information for Planned Pre-Application Meeting (Public Meeting) ML21050A2042021-03-31031 March 2021 March 2021 Meeting Slides ML20248H4672020-09-0404 September 2020 Rict & 50.69 LARs - NRC Pre-Submittal Meeting Slides ML20170A2032020-06-24024 June 2020 6/24/2020 - Pre-Submittal Meeting for Callaway Plant License Amendment Request to Defer Steam Generator Eddy Current Testing ML19247B3842019-09-12012 September 2019 GSI-191 / GL 2004-02 Licensing Amendment Request ML18158A5532018-06-14014 June 2018 Pre-Submittal Meeting for Full Implementation of Alternative Source Term ML16236A0952016-08-25025 August 2016 and Wolf Creek Generating Station - August 25, 2016, Class 1E Electrical Equipment Air Conditioning System Pre-Application Meeting ML16152A1232016-06-0101 June 2016 Strainer Testing for GSI-191 ML14050A4022014-02-20020 February 2014 License Renewal Public Meeting Slides 2 20 2014 ML13042A1882013-02-11011 February 2013 01/31/2013 Summary of the Public Meeting to Discuss the Results of the Grand Gulf Nuclear Station License Renewal Inspection IR 05000483/20120092013-01-25025 January 2013 1/17/2013 - Summary of Public Meeting to Discuss the Results of the Callaway Nuclear Plant License Renewal Inspection (05000483-12-009) ML12320A3052012-11-15015 November 2012 Licensee Slides for November 15, 2012 Public Meeting to Discuss License Amendment to Use Reg Guide 1.6 Revision 1 ML12241A2912012-08-29029 August 2012 UHS Meeting Slides August 29, 2012 ML12241A2922012-08-29029 August 2012 Class 1E AC Meeting Slides August 29, 2012 ML1115400922011-06-0303 June 2011 Summary of Annual Performance Assessment Meeting with Union Electric Company to Discuss the Callaway Plant Performance for the NRC Inspection Period Ending December 31, 2010 ML1115304052011-05-26026 May 2011 Licensee Slide'S from 5/26/11 Pre-Application Meeting ML1008804082010-03-25025 March 2010 Licensee Slides Pre-LAR Submittal Telecon ML0933801482009-11-20020 November 2009 Licensee Handouts from November 20, 2009, Public Meeting with Union Electric Company and Wolf Creek Nuclear Operating Company to Discuss GL 2004-02 Response Rai'S ML0932104872009-11-17017 November 2009 Summary of Regulatory Conference with Ameren Ue Regarding Callaway Plant ML0927302752009-10-15015 October 2009 Summary of Meeting with Union Electric Company to Discuss Proposed Risk-Informed Technical Specification License Amendment for Callaway Plant, Unit 1, and Future Adoption of Initiative 4b ML0916002532009-06-0808 June 2009 Summary of Annual Performance Assessment Meeting with Amerenue for Callaway Plant ML0910502042009-04-14014 April 2009 Summary of Meeting with Amerenue to Discuss Engineering Related Topics Pertaining to Callaway ML0904400462009-01-13013 January 2009 Public Scoping Meeting Presentation Slides ML0815404352008-06-0202 June 2008 Summary of Meeting to Discuss Annual Safety Performance Assessment for Callaway for 2007 ML0802504052008-01-23023 January 2008 Licensee Handout for Meeting with Union Electric Company on the Callaway Plant Relief Request I3R-10 to Use Plastic Pipe in the Safety-Related Essential Service Water (ESW) System ML0729505272007-10-22022 October 2007 Summary of Meeting with Amerenue Callaway Plant to Discuss Various Topics, Including: Essential Service Water; Current Problem Identification & Resolution Crosscutting Issue; Recent Human Performance Improvements ML0721102382007-07-24024 July 2007 Performanc Contracting, Inc.'S Powerpoint Slide, Proposed Wolf Creek/Callaway Test Configuration ML0716000102007-06-0707 June 2007 Summary of Meeting with Union Electric Co Re Callaway Annual Performance Assessment ML0628602302006-10-12012 October 2006 Handout for Meeting with Nuclear Energy Institute (NEI) to Discuss Concerns Related to Operability Determination of Main Steam and Feedwater Isolation Valves with Dual Actuator Trains ML0622804372006-08-16016 August 2006 Handouts from Wolf Creek Nuclear Operating Corporation and from Union Electric Company for Meeting with NRC on the Main Steam Isolation Valve (MSIV) Operability Determination ML0613001302006-05-0909 May 2006 Meeting Summary of 05/04/2006 end-of-cycle Performance Assessment ML0520804072005-07-27027 July 2005 Summary of Meeting with Union Electric Company Concerning Callaway Plant ML0330402882003-10-30030 October 2003 Meeting Handout Materials Regarding STARS-IRAG/NRC Meeting to Discuss Topics Taken from the June 10.11, 2003, Workshop ML0319206482003-06-10010 June 2003 Meeting Handouts for STARS-IRAG/NRC Workshop to Discuss Selected Topics Listed in the Agenda Attached to Meeting Notice ML0310604602003-04-15015 April 2003 Meeting Handout to Discuss Licensee'S Program to Replace the Steam Generators at Callaway ML0231200242002-11-0707 November 2002 Meeting Handouts - Meeting with Strategic Teaming and Resources Sharing - Integrated Regulatory Affairs Group ML0208705662002-04-15015 April 2002 Meetingsummary with Stars and the NRC to Inform the NRC About Current Stars Activities ML0208107562002-03-19019 March 2002 Operator Licensing Workshop Meeting Summary 2024-06-13 Category:Meeting Summary MONTHYEARML23317A0012024-01-12012 January 2024
[Table view]Audit Summary Regarding LAR to Clarify Support System Requirements for the Residual Heat Removal and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML22259A1192022-10-12012 October 2022 Summary of Pre-Application Teleconference with Union Electric Company to Discuss Approval to Insert Framatome Gaia Fuel Assemblies in Its Core Reload Quantities for Callaway Plant, Unit No. 1 ML22181A0012022-07-22022 July 2022 Summary of June 29, 2022, Public Meeting - Union Electric Company, Dba Ameren Missouri to Discuss Upcoming License Amendment Request to Revise Technical Specifications to Reflect Revised Spent Fuel Pool Criticality Safety Analysis ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML22089A2292022-04-0606 April 2022 February 28, 2022, Summary of Partially Closed Pre-Application Teleconference with Union Electric Company Regarding Approval to Insert Framatome Gaia Fuel Assemblies in Their Core in Reload Quantities for Callaway Plant, Unit No. 1 ML21308A0742021-11-17017 November 2021 Summary of Partially Closed Pre-Application Teleconference with Union Electric Company Regarding Approval to Insert Framatomes Gaia Fuel Assemblies in Its Core in Reload Quantities for Callaway Plant, Unit No. 1 ML21243A0042021-09-0707 September 2021 Summary of Teleconference Meeting with Union Electric Company Regarding Proposed License Amendment Request to Revise the Emergency Plan ML21216A2002021-08-11011 August 2021 Summary of Public Webinar with Ameren Missouri to Discuss the Nuclear Regulatory Commission 2020 Annual Assessment of Callaway Plant Docket No. 50-483 ML21168A0022021-07-0101 July 2021 Summary of Partially Closed Pre-Application Teleconference with Union Electric Company Regarding Approval to Insert Framatome'S Gaia Fuel Assemblies in Their Core in Reload Quantities for Callaway Plant, Unit No. 1 ML21103A0032021-04-16016 April 2021 Summary of March 15, 2021, Teleconference Meeting with Union Electric Company Regarding Proposed License Amendment Request to Implement Alternative Source ML20280A5632020-10-21021 October 2020 Summary of Teleconference Meeting with Union Electric Company (Dba Ameren Missouri) for Callaway Plant, Unit 1, on Pre-Application for LARs on TSTF-439, TSTF-505, and Title 10 CFR 50.69 Categorization Program (EPID L-2020-LRM-0072 ML20189A1992020-07-13013 July 2020 Summary of (COVID-19) Presubmittal Public Teleconference W/Union Electric Company Postponement of Steam Generator Eddy Current Testing, by One Refueling Outage, for Callaway Plant, Unit No. 1 ML20189A2832020-07-0707 July 2020 Summary of Region IV Annual Assessment Public Meeting ML19268A9772019-10-16016 October 2019 Summary of 9/12/2019 Meeting with Union Electric Company Related to Closure of Generic Letter 2004-02 for Callaway Plant, Unit 1 ML18215A3752018-08-21021 August 2018 Summary of Pre-Submittal Meeting with Union Electric Company to Discuss an Alternate Source Term License Amendment Request ML16243A5132016-09-0101 September 2016 Summary of August 25, 2016, Public Meeting with Wolf Creek Nuclear Operating Corporation and Amerenue Regarding a Proposed Application for a New Technical Specification for the Class 1E Electrical Equipment Air Conditioning System (MF8118 a ML16165A0042016-06-23023 June 2016 Summary of 6/1/2016 Public Meeting with Union Electric Company to Discuss Generic Safety Issue 191 and Callaway Plant Unit 1's Debris Testing Plan ML14281A3652015-02-23023 February 2015 May 2, 2014, Summary of Conference Call Held Between the U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri), Pertaining to the Callaway Plant, Unit 1, License Renewal Application ML14223A6022014-08-20020 August 2014 Summary of Telephone Conference Call Held on December 18, 2013, Between the U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri) ML14223A5322014-08-20020 August 2014 November 26, 2013, Summary of Telephone Conference Call Held Between Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri) Concerning Requests for Additional Information Pertaining to Callaway, Unit 1, License Renewal A ML14177A5952014-07-0808 July 2014 Summary of Telephone Conference Call Held on February 12, 2014, Between the U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri), Concerning Requests for Additional Information Pertaining to the Callaway Plant, Un ML14175B4992014-07-0808 July 2014 Summary of Telephone Conference Calls Held on October 2 and 3, 2013, Between the U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri), Concerning Requests for Additional Information Pertaining to the Callaway Plan ML14169A6372014-07-0303 July 2014 Summary of Telephone Conference Call Held on April 28, 2014, Between the U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri) Pertaining to the Callaway Plant, Unit 1, LRA ML14169A6042014-07-0303 July 2014 April 30, 2014, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri), Pertaining to the Callaway Plant, Unit 1, License Renewal Application ML14125A1992014-07-0303 July 2014 Summary of Telephone Conference Call Held on April 9, 2014, Between the U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri), Pertaining to the Callaway Plant, Unit 1, License Renewal Application (Tac. No. ME7708) ML14169A4412014-07-0303 July 2014 Summary of Telephone Conference Call Held on April 21, 2014, Between the U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri), Pertaining to the Callaway Plant, Unit 1, License Renewal Application (Tac. No. ME7708 ML14121A5532014-06-18018 June 2014 November 25, 2013, Summary of Telephone Conference Call Held Between NRC and Union Electric Co., (Ameren Missouri), Concerning Requests for Additional Information Pertaining to Callaway, Unit 1, License Renewal Application ML14093B3382014-04-14014 April 2014 01/30/2014, Summary of Telephone Conference Call Held Between NRC and Union Electric Co., (Ameren Missouri), Concerning Requests for Additional Information Pertaining to Callaway, Unit 1, License Renewal Application ML14087A2102014-04-0808 April 2014 Summary of 3/25/14 Verbal Relief Telephone Conference, Relief Request I3R-16, Temporary Non-Code Repair of the Train a Component Cooling Water Heat Exchanger to Control ESW Leakage, Third 10-Year Inservice Inspection Interval ML14070A0782014-04-0707 April 2014 02/27/2014 & 03/04/2014, Summary of Telephone Conference Call Held Between Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri), Pertaining to the Callaway Plant Unit 1, License Renewal Application RAI Set 31 ML14080A5442014-03-31031 March 2014 February 20, 2014, Summary of Meeting Held Between U.S. Nuclear Regulatory Commission Staff and Union Electric Company Representatives to Discuss the Callaway Plant, Unit 1, License Renewal Application ML14035A5752014-03-25025 March 2014 January 28, 2014, Summary of Telephone Conference Call Held Between NRC and Union Electric Company (Ameren Missouri), Pertaining to the Callaway Plant Unit 1, LRA ML13246A3072013-09-0909 September 2013 Memorandum to File - Verbal Authorization of Relief Request PR-07, Testing Frequency for Pumps and Valves, Third 10-year Inservice Testing Interval ML13126A3202013-05-0707 May 2013 Summary of Telephone Conference, Verbal Authorization of Relief Request I3R-14. Proposed Alternative to ASME Code Requirements for Leakage Testing of RPV Head Flange Leakoff Lines, Third 10-Year ISI Interval. ML13067A3162013-04-0101 April 2013 August 23, 2012, Summary of Telephone Conference Call Held Between U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri), Concerning Requests for Additional Information Pertaining to Callaway Plant, Unit 1, License ML13029A0162013-02-12012 February 2013 Summary of Telephone Conference Call Held on January 22, 2013, Between the U.S. Nuclear Regulatory Commission ML13029A6592013-02-12012 February 2013 Summary of Telephone Conference Call Held on December 6, 2012, Between the NRC and Union Electric Company, Concerning Request for Additional Information Pertaining to the Callaway Plant Unit 1, LRA ML13042A1882013-02-11011 February 2013 01/31/2013 Summary of the Public Meeting to Discuss the Results of the Grand Gulf Nuclear Station License Renewal Inspection IR 05000483/20120092013-01-25025 January 2013 1/17/2013 - Summary of Public Meeting to Discuss the Results of the Callaway Nuclear Plant License Renewal Inspection (05000483-12-009) ML12321A1992012-11-29029 November 2012 9/27/12 - Summary of Telephone Conference Call Held Between the NRC and Union Electric Company (Ameren Missouri), Concerning RAIs Pertaining to the Callaway Plant, Unit 1, License Renewal Application ML12321A1882012-11-20020 November 2012 Summary of Preapplication Meeting with Union Electric Company to Discuss Callaway Plant, Unit 1, License Amendment Request to Change Licensing Basis and Analysis of Integrated Head Assembly Consistent with Regulatory Guide 1.61 Revision 1 ML12262A3112012-10-0202 October 2012 Summary of Telephone Conference Call Held on September 14, 2012, Between NRC and Union Electric Company, Concerning the SAMA RAI for the Callaway Plant, Unit 1, LRA ML12243A3922012-09-18018 September 2012 Meeting Summary with Union Electric Company to Discuss Request for New Technical Specification Related to Class 1E Electrical Equipment Air Conditioning System at Callaway Plant, Unit 1 ML12243A3762012-09-18018 September 2012 8/29/2012 Summary of Preapplication Meeting with Union Electric Company to Discuss Request to Revise Technical Specification 3.7.9, Ultimate Heat Sink SR 3.7.9.1 and 3.7.9.2 at Callaway Plant, Unit 1 ML12244A4292012-09-18018 September 2012 Summary of Telephone Conference Call Held on August 29, 2012, Between the U.S. Nuclear Regulatory Commission and Union Electric Company, Concerning the Request for Additional Information Pertaining to the Callaway Plant, Unit 1, License Ren ML1116002282011-06-21021 June 2011 Summary of Meeting with Union Electric Company to Discuss Callaway Plant, Unit 1's Proposed Request to Adopt Risk-informed, Performance-based Alternative Described in National Fire Protection Association Standard (NFPA) 805 ML1115400922011-06-0303 June 2011 Summary of Annual Performance Assessment Meeting with Union Electric Company to Discuss the Callaway Plant Performance for the NRC Inspection Period Ending December 31, 2010 ML1104001662011-02-22022 February 2011 Summary of Meeting with Union Electric Company to Discuss Licensee'S Planned Responses to Staff Requests for Additional Information Callaway Plant'S Request to Revise TS 3.3.2, ESFAS Instrumentation Functions ML1034701472010-12-16016 December 2010 Summary of Meeting with Union Electric Company to Discuss Licensee'S Planned Responses to Staff Requests for Additional Information Related to Callaway Plant'S Request to Revise TS 3.3.2, ESFAS Instrumentation Functions ML1008804162010-03-31031 March 2010 Meeting Summary of Conference Call with Union Electric Company to Discuss Proposed Application for Relocation of Surveillance Frequencies from Callaway Plant Technical Specifications (Risk-Managed TS Initiative 5b) 2024-01-12 Category:Slides and Viewgraphs MONTHYEARML24157A0642024-06-13013 June 2024
[Table view]Earls 2024 Workshop Presentation ULNRC-06767, Presentation Information for Planned Pre-Application Meeting2022-09-0606 September 2022 Presentation Information for Planned Pre-Application Meeting ULNRC-06753, Presentation Information for Pre-Submittal Meeting Regarding Updated Spent Fuel Criticality Safety Analysis2022-06-23023 June 2022 Presentation Information for Pre-Submittal Meeting Regarding Updated Spent Fuel Criticality Safety Analysis ML22047A0942022-02-15015 February 2022 Presentation Information for Planned Pre-Application Meeting (Public Meeting) ML22047A0952022-02-15015 February 2022 Presentation Information for Planned Pre-Application Meeting (Closed Meeting), Non-Proprietary (Redacted) Version for Closed Meeting ML21271A6122021-09-28028 September 2021 Enclosure 1: Callaway Unit 1 Presentation Information for Planned Pre-Application Meeting (Public Meeting) ML21271A6132021-09-28028 September 2021 Enclosure 2: Callaway Unit 1 Presentation Information for Planned Pre-Application Meeting (Closed Meeting), Non-Proprietary (Redacted) Version for Closed Meeting ML21211A6012021-07-30030 July 2021 Annual Assessment Meeting (Public) ML21123A2622021-05-0303 May 2021 Presentation Information for Planned Pre-Application Meeting (Closed Meeting), Non-Proprietary (Redacted) Version for Closed Meeting ML21123A2602021-05-0303 May 2021 Presentation Information for Planned Pre-Application Meeting (Public Meeting) ML20248H4672020-09-0404 September 2020 Rict & 50.69 LARs - NRC Pre-Submittal Meeting Slides ML20170A2032020-06-24024 June 2020 6/24/2020 - Pre-Submittal Meeting for Callaway Plant License Amendment Request to Defer Steam Generator Eddy Current Testing ML19247B3842019-09-12012 September 2019 GSI-191 / GL 2004-02 Licensing Amendment Request ML18158A5532018-06-14014 June 2018 Pre-Submittal Meeting for Full Implementation of Alternative Source Term ML16236A0952016-08-25025 August 2016 and Wolf Creek Generating Station - August 25, 2016, Class 1E Electrical Equipment Air Conditioning System Pre-Application Meeting ML16152A1232016-06-0101 June 2016 Strainer Testing for GSI-191 ML14050A4022014-02-20020 February 2014 License Renewal Public Meeting Slides 2 20 2014 ML13042A1882013-02-11011 February 2013 01/31/2013 Summary of the Public Meeting to Discuss the Results of the Grand Gulf Nuclear Station License Renewal Inspection IR 05000483/20120092013-01-25025 January 2013 1/17/2013 - Summary of Public Meeting to Discuss the Results of the Callaway Nuclear Plant License Renewal Inspection (05000483-12-009) ML12320A3052012-11-15015 November 2012 Licensee Slides for November 15, 2012 Public Meeting to Discuss License Amendment to Use Reg Guide 1.6 Revision 1 ML12241A2912012-08-29029 August 2012 UHS Meeting Slides August 29, 2012 ML12241A2922012-08-29029 August 2012 Class 1E AC Meeting Slides August 29, 2012 ML12096A3942012-03-14014 March 2012 Enclosure 5: Callaway Public Meeting Slides ML1115400922011-06-0303 June 2011 Summary of Annual Performance Assessment Meeting with Union Electric Company to Discuss the Callaway Plant Performance for the NRC Inspection Period Ending December 31, 2010 ML1115304052011-05-26026 May 2011 Licensee Slide'S from 5/26/11 Pre-Application Meeting ML1008804082010-03-25025 March 2010 Licensee Slides Pre-LAR Submittal Telecon ML0933801482009-11-20020 November 2009 Licensee Handouts from November 20, 2009, Public Meeting with Union Electric Company and Wolf Creek Nuclear Operating Company to Discuss GL 2004-02 Response Rai'S ML0932104872009-11-17017 November 2009 Summary of Regulatory Conference with Ameren Ue Regarding Callaway Plant ML0927302752009-10-15015 October 2009 Summary of Meeting with Union Electric Company to Discuss Proposed Risk-Informed Technical Specification License Amendment for Callaway Plant, Unit 1, and Future Adoption of Initiative 4b ML0910502042009-04-14014 April 2009 Summary of Meeting with Amerenue to Discuss Engineering Related Topics Pertaining to Callaway ML0904400462009-01-13013 January 2009 Public Scoping Meeting Presentation Slides ML0815404352008-06-0202 June 2008 Summary of Meeting to Discuss Annual Safety Performance Assessment for Callaway for 2007 ML0802504052008-01-23023 January 2008 Licensee Handout for Meeting with Union Electric Company on the Callaway Plant Relief Request I3R-10 to Use Plastic Pipe in the Safety-Related Essential Service Water (ESW) System ML0729505272007-10-22022 October 2007 Summary of Meeting with Amerenue Callaway Plant to Discuss Various Topics, Including: Essential Service Water; Current Problem Identification & Resolution Crosscutting Issue; Recent Human Performance Improvements ML0721102382007-07-24024 July 2007 Performanc Contracting, Inc.'S Powerpoint Slide, Proposed Wolf Creek/Callaway Test Configuration ML0628602302006-10-12012 October 2006 Handout for Meeting with Nuclear Energy Institute (NEI) to Discuss Concerns Related to Operability Determination of Main Steam and Feedwater Isolation Valves with Dual Actuator Trains ML0622804372006-08-16016 August 2006 Handouts from Wolf Creek Nuclear Operating Corporation and from Union Electric Company for Meeting with NRC on the Main Steam Isolation Valve (MSIV) Operability Determination ML0615106012006-05-23023 May 2006 EPRI HRA Users Group Review of Draft NUREG-1842 ML0611002222006-04-18018 April 2006 Summary of Meeting with Union Electric Company Regarding Callaway Plant, Which Discussed Recent Plant Performance and Various Topics ML0533202252005-12-0101 December 2005 Ri Schedule 05- Mcmurtray; Lessons Learned from Security-Based Table Top Drills ML0520804072005-07-27027 July 2005 Summary of Meeting with Union Electric Company Concerning Callaway Plant ML0430903882004-11-0404 November 2004 Docket No. 50-483 - Licensee'S Slides for Meeting Held on November 4, 2004, to Discuss Its Application on the Steam Generators Replacement in Fall 2005 (Tac No. MC4437) ML0422602762004-08-12012 August 2004 Meeting Summary of the August 8, 2004 Public Workshop - Region IV Operator Licensing Feedback ML0408501912004-03-23023 March 2004 Docket No. 50-483 - Slides from Meeting Held on March 23, 2004, to Discuss Licensee'S License Amendment Request Application Dated December 17, 2003 ML0316806212003-07-17017 July 2003 Licensee'S Handouts, Slides and Viewgraphs, 53 Pages, S107210 ML0316806062003-07-17017 July 2003 NRC Handout, Slides and Viewgraphs, 103 Pages, S107211 ML0211402982002-04-24024 April 2002 Annual Performance Assessment Meeting for Callaway Plant ML0206503632002-03-0606 March 2002 02-27-02 Callaway/Ameren Ue Meeting Summary 2024-06-13 |
Text
June 3, 2011 Mr. Adam C. Heflin, Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251
SUBJECT:
SUMMARY
OF ANNUAL PERFORMANCE ASSESSMENT MEETING WITH UNION ELECTRIC COMPANY
Dear Mr. Heflin:
On April 26, 2011, representatives of Union Electric Company met with NRC personnel at William Woods University to discuss the Callaway Plant performance for the NRC inspection period ending December 31, 2010. The list of attendees and a copy of the NRC's presentatio n are included as Enclosures 1 and
- 2. In addition, Missouri State Representative Jeanette Mott-Oxford (D) was in attendance, and submitted a written statement (ADAMS Accession No.
). In her statement, Representative Mott
-Oxford discusses several issues previously addressed by the NRC. A response to the representative will be provided in separate correspondence.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading
-rm/adams.html (The Public Electronic Reading Room).
Sincerely, /RA/ Geoffrey Miller Chief, Project Branch B Division of Reactor Projects Docket: 5 0-483 License: NPF
-30
Enclosures:
- 1. Attendance List
- 2. NRC Presentation Slides U N I T E D S T A T E S N U C L E A R R E G U L A T O R Y C O M M I S S I O N R E G I O N I V 6 12 EAST LAMAR BLVD
, S U I T E 4 0 0 A R L I N G T O N , T E X A S 7 6 0 1 1-4125 Distribution via ListServe R:\_REACTORS\EOC and Midcycle
\EOC Meeting Summaries
\2011\CWY EOC MS 04-05-11 SUNSI Rev Compl.
Yes No ADAMS Yes No Reviewer Initials NJM Publicly Avail Yes No Sensitive Yes No Sens. Type Initials NJM RIV/PE:DRP/B RIV/PAO C:DRP/B NJMakris VLDricks GBMiller /RA/ /RA/ /RA/ 5/3/11 5/3/11 5/3/11 OFFICIAL RECORD COPY T=Telephone E=E
-mail F=Fax