ML18004A590

From kanterella
Revision as of 20:01, 19 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Package of 29 Postcards Urging NRC to Deny Util Request for Exemption from 10CFR50,App E Requirement Re Full Participation Exercise of Emergency Response Plan Prior to Commercial Operation of Plant
ML18004A590
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/10/1986
From: BULLOCK N A, CAISON W, CAKE E L, CASHWELL P, COURBOIS C, DAVIS L, FULLER F, GREENBERG G, GREENBERG S K, HALFORD M B, HALFORD R C, HOBBS A, JESSUP J, KARDON R M, PALTON K, PETTEE C, TULLER D, WALL L S, WILSON D P, WILSON R, WISSNER J
AFFILIATION NOT ASSIGNED
To: DENTON H R
Office of Nuclear Reactor Regulation
References
NUDOCS 8610170251
Download: ML18004A590 (60)


Text

RECUI+ORY INFORNATION DIBTRIBUTy<N BYBTEN (RIDE>ACCESBIObl NBR: 8610170251 DOC.DATE: 86/10/10 NOTARIZED:

NO DOCKET FACIL: 50-400 Shearon Harris Nuclear Power Planti Unit i.Carolina 05000400 AUTH.NANE AUTHOR AFFILIATION DAVIS>L.AFfiliation Not Assigned MALL>L, B.AFFiliation Not Assigned QREENl3ERQ>

S.K.Affiliation Not Assigned RECIP.NANE RECIPIENT AFFlLIATIGN DENTON)H.R Office of Nuclear Reactor Regulation~

Director (post 851125

SUBJECT:

Package of 29 postcards urging NRC to deny util request for exemption from 10CFR50i App E requirement re full participation exercise of emergency response plan prior to commerc ial operation of p lant.DIBTRIDUTION CODE: YEOBD COP IEB RECEIVED: LTR cDBENCL 0 BI ZE: TITLE: Request For NRR Action (e.g.2.206 Petitions) 8c Related Correspondenc NOTES: Application for permit renewal Filed.05000<00 RECIPIENT ID CODE/NANE PMR-A PD2 LA gUCKLEYp 8 01 COP IEB LTTR ENCL RECIPIENT ID CODE/NAME PWR-A PD2 PD COPIES LTTR ENCL INTERNAL: EDO/ACB E ED R EXTERNAL: LPDR NBIC 03 05 ELD/HDB1 NRR DIR NRC PDR 02 I>>

'.

Dear Mr.'5?Eton:

II I wish to urge denial of CPSL's r'egest for exemption from the requirement, unlit 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.-Sincerely, p,o))w, Qg Q h'~.8610i7025i Ghi010;<<,PDR ADOCK;08000400

,."H.,",.PDA' J A~l>.l l.gP~'

C

Dear Mr.=Denton:

I wish to urge denial of CPSL's r&guest for exemption from the requirement, under$.0 CFR 50 Appendix E, that the Company conduct 6 full participation exercise of the Emergency Response plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before'the plant is permitted to operate at all.Sincerely,~p~

a-~Mrs.Lainbert Daiis'-70I Greenwood Road~>Chapel~Hill;NC~27514~=1*0 PM)9)cT f986 Mr.Harold Denton, Director Office=-of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear" Mr..Denton:

I wish to urge denial of CPEL's request for exemption from the reguirement, under~0 CFR 50, Appendix E, that the~oanpany conduct a~full Participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely,

.1986 Mr.Harold Denton, Director Office-'o'f Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington<

DC 20555

Dear Hr.Denton:

I wish to urge denial of CPS,L's gdguest for exemption from the requirement, urger 10 CFR 50, Appendix E, that the Company conducb"a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.-Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely, R/t/88K C f 8 77Fo<A/coo 8@i.C~pM e]~c."'-:c">Bi a'j~i~, spis, si r)'+=V Mr.:Harold Denton, Director Offi'ceŽof Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555 p%4

Dear Mr.Denton:

I wish to urge denial of CPS,L's request for exemption from the requirement, undJg 10 CFR 50, Appendix E, that the Company conduct-a full participation exercise of the Emergency Response plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power..Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.Sincerel USA.'-I: 14-i Mr.Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Nashington, DC 20555

Dear Mr.Denton:

j p I wish to urge denial of CPS,L's requ'eA for exemption from the requirement, under"10 CPR 50, Appendix E, that the Company.conduct a full participation exercise'f the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely,.

Mr.Harold Denton, Directorg-'ffice of Nuclear Reaction Regulatiop

.Nuclear Regulatory Commission Washington, DC 20555

Dear Mr.,

Denton:

~j.vjyh to urge denial of CPSLP's request for ,exemption from the requirement, under 10 CPR 50,: Appendix E, that the Company conduct a full participation exercise of the Emergency Response plan for its Shearon Harris nuclear pover plant~within one year before beginning commercial operation of the plant or before operating at greater than f've percent of rated pover..Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely,

~I., Mr.Harold Benton, Director ('ffice of Nuclear React'ion Regulatiop Nuclear Regulatory Commission Hashington, DC 20555

Dear Hr.Denton:

I wish to urge denial of CPS,L's request for exemption from the requirement, under l0 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, E believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely, X~~oct I98 USA M~~Harold Denton, Director Of'&ice.of Nuclear Reaction Regulatio Nuclear Regulatory Commission Washington, DC 20555 r4 J'pa g~~*&<1 a

Dear Hr.Denton:

I wish to urge denial of CPS,L's request for exemption from the requirement,--under 10 CFR 50;Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power..Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely, Mr.Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555 4

Dear.Mr.Denton:

wish to urge denial of CPS,L's request for exemption from the requirement, undeg 10 CFR 50, Appendix E, tha t thd company conduc t'full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all..I Sincerely, g~~~~g Q8e PNI/0 OCT'986~mc Paauqpig'~~A'A Mr.Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear.Mr.Denton:

E wish to urge denial of CPS,L's request for exemption from the requirement, undegz)0 CFR 50, Appendix E, that the Company conduct'Q full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at al Sincerely, Cev~~4+J+.Ca~mn 4~<Qqpgpg Qg//~, I 0 ocT z~j'Q Iree-~sr~rg(~end Mr.Harold Denton,.D'irector Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr".Denton:

I wish to urge denial of CPS,L's request for exemption from the requirement, der 10 CFR 50, Appendix E, that the Company conduct~a=full participation exercise of the Emergency Response plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, 1 believe this exercise should be conducted before the plant is peg operate at all.itted to Sincerely, Mr.Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr.Denton:

-I wish to urge denial of CPSL's request for exemption from the requirement, ufi'der" 10 CFR 50, ,Appendix E, that the Company conduct a full participation exercise of the Emergency Response plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.-Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.Since e C.Mr.Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr.Dent;,

on: I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response.Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely, Mr.Harold Denton, Director Office of Nuclear Reaction Regulation Nuclear Regulatory Commission Washington, DC 20555

Dear Hr.Den7on:

I wish to urge denial of CPS,L's request'tz for exemption from the requirement, under)0 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power..Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely, cP.PL-(m t 6-Qy~g'.C ge8 g~<(PM.+K 0)g.95 cO IO OCT 1986~~ir e~w>q-C Mr.Harold Denton,."Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555 4kcaas Dqyr Mr;Denton:~<<<<I<<4 I'ish to urge denial op CPS,L's request for exemption from the requ'irement, under&0 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely, G~ig m<PMg<~0)IO OCT 1986 rises~~Mr.Harold Denton~,~Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555 0, C

Dear Mr."Denton:

-

wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct.a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power..Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely, P~~~)T<PT 7~P/pe'hii , USA Mr.Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr.Denton:

.I wish to urge denial of CPSL's request for exemption from the requirement, un'd6 10 CFR 50, Appendix E, that the Company conduct a full~participation.

exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power..Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely,

~@8 PM CA IO OCT 1986 Mr.Harold Denton, Director Office of Nuclear Reaction Regulatio Nuclear Regulatory Commission Washington, DC 20555

Dear Mr.,

Denton: Z wish to urge denial of CPS,L's request for exemption from the requirement, undead 10 CFR 50, Appendix E, that the Company conduct a full pa articipation exercise-of the Emergency Response plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.-Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

g8~/Ckapa)R.l/I9aS.C4 lips Mr.Harold Denton,'Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Hashington, DC 20555 li~liljlii))filial)l~s)ilI)(Ilail

Dear Hr.Denton.>>I wish to urge denial of CPS,

L's request for exemption fj;6$the requirement, under" 10 CFR 50, Appendix E, tTiat the Company conduct a full participation exercise of the Emergency Response plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to-operate at all.Sincerely, 4c pk rv lac.rl(('r la')cv/946~q~i r g wxaxr~(Mr.Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington<

DC 20555

Dear Mr.Denton:

I wish to urge denial'f CPS,L's request for exemption from the requirement, under l0 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one ye'ar before beginning commercial operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely, C

,c~e~CPM i+~lV 0)IO OCT I9SS Mr.Harold Denton,~Director Office of Nuclear'Reaction Regulatiop

=Nuclear Regulatory Commission Washington, DC 20555

,%ear Mr.Denton: I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all..'--"., a~I~s)=4v ya.g.pk((Q Zoo gH.y cg Phh IG OcT~986'u>pigs<Mr.Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington<

DC 20555

Dear Mr Denton.I wish to urge denial of CPS,

L's reqyqst for exemption from the requirement, unde~5 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergencg Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power..Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely, Mr.Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington<

DC 20555 S J

Dear Mr.Denton:

I wish to urge denial of CPBL's re/gest for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely, 4'y-4~

Mr.Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington<

DC 20555 Denton: I wish to urge denial of CPE,L's request for exemption from the requirement, unddg 10 CFR 50, Appendix E, that the Company conducWa full participation exercise of the Emergency Response plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely, c c~A6~~, lO OCr&gal~lg8g Mr.Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr:

.'enton:

I wish to urge denial of CPS,L's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the OPmpany conduct a full participation exercise of the Emergency Response plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater-than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely, Mr.Harold Denton, Director Office'=of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555 l~C D'ear Mr;Denton: I wish to urge denial of CPS,LL/grequest for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.-Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely, Hr.Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear:

Hr.<<Benton:

I wish to urge denial of CPS,L's request for exemption from the requirement~Zpn'der 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.-Because of the need for changes in the evacua-tion plan, l believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely, Mr.Harold Denton,,-Director Office of Nuclear-Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555

Dear Mr.Denton:

x I wish to urge denial of CPS,L's request for exemption from the re quirkgent, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.r Sincerely, Mr.Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555