Urges Denial of Util Request for Exemption from 10CFR50, App E Requirement for Full Participation Exercise of Emergency Response Plan within 1 Yr of Commercial Operation or Before Operating at Greater than 5% Rated Power
ML18004B529
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/21/1986
From: BURROWS K
AFFILIATION NOT ASSIGNED
To: DENTON H
Office of Nuclear Reactor Regulation
References
NUDOCS 8610240319
Download: ML18004B529 (4)


Text

REGULA Y INFORMATION DISTRIBUTI

]YSTEN (R IDS)ACCESSION NBR: 8610240319 DOC.DATE: 86/10/21 NOTARIZED:

N FAC IL:: 50-400 Shearon Harris Nuclear Power Plant>Unit 1>Car olina 05000400~~.'O DOCKET 0 AUTH.NAME AUTHOR AFFILIATION BURROWS>K.Affiliation Not Assigned RECIP.NANE, RECIPIENT AFFILIATION DENTON>H.O ffice of Nuclear Reactor Regulation>

Director (post 851125

SUBJECT:

Urges denial of util request For exemption from 10CFR50>App E requirement for full participation exercise of emergency response plan eithin 1 gr of commercial operation or before operating at greater than 5/rated potuer.DISTRIBUTION CODE: YE03D COPIES RECEIVED: LTR ENCL ZE TITL E.Request for NRR Action (e.g.2.206 Petitions) 8r Related Correspondenc NOTES:Application for permit renewal filed 05000400 RECIPIENT ID CODE/NAl'lE PMR-A PD2 LA BUCKLEY B 01 COPIES LTTR ENCL RECIPIENT ID CODE/MANE PNR-A PD2 PD COP IES LTTR ENCL INTERNAL: ELD, ED ILE EXTERNAL: LPDR NSIC 04 03 05 ELD/HDS1 NRR DIR NRC PDR 02 9~WE.TE EVO TOTAL NU<BER OF COPIES REQUIRED: LTTR W ENCL e~r i-'~SR')~'P (dd.'P)I.<<p~'p 4)'f q dI"Wl.II'd<<I<<~Will<<.I/R)4 jj"31)~'Ifj'Ulk l d 4 4)g ,4,~-)If,ll" fill 4 i 4 ,R<<J II<<'<<<<~d tP:4~d'.I RW"<<U d If g,<<$I'f" I>>II" II>>jj>>%<C<<,R>>W.4, ff>>lf'R<<)4)<)4 I'>>Ij lf))d<<)JIB<<4<<idf)<>W I, ll<<R<<$$R d,<<1.)WI>>)I"., I,'", 4"<<t"9')'<I 5'<<f<<Id.0 d,dl'I'R).II))c.)..RR,>.'i I"'V3<>>'I)<<It)il','($>>.~4<<P d J,f'<<If')d<<, P,,,jj ,4 l',]g'Wdy)'pic

~)~I<<W(l',R II>>l'

Dear Mr.Denton:

==..=.-.SSZOaeoSS9 aqq02>H PDR ADQCK 05000400'DR

~I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely, rue~8~o/i Hr.Harold Denton, Director Office of Nuclear Reaction Regulatiop Nuclear Regulatory Commission Washington, DC 20555