ML20196C176

From kanterella
Revision as of 08:01, 13 November 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Advises That 871123 Rev 20 to Safeguard Plan Consistent W/ Provisions of 10CFR50.54(p) & Acceptable
ML20196C176
Person / Time
Site: Cooper Entergy icon.png
Issue date: 02/01/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Trevors G
NEBRASKA PUBLIC POWER DISTRICT
References
NUDOCS 8802160004
Download: ML20196C176 (2)


Text

< '

6 FEB l 1988. ,

In Reply Refer To:

Docket: 50-298 F

Nebraska Public Power District ATTN: George A. Trevors Division Manager - Nuclear Support P.O. Box 499 Columbus, NE 68601 Gentlemen:

This is to acknowledge receipt of your letter dated November 23, 1987, which transmitted changes to the Cooper Nuclear Station Safeguards Plan, Revision 20.

We have reviewed the submitted changes and have determined that they are consistent with the provisions of 10 CFR 50.54(p) and do not decrease the effectiveness of the plan. These changes are, therefore, acceptable.

Sincerely, Odginal Signed By.

L. I. Callan ,

L. J. Callan, Director Division of Reactor Projects cc:

Cooper Nuclear Station ATTN: Guy Horn, Division Manager of Nuclear Operations P.O. Box 98 Brownville, Nebraska 68321 Kansas Radiation Control Program Director Nebraska Radiation Control Program Director bec: (see next page) j i

RIV- S C:RPSB 5 ABEa st/jt C:PM RJEva Ett C:0RP/Cf EJHoller f DJpRP LJCallan LAYand>)4 t 44 /88 g /j B8 )///E$

34

/ /,M /88 l M/88 l

Casework Number 50-298/17-XA I

$$$*IS00k$ g F D 1 1

t I

. a Nebraska Public Power District bec w/o letter dated November 23, 1987:

DMB (RG01) bec distributed by RIV w/ letter from licensee:

R. D. Martin, RA DRP R. L. Bangart, DRSS Branch Chief, RPSB Security Inspector Section Chief, PSS Section Chief DRP/C Resident Inspector P. A. Starcher, RSGB/NRR RITS Coordinator 50.54(p) Book RPSB Security File Physical Security File RPSB RIV File R. E. Hall, DRSS Project Engineer, DRP/C DRS l

l

COOPER NUCLEAR STATION

=-

Nebraska Public Power District __

" " _"_ '&"EOM?A',; U,"",^:'l" "'"

CNSS870571 November 23, 1987 ATTACHMENT CONTAINS SAFEGUARD INFORMATION U.S. Nuclear Regulatory Commission .. ..,

Document Control Desk '"

Washington, DC 20555 j g y [

{i ,

Subj ect: Cooper Nuclear Station Safeguards Plan; QEC ~ 2$(((

Report of Change - Revision Twenty-one Docket No. 50-298/DPR-46 .

Gentlemen: ~~

A revision to the Physical Security Plan (Volume I of the Safeguards Plan) is being submitted to reflect recent changes at Cooper Nuclear Station.

This revision increases the number of armed guards committed to being on duty each shift at Cooper Nuclear Station.

Accordingly, Nebraska Public Power District is submitting, in accordance with the provision of 10 CFP. Part 50.54(p), a Report of Change to the Cooper Nuclear Station Safeguards Plan, Revision Twenty. Upon incorporation of this change, the current Safeguards Plan becomes Revision Twenty-one. We believe the enclosed change does not decrease the safeguards effectiveness of the plan.

The material enclosed herewith contains Safeguards Information as defined by 10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited. Therefore, we request the material, with the exception of the cover letter, be withheld from public disclosure. l Sin erely, revors Division Manager Nuclear Support GAT:GRH:bs

Enclosures:

(1 original and 3 copies of Plan Title Page, Volume I Title Page, and Page 7 and 8 of Volume I) cc: IS.NuclearRegulatoryCommission(2)

Regional Office - Region IV be: NRC Distribution w/o enc.

S M. Peterson w/o enc.

E aguards Plan Holders w/o enc.

.,t 5'//ul04GY Q f 8, -