Package of Three Citizen Comments Urging Denial of Util Request for Exemption from 10CFR50 App E Requirement for Conduct of Full Participation Exercise of Emergency Response Plan for Plant within 1 Yr Before Operation Above 5% Power
ML18004A584
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/16/1986
From: LEWIS D P, SCHERGER M D, WILSON K
AFFILIATION NOT ASSIGNED
To: DENTON
NRC
References
NUDOCS 8610160005
Download: ML18004A584 (8)


Text

I ACCESSION NOR: FAC IL: 50-400 AUTH.NANE WILSON>K.LEW IS>D.'P SCHERQER N.D;RECIP.NANE DENTON REGULA RY lNFORNATION DISTR IBUTI, BYBTEN (R IDB)8610160005 DOC.DATE: 86/10/16 NOTARIZED:

NO Bheav on Hav v is Nucleav Powev Plant>Unit 1>Cav olina AUTHOR AFFILIATION Affiliation Not Assigned Affiliation Not Assigned Affiliation Not Assigned RECIPIENT AFFILIATION NRC-No Detailed Affiliation Given DOCKET 05000400

SUBJECT:

Package of thv ee citizen comments uv ging denial of util v eguest fov exemption fv om 10CFR50 App E requirement for conduct of full pav'ticipation exercise of emergency v esponse plan fov plant within 1 gr before operqOion above 5/power.DISTRIBUTION CODE: YEOSD COP IES RECEIVED: LTR ENCL BI ZE: TITLE: Request fov NRR Action (e.g.2.206 Petitions) 8c Related Corv espondenc NOTES: Application fov pevmit v enewal filed.05000400 REC IP IENT ID CODE/MANE PWR-A PD2 LA gUCKLEY 9 01 04 INTERNAL: EDO/ACB ELD/RFD Q IL COP IEB LTTR ENCL ,l jl RECIPIENT ID CODE/NANE PWR-A PD2 PD ELD/HDB1 NRR DIR f l COP IEB LTTR ENCL EXTERNAL: LPDR NBIC 03 05 I l NRC PDR 02)i 1 TOT*L NU>IBER CF CCPIEB REQUIRED: LTTR I t ENCL

't qJ t li 1

Dear Mr.Denton:

.+~>~=-skag-A Qa~r~@la.<t 8610160005 Sb1016 PDR ADOCK 05000400 H PDR I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial l operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.)$09 o(i

),GH, y'lg~7 OCT ipse tL".xr.-PA;PP~iF 6i.CDPt'ACF YOUR CO!T~Scaaop)CE Ll Mr.Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555 l>>l)lit>>>>l)l>>l) l))l)1>>)ll)l Mr.Harold Denton, Director Office of Nuclear Reaction Regulation Nuclear Regulatory Commission Washington, DC 20555

Dear Mr.Denton:

'c PM g=r t5)7 lCY Iea6 I wish to urge denial of CPBL's request for exemption from the requirement, under 10 CFR 50,.Appendix E, that the Company-conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, E believe this exercise should be conducted before the plant is permitted to operate at all.I Sincerely,)y5 Mr.Harold Denton, Director Office of Nuclear Reaction Regulation Nuclear Regulatory Commission Washington, DC 20555

Dear Mr.Denton:

I wish to urge denial of CPSL's request for exemption from the requirement, undeY 10 CFR 50, Appendix E, that the Company c~o duct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely, D.