Category:INSPECTION REPORT
MONTHYEARIR 05000458/19990121999-10-19019 October 1999 Insp Rept 50-458/99-12 on 990822-1002.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000458/19990101999-09-15015 September 1999 Insp Rept 50-458/99-10 on 990830-0903.No Violations Noted. Major Areas Inspected:Licensed Operators Requalification Program IR 05000458/19990081999-09-0808 September 1999 Insp Rept 50-458/99-08 on 990711-0821.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000458/19990111999-08-17017 August 1999 Insp Rept 50-458/99-11 on 990719-23.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000458/19990091999-08-16016 August 1999 Replacement Pages 9-18 for Insp Rept 50-458/99-09 Issued on 990730 ML20210N1901999-08-0404 August 1999 Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee,Operations,Maint,Engineering & Plant Support ML20210K1471999-07-30030 July 1999 Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Noncited Violations Identified.Major Areas Inspected:Review of Licensee Actions Re Testing & Cleaning of Auxiliary Bldg Unit Coolers ML20196L0551999-07-0606 July 1999 Revised Pages 4 of Report Details Section & 2 of Rept Attachment for Insp Rept 50-458/99-03.Corrections Made to Tracking Numbers Assigned to Seven Noncited Violations & to SRO Location During Refueling Activities IR 05000458/19990041999-06-30030 June 1999 Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Portions of Radiation Protection Program,Including Exposure Controls & Radiation Technical & Worker Practices IR 05000458/19990051999-06-18018 June 1999 Insp Rept 50-458/99-05 on 990418-0529.Nonccited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000458/19990031999-05-18018 May 1999 Insp Rept 50-458/99-03 on 990307-0417.Noncited Violations Noted.Major Areas Inspected:Operation,Maintenance, Engineering & Plant Support IR 05000458/19990061999-05-15015 May 1999 Insp Rept 50-458/99-06 on 990419-23.No Violations Noted. Major Areas Inspected:Inservice Exam Program Plan & Schedule,Implementation of Program Plan for Facility & Maint & Engineering Followup Review of Previous Insp Findings ML20205A4601999-03-26026 March 1999 Insp Rept 50-458/98-10 on 990222-26.Violations Noted.Major Areas Inspected:Radiation Work Permit Program Implementation from Oct 1997 to Feb 1999 & Problem Identification & Resolution Program as Applied to Program Deficiencies IR 05000458/19990021999-03-26026 March 1999 Insp Rept 50-458/99-02 on 990124-0306.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19990011999-01-25025 January 1999 Insp Rept 50-458/99-01 on 990104-08.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Alarm Stations,Communications,Access Control of Personnel,Packages,Vehicles & Assessment Aids IR 05000458/19980201999-01-0707 January 1999 Insp Rept 50-458/98-20 on 981101-1212.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980161998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress ML20198N9311998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress IR 05000458/19980181998-11-30030 November 1998 Insp Rept 50-458/98-18 on 980920-1031.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20196G5161998-11-25025 November 1998 Insp Rept 50-458/98-10 Has Been Canceled.No Insp Rept Will Be Issued IR 05000458/19980191998-11-20020 November 1998 Insp Rept 50-458/98-19 on 981019-23.No Violations Noted. Major Areas Inspected:Operations IR 05000458/19980131998-10-27027 October 1998 Insp Rept 50-458/98-13 on 980608-12,22-26 & 0824-28.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maint & Engineering IR 05000458/19980141998-10-21021 October 1998 Insp Rept 50-458/98-14 on 980928-1002.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000458/19980171998-10-0505 October 1998 Insp Rept 50-458/98-17 on 980809-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980151998-08-28028 August 1998 Insp Rept 50-458/98-15 on 980628-0808.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19980121998-07-29029 July 1998 Insp Rept 50-458/98-12 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980071998-06-0808 June 1998 Insp Rept 50-458/98-07 on 980518-21.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring Programs IR 05000458/19980081998-06-0505 June 1998 Insp Rept 50-458/98-08 on 980405-0516.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980111998-06-0404 June 1998 Insp Rept 50-458/98-11 on 980518-21.No Violations Noted. Major Areas Inspected:Maint IR 05000458/19980061998-05-19019 May 1998 Insp Rept 50-458/98-06 on 980427-0501.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radioactive Effluent Waste Mgt Program IR 05000458/19980091998-04-30030 April 1998 Informs That Insp Rept 50-458/98-09 Has Been Canceled ML20217A4801998-04-17017 April 1998 Insp Rept 50-458/98-05 on 980222-0404.Violations Noted. Major Areas Inspected:Operations,Main,Engineering & Plant Support ML20217B4951998-03-24024 March 1998 Insp Rept 50-458/98-03 on 980223-26.Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Activities IR 05000458/19972011998-03-20020 March 1998 Fire Protection Insp Rept 50-458/97-201 on 970615-20, 0629-0703,0819,980120 & 0305.No Violations Noted.Major Areas Inspected:Comprehensive Evaluation of Fire Protection Program & Post Fire Safe Shutdown Capability IR 05000458/19980041998-03-19019 March 1998 Insp Rept 50-458/98-04 on 980111-0221.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203L8831998-03-0404 March 1998 Insp Rept 50-458/98-01 on 980210-13.No Violations Noted. Major Areas Inspected:Licensee Performance & Capabilities During Fullscale,Biennial Exercise of Emergency Plan & Implementation Procedures ML20202B9401998-02-0606 February 1998 Insp Rept 50-458/97-19 on 971130-980110.Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19970201998-02-0505 February 1998 Insp Rept 50-458/97-20 on 971008-15.Violations Noted.Major Areas Inspected:Plant Support IR 05000458/19980021998-02-0202 February 1998 Insp Rept 50-458/98-02 on 980112-16.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Stations,Communication, Access Control of Personnel & Security Event Logs IR 05000458/19970181998-01-0606 January 1998 Insp Rept 50-458/97-18 on 971208-12.No Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000458/19970121997-12-29029 December 1997 Insp Rept 50-458/97-12 on 971203-12.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Following Guidelines in Insp Procedure 71001 ML20197G6191997-12-24024 December 1997 Insp Rept 50-458/97-17 on 971012-1129.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970151997-11-17017 November 1997 Insp Rept 50-458/97-15 on 970922-1017.Violations Noted: Inadequate Procedrual Controls for Bus Restoration Contributed to Loss of Shutdown Cooling for 17 Min & Failure to Maintain Adequate Procedures IR 05000458/19970141997-11-14014 November 1997 Insp Rept 50-458/97-14 on 970831-1011.Violation Noted. Major Areas Inspected:Operation,Maint,Enginerring & Plant Support IR 05000458/19970161997-10-28028 October 1997 Insp Rept 50-458/97-16 on 970929-1003.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000458/19970131997-09-26026 September 1997 Insp Rept 50-458/97-13 on 970720-0830.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970031997-09-10010 September 1997 Insp Rept 50-458/97-03 on 970804-08.Violations Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radwaste & Matls Transportation Programs IR 05000458/19973011997-08-20020 August 1997 Insp Rept 50-458/97-301 on 970728-0801.No Violations Noted. Major Areas Inspected:Operations Examiners Evaluated Competency of Two Senior Reactor Operator & Three Reactor Operator License Applicants for Issuance of Licenses IR 05000458/19970101997-08-0606 August 1997 Insp Rept 50-458/97-10 on 970608-0719.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20149H1441997-07-21021 July 1997 Partially Withheld Insp Rept 50-458/97-11 on 970623-27.Major Areas Inspected:Specific Areas of Physical Security Program Including Review of Records & Repts,Testing & Maint,Vital Area Barriers & Detection Aids & Alarm Stations 1999-09-08
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000458/19990121999-10-19019 October 1999 Insp Rept 50-458/99-12 on 990822-1002.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000458/19990101999-09-15015 September 1999 Insp Rept 50-458/99-10 on 990830-0903.No Violations Noted. Major Areas Inspected:Licensed Operators Requalification Program IR 05000458/19990081999-09-0808 September 1999 Insp Rept 50-458/99-08 on 990711-0821.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000458/19990111999-08-17017 August 1999 Insp Rept 50-458/99-11 on 990719-23.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000458/19990091999-08-16016 August 1999 Replacement Pages 9-18 for Insp Rept 50-458/99-09 Issued on 990730 ML20210N1901999-08-0404 August 1999 Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee,Operations,Maint,Engineering & Plant Support ML20210K1471999-07-30030 July 1999 Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Noncited Violations Identified.Major Areas Inspected:Review of Licensee Actions Re Testing & Cleaning of Auxiliary Bldg Unit Coolers ML20196L0551999-07-0606 July 1999 Revised Pages 4 of Report Details Section & 2 of Rept Attachment for Insp Rept 50-458/99-03.Corrections Made to Tracking Numbers Assigned to Seven Noncited Violations & to SRO Location During Refueling Activities IR 05000458/19990041999-06-30030 June 1999 Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Portions of Radiation Protection Program,Including Exposure Controls & Radiation Technical & Worker Practices IR 05000458/19990051999-06-18018 June 1999 Insp Rept 50-458/99-05 on 990418-0529.Nonccited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000458/19990031999-05-18018 May 1999 Insp Rept 50-458/99-03 on 990307-0417.Noncited Violations Noted.Major Areas Inspected:Operation,Maintenance, Engineering & Plant Support IR 05000458/19990061999-05-15015 May 1999 Insp Rept 50-458/99-06 on 990419-23.No Violations Noted. Major Areas Inspected:Inservice Exam Program Plan & Schedule,Implementation of Program Plan for Facility & Maint & Engineering Followup Review of Previous Insp Findings ML20205A4601999-03-26026 March 1999 Insp Rept 50-458/98-10 on 990222-26.Violations Noted.Major Areas Inspected:Radiation Work Permit Program Implementation from Oct 1997 to Feb 1999 & Problem Identification & Resolution Program as Applied to Program Deficiencies IR 05000458/19990021999-03-26026 March 1999 Insp Rept 50-458/99-02 on 990124-0306.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19990011999-01-25025 January 1999 Insp Rept 50-458/99-01 on 990104-08.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Alarm Stations,Communications,Access Control of Personnel,Packages,Vehicles & Assessment Aids IR 05000458/19980201999-01-0707 January 1999 Insp Rept 50-458/98-20 on 981101-1212.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980161998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress ML20198N9311998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress IR 05000458/19980181998-11-30030 November 1998 Insp Rept 50-458/98-18 on 980920-1031.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20196G5161998-11-25025 November 1998 Insp Rept 50-458/98-10 Has Been Canceled.No Insp Rept Will Be Issued IR 05000458/19980191998-11-20020 November 1998 Insp Rept 50-458/98-19 on 981019-23.No Violations Noted. Major Areas Inspected:Operations IR 05000458/19980131998-10-27027 October 1998 Insp Rept 50-458/98-13 on 980608-12,22-26 & 0824-28.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maint & Engineering IR 05000458/19980141998-10-21021 October 1998 Insp Rept 50-458/98-14 on 980928-1002.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000458/19980171998-10-0505 October 1998 Insp Rept 50-458/98-17 on 980809-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980151998-08-28028 August 1998 Insp Rept 50-458/98-15 on 980628-0808.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19980121998-07-29029 July 1998 Insp Rept 50-458/98-12 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980071998-06-0808 June 1998 Insp Rept 50-458/98-07 on 980518-21.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring Programs IR 05000458/19980081998-06-0505 June 1998 Insp Rept 50-458/98-08 on 980405-0516.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980111998-06-0404 June 1998 Insp Rept 50-458/98-11 on 980518-21.No Violations Noted. Major Areas Inspected:Maint IR 05000458/19980061998-05-19019 May 1998 Insp Rept 50-458/98-06 on 980427-0501.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radioactive Effluent Waste Mgt Program IR 05000458/19980091998-04-30030 April 1998 Informs That Insp Rept 50-458/98-09 Has Been Canceled ML20217A4801998-04-17017 April 1998 Insp Rept 50-458/98-05 on 980222-0404.Violations Noted. Major Areas Inspected:Operations,Main,Engineering & Plant Support ML20217B4951998-03-24024 March 1998 Insp Rept 50-458/98-03 on 980223-26.Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Activities IR 05000458/19972011998-03-20020 March 1998 Fire Protection Insp Rept 50-458/97-201 on 970615-20, 0629-0703,0819,980120 & 0305.No Violations Noted.Major Areas Inspected:Comprehensive Evaluation of Fire Protection Program & Post Fire Safe Shutdown Capability IR 05000458/19980041998-03-19019 March 1998 Insp Rept 50-458/98-04 on 980111-0221.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203L8831998-03-0404 March 1998 Insp Rept 50-458/98-01 on 980210-13.No Violations Noted. Major Areas Inspected:Licensee Performance & Capabilities During Fullscale,Biennial Exercise of Emergency Plan & Implementation Procedures ML20202B9401998-02-0606 February 1998 Insp Rept 50-458/97-19 on 971130-980110.Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19970201998-02-0505 February 1998 Insp Rept 50-458/97-20 on 971008-15.Violations Noted.Major Areas Inspected:Plant Support IR 05000458/19980021998-02-0202 February 1998 Insp Rept 50-458/98-02 on 980112-16.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Stations,Communication, Access Control of Personnel & Security Event Logs IR 05000458/19970181998-01-0606 January 1998 Insp Rept 50-458/97-18 on 971208-12.No Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000458/19970121997-12-29029 December 1997 Insp Rept 50-458/97-12 on 971203-12.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Following Guidelines in Insp Procedure 71001 ML20197G6191997-12-24024 December 1997 Insp Rept 50-458/97-17 on 971012-1129.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970151997-11-17017 November 1997 Insp Rept 50-458/97-15 on 970922-1017.Violations Noted: Inadequate Procedrual Controls for Bus Restoration Contributed to Loss of Shutdown Cooling for 17 Min & Failure to Maintain Adequate Procedures IR 05000458/19970141997-11-14014 November 1997 Insp Rept 50-458/97-14 on 970831-1011.Violation Noted. Major Areas Inspected:Operation,Maint,Enginerring & Plant Support IR 05000458/19970161997-10-28028 October 1997 Insp Rept 50-458/97-16 on 970929-1003.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000458/19970131997-09-26026 September 1997 Insp Rept 50-458/97-13 on 970720-0830.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970031997-09-10010 September 1997 Insp Rept 50-458/97-03 on 970804-08.Violations Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radwaste & Matls Transportation Programs IR 05000458/19973011997-08-20020 August 1997 Insp Rept 50-458/97-301 on 970728-0801.No Violations Noted. Major Areas Inspected:Operations Examiners Evaluated Competency of Two Senior Reactor Operator & Three Reactor Operator License Applicants for Issuance of Licenses IR 05000458/19970101997-08-0606 August 1997 Insp Rept 50-458/97-10 on 970608-0719.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20149H1441997-07-21021 July 1997 Partially Withheld Insp Rept 50-458/97-11 on 970623-27.Major Areas Inspected:Specific Areas of Physical Security Program Including Review of Records & Repts,Testing & Maint,Vital Area Barriers & Detection Aids & Alarm Stations 1999-09-08
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000458/19990121999-10-19019 October 1999 Insp Rept 50-458/99-12 on 990822-1002.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000458/19990101999-09-15015 September 1999 Insp Rept 50-458/99-10 on 990830-0903.No Violations Noted. Major Areas Inspected:Licensed Operators Requalification Program IR 05000458/19990081999-09-0808 September 1999 Insp Rept 50-458/99-08 on 990711-0821.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000458/19990111999-08-17017 August 1999 Insp Rept 50-458/99-11 on 990719-23.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000458/19990091999-08-16016 August 1999 Replacement Pages 9-18 for Insp Rept 50-458/99-09 Issued on 990730 ML20210N1901999-08-0404 August 1999 Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee,Operations,Maint,Engineering & Plant Support ML20210K1471999-07-30030 July 1999 Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Noncited Violations Identified.Major Areas Inspected:Review of Licensee Actions Re Testing & Cleaning of Auxiliary Bldg Unit Coolers ML20196L0551999-07-0606 July 1999 Revised Pages 4 of Report Details Section & 2 of Rept Attachment for Insp Rept 50-458/99-03.Corrections Made to Tracking Numbers Assigned to Seven Noncited Violations & to SRO Location During Refueling Activities IR 05000458/19990041999-06-30030 June 1999 Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Portions of Radiation Protection Program,Including Exposure Controls & Radiation Technical & Worker Practices IR 05000458/19990051999-06-18018 June 1999 Insp Rept 50-458/99-05 on 990418-0529.Nonccited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000458/19990031999-05-18018 May 1999 Insp Rept 50-458/99-03 on 990307-0417.Noncited Violations Noted.Major Areas Inspected:Operation,Maintenance, Engineering & Plant Support IR 05000458/19990061999-05-15015 May 1999 Insp Rept 50-458/99-06 on 990419-23.No Violations Noted. Major Areas Inspected:Inservice Exam Program Plan & Schedule,Implementation of Program Plan for Facility & Maint & Engineering Followup Review of Previous Insp Findings ML20205A4601999-03-26026 March 1999 Insp Rept 50-458/98-10 on 990222-26.Violations Noted.Major Areas Inspected:Radiation Work Permit Program Implementation from Oct 1997 to Feb 1999 & Problem Identification & Resolution Program as Applied to Program Deficiencies IR 05000458/19990021999-03-26026 March 1999 Insp Rept 50-458/99-02 on 990124-0306.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19990011999-01-25025 January 1999 Insp Rept 50-458/99-01 on 990104-08.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Alarm Stations,Communications,Access Control of Personnel,Packages,Vehicles & Assessment Aids IR 05000458/19980201999-01-0707 January 1999 Insp Rept 50-458/98-20 on 981101-1212.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980161998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress ML20198N9311998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress IR 05000458/19980181998-11-30030 November 1998 Insp Rept 50-458/98-18 on 980920-1031.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20196G5161998-11-25025 November 1998 Insp Rept 50-458/98-10 Has Been Canceled.No Insp Rept Will Be Issued IR 05000458/19980191998-11-20020 November 1998 Insp Rept 50-458/98-19 on 981019-23.No Violations Noted. Major Areas Inspected:Operations IR 05000458/19980131998-10-27027 October 1998 Insp Rept 50-458/98-13 on 980608-12,22-26 & 0824-28.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maint & Engineering IR 05000458/19980141998-10-21021 October 1998 Insp Rept 50-458/98-14 on 980928-1002.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000458/19980171998-10-0505 October 1998 Insp Rept 50-458/98-17 on 980809-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980151998-08-28028 August 1998 Insp Rept 50-458/98-15 on 980628-0808.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19980121998-07-29029 July 1998 Insp Rept 50-458/98-12 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980071998-06-0808 June 1998 Insp Rept 50-458/98-07 on 980518-21.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring Programs IR 05000458/19980081998-06-0505 June 1998 Insp Rept 50-458/98-08 on 980405-0516.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980111998-06-0404 June 1998 Insp Rept 50-458/98-11 on 980518-21.No Violations Noted. Major Areas Inspected:Maint IR 05000458/19980061998-05-19019 May 1998 Insp Rept 50-458/98-06 on 980427-0501.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radioactive Effluent Waste Mgt Program IR 05000458/19980091998-04-30030 April 1998 Informs That Insp Rept 50-458/98-09 Has Been Canceled ML20217A4801998-04-17017 April 1998 Insp Rept 50-458/98-05 on 980222-0404.Violations Noted. Major Areas Inspected:Operations,Main,Engineering & Plant Support ML20217B4951998-03-24024 March 1998 Insp Rept 50-458/98-03 on 980223-26.Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Activities IR 05000458/19972011998-03-20020 March 1998 Fire Protection Insp Rept 50-458/97-201 on 970615-20, 0629-0703,0819,980120 & 0305.No Violations Noted.Major Areas Inspected:Comprehensive Evaluation of Fire Protection Program & Post Fire Safe Shutdown Capability IR 05000458/19980041998-03-19019 March 1998 Insp Rept 50-458/98-04 on 980111-0221.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203L8831998-03-0404 March 1998 Insp Rept 50-458/98-01 on 980210-13.No Violations Noted. Major Areas Inspected:Licensee Performance & Capabilities During Fullscale,Biennial Exercise of Emergency Plan & Implementation Procedures ML20202B9401998-02-0606 February 1998 Insp Rept 50-458/97-19 on 971130-980110.Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19970201998-02-0505 February 1998 Insp Rept 50-458/97-20 on 971008-15.Violations Noted.Major Areas Inspected:Plant Support IR 05000458/19980021998-02-0202 February 1998 Insp Rept 50-458/98-02 on 980112-16.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Stations,Communication, Access Control of Personnel & Security Event Logs IR 05000458/19970181998-01-0606 January 1998 Insp Rept 50-458/97-18 on 971208-12.No Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000458/19970121997-12-29029 December 1997 Insp Rept 50-458/97-12 on 971203-12.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Following Guidelines in Insp Procedure 71001 ML20197G6191997-12-24024 December 1997 Insp Rept 50-458/97-17 on 971012-1129.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970151997-11-17017 November 1997 Insp Rept 50-458/97-15 on 970922-1017.Violations Noted: Inadequate Procedrual Controls for Bus Restoration Contributed to Loss of Shutdown Cooling for 17 Min & Failure to Maintain Adequate Procedures IR 05000458/19970141997-11-14014 November 1997 Insp Rept 50-458/97-14 on 970831-1011.Violation Noted. Major Areas Inspected:Operation,Maint,Enginerring & Plant Support IR 05000458/19970161997-10-28028 October 1997 Insp Rept 50-458/97-16 on 970929-1003.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000458/19970131997-09-26026 September 1997 Insp Rept 50-458/97-13 on 970720-0830.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970031997-09-10010 September 1997 Insp Rept 50-458/97-03 on 970804-08.Violations Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radwaste & Matls Transportation Programs IR 05000458/19973011997-08-20020 August 1997 Insp Rept 50-458/97-301 on 970728-0801.No Violations Noted. Major Areas Inspected:Operations Examiners Evaluated Competency of Two Senior Reactor Operator & Three Reactor Operator License Applicants for Issuance of Licenses IR 05000458/19970101997-08-0606 August 1997 Insp Rept 50-458/97-10 on 970608-0719.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20149H1441997-07-21021 July 1997 Partially Withheld Insp Rept 50-458/97-11 on 970623-27.Major Areas Inspected:Specific Areas of Physical Security Program Including Review of Records & Repts,Testing & Maint,Vital Area Barriers & Detection Aids & Alarm Stations 1999-09-08
[Table view] Category:UTILITY
MONTHYEARIR 05000458/19900311990-11-19019 November 1990 Insp Rept 50-458/90-31 on 901105-09.No Violations or Deviations Noted.Major Areas Inspected:Verification of Isolation Component Exemptions IR 05000458/19900251990-11-0707 November 1990 Insp Rept 50-458/90-25 on 900924-28 & 1015-19.Noncited Violation Identified.Major Areas Inspected:Quality Verification Function Including Condition Rept Program, Internal Audit Program IR 05000458/19900281990-10-17017 October 1990 Insp Rept 50-458/90-28 on 901009-12.No Violations or Deviations Noted.Major Areas Inspected:Installation & Testing of Mods & Installation of Heat Shrinkable Insulation Tubing ML20058A5461990-10-17017 October 1990 Insp Rept 50-458/90-23 on 900910-14.No Violations or Deviations Noted.Major Areas Inspected:Engineering Evaluation in Response to NRC Bulletin 88-004,action of Previously Identified Items & Review of Root Cause Analysis IR 05000458/19900221990-09-27027 September 1990 Insp Rept 50-458/90-22 on 900827-31.No Violations or Deviations Noted.Major Areas Inspected:Licensee Liquid & Gaseous Radwaste Mgt Program ML20059D6471990-08-28028 August 1990 Insp Rept 50-458/90-15 on 900611-15.No Violations or Deviations Noted.Major Areas Inspected:Operational Status of Emergency Preparedness Program,Including Followup to Previous Insp Findings & Equipment IR 05000458/19900201990-08-21021 August 1990 Insp Rept 50-458/90-20 on 900723-26.No Violations or Deviations Noted.Major Areas Inspected:Training & Qualification Effectiveness IR 05000458/19902001990-07-26026 July 1990 Electrical Distribution Sys Functional Insp Rept 50-458/90-200 on 900521-0622.No Violations Noted.Major Areas Inspected:Design & Implementation of Plant Electrical Distribution Sys & Adequacy of Engineering Support IR 05000458/19900171990-07-19019 July 1990 Advises That Insp 50-458/90-17 Canceled,Therefore,No Insp Rept Will Be Issued IR 05000458/19900141990-06-19019 June 1990 Insp Rept 50-458/90-14 on 900521-22.One self-identified Violation Noted.Major Areas Inspected:Licensee Occupational Radiation Protection Program Including High Radiation Area Controls IR 05000458/19890331989-09-21021 September 1989 Insp Rept 50-458/89-33 on 890801-31.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Surveillance Test Observation,Ler Followup & Followup on 10CFR21 Repts IR 05000458/19890311989-08-29029 August 1989 Insp Rept 50-458/89-31 on 890701-31.Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint & Surveillance Test Observation,Esf Walkdown & Emergency Preparedness Drill IR 05000458/19890301989-08-17017 August 1989 Insp Rept 50-458/89-30 on 890619-23.Violations Noted.Major Areas Inspected:Physical Security Program IR 05000458/19890191989-08-10010 August 1989 Advises That Insp 50-458/89-19 Cancelled & No Insp Rept Will Be Issued for Rept Number IR 05000458/19890321989-07-31031 July 1989 Insp Rept 50-458/89-32 on 890717-21.No Violations or Deviations Noted.Major Areas Inspected:Surveillance Testing Program & Plant Instrumentation Calibr Program.Lists of Surveillance Test Performance & Loop Calibr Repts Encl IR 05000458/19890281989-07-27027 July 1989 Insp Rept 50-458/89-28 on 890601-30.Violations Noted.Major Areas Inspected:Plant Events,Operational Safety Verification,Maint & Surveillance Test Observation & Licensee Action on Previous Insp Findings IR 05000458/19890251989-07-27027 July 1989 Insp Rept 50-458/89-25 on 890710-14.No Violations or Deviations Noted.Major Areas Inspected:Startup Testing. Conservative Error in Util Procedure for Manual Calculations of Core Thermal Power Identified IR 05000458/19890291989-07-14014 July 1989 Insp Rept 50-458/89-29 on 890619-23.No Violations or Deviations Noted.Major Areas Inspected:Corrective Actions IR 05000458/19890271989-07-12012 July 1989 Insp Rept 50-458/89-27 on 890605-09 & 19-23.Violations Noted.Major Areas Inspected:Self Assessment Capabilities IR 05000458/19890241989-06-26026 June 1989 Insp Rept 50-458/89-24 on 890501-31.Violations Noted.Major Areas Inspected:Plant Events,Operational Safety Verification & Maint & Surveillance Test Observation IR 05000458/19890221989-06-20020 June 1989 Insp Rept 50-458/89-22 on 890525-27.No Violations or Deviations Noted.Major Areas Inspected:Containment Integrated Leak Rate Test & Review of Results of Local Leak Rate Test IR 05000458/19890261989-06-14014 June 1989 Insp Rept 50-458/89-26 on 890515-19.No Violations Noted. Major Areas Inspected:Action on Previously Indentified Insp Findings,Inservice Insp Data Review & Corrective Actions IR 05000458/19890011989-06-0707 June 1989 Insp Rept 50-458/89-01 on 890501-05.No Violations Noted. Major Areas Inspected:Facility Mods & Nonlicensed Staff Training ML20244C3561989-06-0505 June 1989 Insp Rept 50-458/89-18 on 890501-05 & 15-19.Violations Noted.Major Areas Inspected:Inservice Testing Program for Pumps & Valves,Welding Activities Associated W/Repairs to Svc Water Sys & Activities Re Instrument Air Sys Insp IR 05000458/19890231989-05-25025 May 1989 Insp Repts 50-458/89-23 on 890501-05.No Violations or Deviations Noted.Major Areas Inspected:Programs for Station Design Changes & Mods for Installation of Raychem Electrical Splices IR 05000458/19890111989-05-24024 May 1989 Insp Rept 50-458/89-11 on 890315-0430.Violations Noted.Major Areas Inspected:Plant Events,Operational Safety Verification,Maint & Surveillance Test Observation,Refueling Activities & Licensee Action on Previous Findings IR 05000458/19890171989-05-16016 May 1989 Insp Rept 50-458/89-17 on 890409-19.Violations Noted.Major Areas Inspected:Radiation Protection Program,Including Planning & Preparation for in-reactor Pressure Vessel Repair of Feed Water Spargers IR 05000458/19890131989-05-15015 May 1989 Advises That Insp Rept 50-458/89-13 Cancelled.No Rept Will Be Issued for Rept Number ML20244D4511989-05-15015 May 1989 Partially Withheld Insp Rept 50-458/89-15 on 890402-06 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Physical Security Program,Including Mgt Support,Security Program Plans & Audits & Protected & Vital Area Access IR 05000458/19890211989-05-10010 May 1989 Insp Rept 50-458/89-21 on 890424-28.No Violations or Deviations Noted.Major Areas Inspected:Surveillance Test Observation & Followup on Operating Events IR 05000458/19890101989-05-0909 May 1989 Insp Rept 50-458/89-10 on 890327-0406.No Violations or Deviations Noted.Major Areas Inspected:Review of Inservice Insp,Welding & Associated Documents & Procedures.Mod to RHR Sys Also Reviewed IR 05000458/19890141989-04-20020 April 1989 Insp Rept 50-458/89-14 on 890403-07.No Violations or Deviations Noted.Major Areas Inspected:Testing of Pipe Supports & Restraint Sys ML20244B6001989-04-0606 April 1989 Insp Rept 50-458/89-12 on 890327-31.Violation Noted.Major Areas Inspected:Welding Activities.Welding Program Well Defined & Includes Monitoring by Qc.Weakness in Welder Qualification Program Noted IR 05000458/19890071989-04-0505 April 1989 Insp Rept 50-458/89-07 on 890201-0314.No Violations or Deviations Noted.Major Areas Inspected:Plant Events, Emergency Preparedness Exercise,Operational Safety Verification & Surveillance Test Observation IR 05000458/19890091989-03-30030 March 1989 Insp Rept 50-458/89-09 on 890301-03.No Violations or Deviations Noted.Major Areas Inspected:Licensee Performance & Capabilities During Annual Exercise of Emergency Plan & Procedures IR 05000458/19890081989-03-10010 March 1989 Insp Rept 50-458/89-08 on 890213-17.No Violations or Deviations Noted.Major Areas Inspected:Calibr Program, Emergency Diesel Fuel Oil Program Into QA Program & Receipt, Storage & Handling of Diesel Generator Fuel Oil IR 05000458/19890061989-03-0808 March 1989 Insp Rept 50-458/89-06 on 890206-10.No Violations or Deviations Noted.Major Areas Inspected:Inservice Testing Program for Pumps & Valves IR 05000458/19890051989-02-24024 February 1989 Insp Rept 50-458/89-05 on 890101-31.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Radiological Protection,Security,Surveillance Test Observation & Maint Observation IR 05000458/19890031989-02-23023 February 1989 Informs That Insp 50-458/89-03 Cancelled.No Insp Rept Will Be Issued for Subj Rept Number IR 05000458/19880291989-01-31031 January 1989 Partially Withheld Insp Rept 50-458/88-29 on 881212-16 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program Included Mgt Support, Security Program Plans,Audits & Records & Repts IR 05000458/19880191988-10-14014 October 1988 Insp Rept 50-458/88-19 on 880801-0917.Violation Noted.Major Areas Inspected:Surveillance & Maint Observation,Safety Sys Walkdown,Operational Safety Verification,Radiological Protection Observation & Security ML20155G8291988-10-0303 October 1988 Insp Rept 50-458/88-21 on 880912-15.No Violations or Deviations Noted.Major Areas Inspected:Emergency Preparedness Program ML20155E2471988-09-27027 September 1988 Insp Rept 50-458/88-22 on 880829-0915.Violations Noted.Major Areas Inspected:Fuel Bldg Ventilation Charcoal Filtration Sys IR 05000458/19880201988-09-14014 September 1988 Insp Rept 50-458/88-20 on 880822-25.No Violations Noted. Details Withheld (Ref 10CFR73.21) ML20153E4051988-08-30030 August 1988 Insp Rept 50-458/88-18 on 880808-12.Violations Noted.Major Areas Inspected:Surveillance Procedures & Records IR 05000458/19880181988-08-30030 August 1988 Insp Rept 50-458/88-18 on 880808-12.Violations Noted.Major Areas Inspected:Surveillance Procedures & Records ML20151Z8021988-08-22022 August 1988 Partially Withheld Insp Rept 50-458/88-14 on 880613-17 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected:Lers, Allegations,Security Procedures,Mgt Effectivenss,Security Program Audits & Records & Repts IR 05000458/19880171988-08-12012 August 1988 Insp Rept 50-458/88-17 on 880701-31.No Violations or Deviations Noted.Major Areas Inspected:Licensee Action on NRC Bulletin 88-005,surveillance Test & Maint Observation, Operational Safety Verification & Security IR 05000458/19880161988-07-27027 July 1988 Insp Rept 50-458/88-16 on 880620-24.No Violations or Deviations Noted.Major Areas Inspected:Liquid & Gaseous Effluent Release Program & Allegations Re Training & Qualifications of Supervisory Personnel ML20151G0971988-07-15015 July 1988 Insp Rept 50-458/88-13 on 880501-0630.Violation Noted.Major Areas Inspected:Previous Insp Findings,Nrc Bulletins 88-001 & 88-007,NRC Info Notices,Surveillance Test Observation, Maint Observation & Safety Sys Walkdown 1990-09-27
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000458/19990121999-10-19019 October 1999 Insp Rept 50-458/99-12 on 990822-1002.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support ML20212L9771999-10-0505 October 1999 Notice of Violation from Insp on 990710.Violation Noted:From 990224-0325,River Bend Station Operated in Mode I Without Three Operable EDGs IR 05000458/19990101999-09-15015 September 1999 Insp Rept 50-458/99-10 on 990830-0903.No Violations Noted. Major Areas Inspected:Licensed Operators Requalification Program IR 05000458/19990081999-09-0808 September 1999 Insp Rept 50-458/99-08 on 990711-0821.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000458/19990111999-08-17017 August 1999 Insp Rept 50-458/99-11 on 990719-23.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000458/19990091999-08-16016 August 1999 Replacement Pages 9-18 for Insp Rept 50-458/99-09 Issued on 990730 ML20210N1901999-08-0404 August 1999 Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee,Operations,Maint,Engineering & Plant Support ML20210K1471999-07-30030 July 1999 Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Noncited Violations Identified.Major Areas Inspected:Review of Licensee Actions Re Testing & Cleaning of Auxiliary Bldg Unit Coolers ML20196L0551999-07-0606 July 1999 Revised Pages 4 of Report Details Section & 2 of Rept Attachment for Insp Rept 50-458/99-03.Corrections Made to Tracking Numbers Assigned to Seven Noncited Violations & to SRO Location During Refueling Activities IR 05000458/19990041999-06-30030 June 1999 Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Portions of Radiation Protection Program,Including Exposure Controls & Radiation Technical & Worker Practices IR 05000458/19990051999-06-18018 June 1999 Insp Rept 50-458/99-05 on 990418-0529.Nonccited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000458/19990031999-05-18018 May 1999 Insp Rept 50-458/99-03 on 990307-0417.Noncited Violations Noted.Major Areas Inspected:Operation,Maintenance, Engineering & Plant Support IR 05000458/19990061999-05-15015 May 1999 Insp Rept 50-458/99-06 on 990419-23.No Violations Noted. Major Areas Inspected:Inservice Exam Program Plan & Schedule,Implementation of Program Plan for Facility & Maint & Engineering Followup Review of Previous Insp Findings ML20205A4601999-03-26026 March 1999 Insp Rept 50-458/98-10 on 990222-26.Violations Noted.Major Areas Inspected:Radiation Work Permit Program Implementation from Oct 1997 to Feb 1999 & Problem Identification & Resolution Program as Applied to Program Deficiencies IR 05000458/19990021999-03-26026 March 1999 Insp Rept 50-458/99-02 on 990124-0306.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support ML20205A4131999-03-23023 March 1999 NRC Operator Licensing Exam Rept 50-458/99-301 (Including Completed & Graded Tests) for Tests Administered on 990222- 0303.All 14 Applicants Passed Exams ML20203A5351999-01-27027 January 1999 EN-99-005:on 990201,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Two Severity Level III Violations Involving Design Deficiency,Caused Uncertainty as to Ability of Div I & II IR 05000458/19990011999-01-25025 January 1999 Insp Rept 50-458/99-01 on 990104-08.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Alarm Stations,Communications,Access Control of Personnel,Packages,Vehicles & Assessment Aids IR 05000458/19980201999-01-0707 January 1999 Insp Rept 50-458/98-20 on 981101-1212.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199E2111999-01-0707 January 1999 Notice of Violation from Insp on 981101-1212.Violation Noted:On 971022,radiation Protection Technicians Released One Container with Two Items Contaminated Above Limits Specified in Procedure RSP-0213 ML20199A2161999-01-0505 January 1999 Notice of Violation from Investigation Conducted on 971231. Violation Noted:On 971015,A Wells,Employee on Entergy Operations,Inc,Submitted to NRC Info Known to Be Inaccurate in Some Respect Matl to NRC ML20198T0691999-01-0505 January 1999 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:Info Was Provided to Senior Resident Inspector That Was Not Complete & Accurate in All Matl Respects Re 971010 of RWP 97-0002 ML20203A6601999-01-0505 January 1999 EN-99-001:on 990105,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Severity Level III Violation Involving Superintendent of Radiation Control at Licensee River Bend Station Facility ML20198N9311998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress IR 05000458/19980161998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress ML20198N9151998-12-29029 December 1998 Notice of Violation from Insp on 980720-0807.Violation Noted:On 980724,licensee Made Change to Facility as Described in Safety Analysis Rept,Which Created Unreviewed Safety Question,Without Prior Commission Approval IR 05000458/19980991998-12-22022 December 1998 SALP Rept 50-458/98-99 Canceled.Process Suspended for Two Yrs.No Insp Rept Will Be Issued for Number IR 05000458/19980181998-11-30030 November 1998 Insp Rept 50-458/98-18 on 980920-1031.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20196G5161998-11-25025 November 1998 Insp Rept 50-458/98-10 Has Been Canceled.No Insp Rept Will Be Issued IR 05000458/19980191998-11-20020 November 1998 Insp Rept 50-458/98-19 on 981019-23.No Violations Noted. Major Areas Inspected:Operations IR 05000458/19980131998-10-27027 October 1998 Insp Rept 50-458/98-13 on 980608-12,22-26 & 0824-28.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maint & Engineering IR 05000458/19980141998-10-21021 October 1998 Insp Rept 50-458/98-14 on 980928-1002.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000458/19980171998-10-0505 October 1998 Insp Rept 50-458/98-17 on 980809-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980151998-08-28028 August 1998 Insp Rept 50-458/98-15 on 980628-0808.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20154L7021998-08-17017 August 1998 Corrected Notice of Violation from Insp Completed on 980218. Corrected NOV Sent to Make Consistent with Ltr Sent on 980722 & to Make Clear That No Response Required ML20236V2081998-07-29029 July 1998 Notice of Violation from Insp on 980517-0627.Violation Noted:On 980601,while Accomplishing Clearance Order 98-0583, Operator Did Not Follow Sequence Shown on Clearance Order While Positioning Components IR 05000458/19980121998-07-29029 July 1998 Insp Rept 50-458/98-12 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20154M5531998-07-22022 July 1998 Notice of Violation from Investigation Completed on 980323. Violation Noted:On 970908,WJ Ginn,Employee of Contractor to Entergy Operations,Inc,Deliberately Submitted Info to Licensee That Was Incomplete & Inaccurate ML20154L7351998-07-22022 July 1998 Notice of Violation from Investigation Completed on 980218. Violation Noted:On 970711,DL Brown Employee of Contractor to Util Deliberatly Submitted Info to Licensee That Brown Knew Incomplete & Inaccurate on Security Questionnaire IR 05000458/19980071998-06-0808 June 1998 Insp Rept 50-458/98-07 on 980518-21.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring Programs IR 05000458/19980081998-06-0505 June 1998 Insp Rept 50-458/98-08 on 980405-0516.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980111998-06-0404 June 1998 Insp Rept 50-458/98-11 on 980518-21.No Violations Noted. Major Areas Inspected:Maint IR 05000458/19980061998-05-19019 May 1998 Insp Rept 50-458/98-06 on 980427-0501.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radioactive Effluent Waste Mgt Program IR 05000458/19980091998-04-30030 April 1998 Informs That Insp Rept 50-458/98-09 Has Been Canceled ML20217A4461998-04-17017 April 1998 Notice of Violation from Insp on 980222-0404.Violation Noted:Established Measures Did Not Assure That Deviation from Environ Design Criteria Was Controlled ML20217A4801998-04-17017 April 1998 Insp Rept 50-458/98-05 on 980222-0404.Violations Noted. Major Areas Inspected:Operations,Main,Engineering & Plant Support PNO-IV-98-016, on 980413,operators at River Bend Station Initiated Normal Reactor Shutdown.Plant Shutdown Deemed Necessary After Operators Identified Main Generator Hydrogen Seal Oil Leak at Main Generator Casing1998-04-14014 April 1998 PNO-IV-98-016:on 980413,operators at River Bend Station Initiated Normal Reactor Shutdown.Plant Shutdown Deemed Necessary After Operators Identified Main Generator Hydrogen Seal Oil Leak at Main Generator Casing ML20217B4701998-03-24024 March 1998 Notice of Violation from Insp on 980223-26.Violation Noted: Licensee Not Maintained Records of Reviews of Radiation Protection Program Content & Implementation ML20217B4951998-03-24024 March 1998 Insp Rept 50-458/98-03 on 980223-26.Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Activities IR 05000458/19972011998-03-20020 March 1998 Fire Protection Insp Rept 50-458/97-201 on 970615-20, 0629-0703,0819,980120 & 0305.No Violations Noted.Major Areas Inspected:Comprehensive Evaluation of Fire Protection Program & Post Fire Safe Shutdown Capability 1999-09-08
[Table view] |
Text
. ,
~<. .
'
,
,
'
i
/
APPENDIX B
'
U. S. NUCLEAR REGULATORY COMMISSION
REGION IV
NRC Inspection Report: 50-458/88-08 Docket: 50-458 Licensee: Gulf States Utilities Company (CSU)
P. O. Box 220 St. Francisville, Louisiana 70775 Facility Name: River Bend Station (RBS)
Inspection At: River Bend Station, St. Francisville, Louisiana Inspection Conducted: February 16 through March 31, 1988 Inspectors: ,' 88
~
D. D.VChamberlain, Senior Resident Inspector Date Project Section C, Division of Reactor Projects
_M o k 3. b W. B. Jones, ResidenthInspector 4hirr Datb '
Project Section C, bivision of Reactor Projects Approved:
E. J.' Holler, Chief, Project Section C Dite '
Division of Reactor Projects 8805060132 880502 PDR ADOCK 05000459 Q DCD
_ _ _ . -
. ____ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
. .
, ,
. .
,
-2-Inspection deport
~ Inspection Conducted February 16 through March 31, 1988 (Report 50-458/88-08)
Areas Inspected: Routine, uncnnounced inspection of licensee action on previous inspection findings, status of facility operating license conditions, NRC Bulletin 80-70, 10 CFR Part 21 Reports, surveillance test observation, maintenance observation and operational safety verificatio Results: Within the areas inspected, one violation was identified (inadequate alarm response procedure, paragraph 8).
?
, .
' '
. .
DETAILS Persons Contacted
- L. Andrews, Director, Nuclear Training W. J. Beck, Supervisor, Reactor Engineering J. E. Booker, Manager, Oversight
- E. M. Cargill, Supervisor, Radiation Programs
- J. W. Cook, Lead Environmental Analyst, Nuclear Licensing
- T. C. Crouse, Manager, Quality Assurance
- J. C. Deddens, Senior Vice President, River Bend Nuclear Group
- D. R. Derbonne, Assistant Plant Manager, Maintenance
- L. A. England, Director, Nuclear Licensing R. W. Frayer, Director, Projects P. E. Freehill, Outage Manager A. O. Fredieu, Supervisor, Operations P. D. Graham, Assistant Plant Manager, Operations J. R. Hamilton, Director, Design Engineering
- G. K. Henry, Director, Quality Assurance Operations B. E. Hey, Nuclear Engineer, Design Engineering
- G. R. Kimmell, Director, Quality Services R. J. King, Supervisor, Nuclear Licensing A. D. Kowale;uk, Director, Oversight-J. W. Leavines, Director, Field Engineering I. M. Malik, Supervisor, Quality Systems J. H. McQuirter, Licensing Engineer
- T. G. Murphy, Supervisor, Planning and Scheduling
- V. J. Normand, Supervisor, Administrative Services W. H. Odell, Manager, Administration
- T. F. Plunkett, Plant Manager C. A. Rohrmann, Training Systems Coordinator
- M. F. Sankovich, Manager, Engineering
- J. P. Shippert, Operations Engineer
- K. E. Suhrke, Manager, Project Management R. J. Vachon, Senior Compliance Analyst
- J. Venable, Assistant Operations Supervisor
- T. L. Weir, Director R. G. West, Supervisor, General Maintenance NRC i
- E. J. Holler, Chief, Project Section C, Division of Reactor Projects
- D. D. Chamberlain, Senior Resident Inspector
_____ _- . - ___
-
.,. .
. .
"
!
,
The NRC inspectors also interviewed additional licensee personnel during !
the inspection perio , t
- Denotes those persons that attended the exit interview conducted on
,
'
April 6, 198 l
~
' Licensee Action on Previous Inspection Findings (Closed) Violation (450/8729-01): Failure to follow procedure for -
control of locked valve This violation resulted when'a nuclear equipment operator unlocked [
and closed a normally locked open valve using the emergency key t without notifying the control room staf The operator was !
'
transferring the control rod drive (CRD) pump suction path from the s
'
condensate storaga tank to the condenser, utilizing the station operating procedure, when he misunderstood the directiens provided and closed the condensate storage tank suction line. The Assistant Plant Manager-Operations issued a memorandum reiterating the licensee's policy for adherence to all procedures and to ensure that !
all individuals involved in an evolution understand the task to be performe Station Operating Procedure (50P) SOP-0002, "Control Rod :
,
Drive Hydraulics," was revised to add a caution statement for the transfer of the CRD pump suction path. The remaining SOPS were also !
reviewed to detertaine if additional instructions or cautions were ;
needed for other plant evolutions. Finally, licensee management ;
personnel reviewed the precedures for controlling locked valves with ;
each shift crew. The resident inspector attended three of these r discussions and found the review to be adequat (
'
This violation is close l
- f (Closed) Violation (458/8531-01)
- Failure to identify all valves in
' the valve lineup check sheet, required to conduct the integrated leak
'
rate tes i
!
!
The licensee has revised Surveillance Test Procedure STP-057-3703,
,
"Primary Containment Integrated Leak Rate Test," to include the six
- differential pressure instruments and the one motor operated valve .
l that were omitted from the original valve lineup in i L preoperational/ acceptance test procedure 1-PT-57-1. These valves !
i have been added to the valve lineup in STP-057-3703, utilizing f Temporary Change Notice 87-174 [
i
! This violation is close :
l (Closed) Violation (458/8727-02): Failure to initiate hot work ;
' permit for grinding activit '
- i
'
This violation involved the failure to secure a valid Hot Work Permit i
! and to establish a designated fire watch for grinding activities on l
{ !
! !
-
i
.
--a_ _ _ . _ _ _ _ _ - - - - -m__________ __. _ _ . - _ - _ _ _ _ . _
- _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ . . __ . _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _
.
. .
the Inboard Main Steam Isolation Valve 1821*A0V022B, The Assistant Plant Manager-Maintenance issued Memorandum Number APM-M-87-342 which promulgates the licensee's requirement for adherence to procedure The NRC inspectors have observed similar activities requiring a Hot Work Permit and establishment of a designated fire watch since the issuance of the above memorandum,- No further problems in this area have been identifie This violation is closed, (Closed) Violation (458/8716-01): Failure of followup action by the licensee to assure that specified corrective action for an NRC violation and a deviation had been complete The specified corrective actions have now oeen ccmpleted and verified. The licensee established a task force to review all previously identified corrective actions for NRC findings. Overdue items identified by the task force have all been completed. Field engineering has implemented a work tracking system which includes corrective actions for NRC items. Individual departments have assigned department coordinators to assure prompt attention and high priority to corrective actions for NRC items and other item Monthly trend information is provided to senior managemen The additional tracking and management attention should prevent recurrence of this proble This violation is close (Closed) Violation (458/8720-05): Failure to verify diesel fuel oil properties within 31 days as required by Technical Specification Subsequent verification by the licensee revealed that all required TS fuel oil properties were met. The licensee has entered TS fuel oil analysis requirements in the River Cend Surveillance Test Procedure Tracking Program to prevent future occurrences of this nature. TS training has been completed for the chemistry supervisor and applicable staff member This violation is close (Closed) Unresolved Item (458/8720-07): Two instances of misaligned instrument valves identified by the license Both of these instances of misaligned instrument valves were evaluated by the NRC to determine enforcement action for a subsequent case of misaligned instrument valves. This is documented in NRC Inspection Report 458/8728. Violation 8728-01 was issued for this subsequent case. Licensee corrective actions will be documented in response to this violatio This unresolved item is close __ ___ _
. .
' '
. .
5 (Closed) Violation (458/8724-02): Failure to utilize the proper revision of a surveillance test procedure for daily fire door position check The licensee has performed the surveillance test to the correct procedure and a review of past surveillance tests conducted revealed that no other tests had been conducted to the incorrect revisio Security personnel have received additional training to provide instruction on obtaining the correct procedure. Plant security has also been placed on distribution for procedure changes to the daily fire door position' surveillance tes This violation is closed, (Closed) Violation (458/8724-01): Inadequate 50P for the fuel pool cooling and cleanup syste This procedure allowed a siphen path of the upper fuel pool to be established to the condensate storage tank. The problem was compounded with inadequate controls on anti-siphon device The fuel pool siphon event and licensee corrective actions are fully described in NRC Inspection Report 458/872 The licensee has completed all corrective actions which included drilling redundant anti-siphon holes in the upper and lower fuel storage pool This violation is closed, (Closed) Unresolved Item (458/8640-03): Reactor core isolation cooling (RCIC)/ residual heat removal (RHR) steam lina break instrument setpoin The licensee had experienced problems with water formation in the instrument lines for the RCIC/RHR steam line break instrument. This water formation caused an instrument offset of negative 110 inches of water during RCIC system operation. During the first refueling outage in 1987, the licensee implemented a design modification to correct the problem. Testing conducted during plant startup in 1988 revealed that the water column formation condition has been corrected by the design modificatio This unresolved item is close (Closed) Violation (458/8636-01): Inadequate safety evaluation for a temporary modification to the control building ventilation syste The licensee identified that the safety evaluation for the temporary modification which removed a low air flow trip was inadequate. The evaluation failed to recognize that the automatic start of the redundant division of control building ventilation was also affected under certain conditions. The licensee took immediate action to restore the temporary alterations to the original uesign i
_ - _ _ _ _ - _ _ - - _ _ _ _ _ _ _
-
.
. .
!
!
l configuration. The licensee also performed an engineering evaluation which verified that manual operator actuation of the redundant system after 20 minutes would have prevented any room temperatures from exceeding the design basis temperatures. A review of other temporary alterations and prompt design changes revealed no other problems with safety evaluations. The temporary alteration program has been discontinued at River Bend. Additional procedural controls and training have been implemented to strengthen the safety evaluation ,
process for design modification This violaticn is closed, (Closed) Violation (458/8620-02): Engineering piping and instrument drawing (P&ID) differences between the actual system configuration and procedure ,
!
The licensee has corrected the specific differences identified by the NRC inspector. Additional procedural controls to ensure replacement of vent and drain line pipe caps have been implemented. Locked valve criteria have been examined and consistency with procedures and i drawings have been established. A 100 percent review of 220 P& ids i
have been completed and any discrepancies identified have been incorporated into design modifications to update the drawing This violation is close ; (Closed) Open Item (458/8040-04): Monitor licensee corrective actions for turning vane failures in ventilation system ductwor The licensee's corrective action for this problem included repair of i cracked dampers and removal of certain dampers of the annulus mixing system. The licensee also inspected other high velocity systems and no other turning vane problems were found. The dampers that were ,
repaired in the annulus mixing system were replaced with a heavy duty ;
assembly designed to withstand the inherent high velocity and i turbulent flow conditions of this system. These repairs have performed satisfactorily for about 2 years. Based on the repairs and ,
inspections performed to date, the licensee has determined that the i turning vane problems were limited to the initial failures discovered <
in the annulus mixirg system. No further corrective actions or !
inspections are deeued necessar This open item is close (Closed) Violation (458/8720-06): Failure to include necessary quality assurance (QA) controls in a procurement document for analysis of emergency diesel generator fuel oi The existing vendor supplying laboratory analysis services did not have a program to implement applicable 10 CFR Part 50, Appendix B, requirements for services provided. The licensee has recently
!
-. - - - , - , , . - , -----e,c.,,,n ..,...,,.,---._,e , - . . , - - , . . - - - - - - , , . . . - - . ~ - . - --- - - - ~ ~ ,
- _ ___-__ -___ - _ -_ _ - - __ _ ____________ ____-__ ____ ________ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
.
.
>
. ,
,
contracted with E. W. Saybolt & Company, Inc. for diesel generator fuel oil analysis. This vendor has recently implemented a QA program which was surveyed and evaluated by Gulf States Utilities. A Contract for services has been released based on this preaward survey '
and resolution of outstanding issue This violation is close . Status of Facility License Condition
(Closed) License Condition (?.C.7): "Prior to startup following the first refueling outage, GSV shall implement design modifications to improve the capabilities of existing bypassed and inoperable status indication used to -
monitor the status of safety-related systems. The specific design changes '
to be implemented are identified in a GSU letter dated December 3,1984, j as clarified in a GSU letter dated March 5,1985." 1 The licensee has installed an additional plant alarm panel in the main control room to implement the additional bypass / inoperable status indications defined in USAR Table 7.5-12. This new alarm panel supplemented existing control room alarm These alarm indications were tested and placed in operation following the first refueling outage at River Ben ,
i License Condition 2.C.7 is close . Licensee Action on NRC Bulletin 80-70 This area of the inspection was conducted to review licensee actions relative to NRC Bulletin No. 80-70, "Cracking and Failure of Jet Pump Hold I Down Beam Assemblies." The licensee's action on this bulletin was addressed in NRC Inspectior Report 458/85-54, paragraph 4. This bulletin remained open pending issuance of the inservice inspection (ISI) pla '
The resident inspector reviewed Appendix J of the licensee's ISI Plan issued May 19, 1987. This appendix establishes the frequency for reactor vessel exams which includes the entire jet pump exam, jet pump sensing
lines, jet pump riser brace, jet pump hold down beam, jet pump bolt and weld assembly, and reactor pressure vessel weld.
- c j This NRC bulletin is closed, i 5. 10 CFR Part 21 Reports i
The resident inspector was provided copies of selected 10 CFR Part 21 I reports by NRC Region IV, which may be applicable to equipment or services ,
i supplied to River Bend. These reports were provided to the licensee, who verified that the reports either had been or were being evaluated for applicability at River Bend. Any reports that were not already entered into the licensee tracking system were immediately entered. A listing of j reports by date, manufacturer, and subject is provided below:
i
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ - - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ . __ _ - _ _ _ -
. .
. .
i
September 16, 1986 - General Electric Company - Potential defect with solenoid valve rebuild kits for control rod drive hydraulic control unit January 19, 1988 - Limitorque Corporation - Improperly sized terminal lugs to motor leads. (Report submitted by Gulf States Utilities)
The resident inspector will continue to provide copies of potentially applicable 10 CFR Part 21 reports for licensee evaluation and a followup of licensee action on selected 10 CFR Part 21 reports will be conducted during future NRC inspection No violations or deviations were identified in this area of the inspectio . Surveillance Test Observation During this inspection period, the resident inspector observed the performance of Surveillance Test Procedures STP-505-4503, "RPS/ Control Rod B'ock-APRM Weekly CHFUNCT, Weekly CHCAL (C51*K6050) and 18 Month LSFT,"
6TP-508-4514, "Turbine Stop Valve Closure Monthly CHFUNCT (C71-N006 Channels A thru H," STP-110-0101, "Turbine Overspeed Protection System Weekly Operability Test," STP-051-0201 "RPS-Main Steam Isolation Valve-Closure Monthly CHFUNCT," and STP-509-0101, "Main Turbine Bypass System Valve Cycle Test." The following observations were made during the performances of the above surveillance tests:
STP-505-4503 - This surveillance procedure was performed on March 25, 1988, with the reactor in operational condition 1, to satisfy the weekly channel functional tests required by River Bend Station (RBS)
Technical Specification (TS) for the reactor protection system (RPS)
- average power range monitor (APRM) and control rod block-APRM instrument (CSI-APRM C). The APRMs are required to be operable when the reactor is in operational condition 1, 2, 3, 4 or The instrumentation and control (I & C) technicians obtained permission from the control operating foreman (C0F) prior to initiating this ST Communications were established between the two I&C technicians located at the instrument and the H13-P680 control panel. The at-the-controls (ATC) operator was notified prior to a RPS half-scram being inserted and was immediately notified when the RPS half-scram could be reset. The required jumpers were controlled in accordance with General Maintenance Procedure GMP-042, "Circuit Testing and Lifted Leads and Jumpers." During restoration, a 75 percent indicated power swing was observed on local power range monitor (LPRM) 4-C-30-15. After approximately 10 minutes, the LPRM returned to the expected indicated power. Maintenance Work Request (MWR) 115028 was initiated to investigate the cause for the erratic power swing '
F
,
i i
___ _ . _ _ _ . _ . _ _ _ _ . _ _ . _ _ _ _ _ _ _ _ _ _ . _ _ _ . . _ _ _ ._. . _ _ _ _ _ _ _ _ _ _ _ . . _ _ . _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ ___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _
r
.
' *
. . ,
'
i
,
- STP-508-4514 - This surveillance procedure was performed on March 26, ,
1988, with the reactor at 79 percent power. This STP is required to I be performed monthly with the reactor in operational condition 1, to meet the TS requirements for channel fuxtional testing of the RPS ,
t turbine stop valve closure and the end of cycle recirculation pump t trip system turbine stop salve closure (C71-N006) Channels A !
through H. Thissurveillancetestwasperformedinconjunctionwith STP-110-0101, "Turbine Overspeed Protection System Weekly Operability
'
, Test." Direct communications were maintained between the I&C :
technicians and ATC operator to minimize the time the turbine stop valves remained closed. The licensee determined that all the acceptance criteria was met and the test results were properly
- reviewed by the C0 [
STP-110-0101 - This STP was performed on March 26, 1988, with the :
reactor at 79 percent thermal power. This surveillance was performed !
to test each high pressure turbine stop valve, high pressure turbine !
control valve, low pressure turbine intermediate stup valve and low
- pressure turbine intercept valve. This surveillance is required to
! be performed every 7 days when the plant is in operational condition 1 or 2 to satisfy TS 4.3.8.2.a. This activity was closely supervised by the shift supervisor and plant parameters were allowed ,
to steady out prior to cycling the next valve. The expected RPS !
half-scrams were received when the turbine control valves were l cycled. All test acceptance criteria were met and the test results !
reviewed and accepted by the C0F, :
- STP-509-0101 - This STP was performed on March 26, 1988, with the reactor aT79 percent thermal power. This surveillance test demonstrates the operability of each of the two turbine bypass valves by cycling each valve through one complete cycle. This surveillance must be performed at least once every 7 days with the reactor in !
1 operational condition 1 as specified in TS 4.7.9.a. Full valve '
I travel was verified through indication of bypass valve position and a t decrease in megawatt electri'c output. Each valve was observed to ;
perform as expecte !
STP-051-0201 This surveillance was performed on March 26, 1988, with the reacIor at 79 percent rated thermal power. This monthly STP implements the requirement of TS Section 4.3.1.1 Table 4.3.1.1-1.6 to 4 perform a channel functional test of the RPS main steam line isolation valve (MSIV) closure instrumentation. The MSIVs were tested individually using the slow closure feature. The RPS
- half-scram was observed to actuate prior to the MSIV indicating ,
'
mid position, which actuates at approximately 10 percent closed, as !
expecte The MSIV was immediately allowed to reopen once the ,
intermediate position was indicated. The ATC operator closely !
, monitored main steam line flow instrumentation to ensure that the [
l
,
'
i
?
_ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _
. .
. .
T
i
!
MSIV was not traveling fully close Communications were maintained 5etween the ATC operator and the operator during the performaace of *
the MSIV channel functional surveillanc No violations or deviations were identified in this area of_the inspectio . Maintenance Observation On March 30, 1988, the licensee placed the Division II diesel generator in the maintenance mode to perform required preventive maintenanc The plant entered a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> limiting condition of operation (LCO) as required by the RBS TS 3.8.1. All of the Division I and III emergency core cooling systems and support systems remained operable during this LC0 perio The ~
resident inspector verified that the required clearance had been initiated in accordance with Admini*:rative Procedure ADM-0027,"Protective Tagging."
Each of the valves and breakers identified on the clearance (88-0338) were observed to be in their correct positions as specified by the clearance order. After completion of the preventive maintenance activities, the clearance was released and a post-maintenance test performed to verify i diesel generator operability. No problems were identified during the performance of the maintenance activities that could have resulted in the diesel generator not being able to fulfill its safety functio The a following preventive maintenance work activities were observed and/or f maintenance packages reviewed:
i P516420 - This maintenance activity involved inspection of the
,
governor linkages for wear and loose parts. The licensee found the j linkage mechanism to be acceptable.
P516738 - This maintenance activity involved inspection of the ring oilers. No problems were identified by the licensee during the inspection.
P516538 - Lubrication and inspection of fuel oil pump couplin The puap coupling was cleaned, reassembled and greased in accordance with
,
'
the lubrication manua No problems were identified during the inspectio *
P516266 - The starting air manifold was inspected as required by this
- maintenance work orde No problems were identified during the
'
inspection.
- No violations or deviations were identified in this area of the
,
inspectio I i Operational Safety Verification The resident inspectors observed operational activities throughout the inspection period and closely monitored operational events. Control room activities and conduct were generally observed to be well controlled.
t
. __ __ _ _ _ ______ ___ ____-
.. .
. .
. .
,
i 11 ;
Proper control room staffing was maintained and access to the control room operational areas was controlled. Selected shift turnover meetings were ;
- observed and it was found that information concerning plant status was l being covered in each of these meetings. System walkdowns of the "B" low pressure coolant injection system and low pressure core spray system were
-
conducted to verify major flow path and proper breaker alignment for ,
system operability. Plant tours were conducted, and overall plant cleanliness was good.
General radiation protection practices were observed and no problems were noted. Personnel exiting the radiation control area were observed and
"
radiation monitors were being properly utilized to check for '
contaminatio Prompt security officer response to door alarms was observed and compensatory posts were established where required. Protected and vital area barriers were found to be intact, t l The resident inspectors also reviewed licensee actions on operational events and potential problems. The results of reviews of selected items i are described below: l Emergency Exercise: The resident inspectors participated in the j licensee conducted emergency exercise on February 24, 198 This
'
exercise included local, state and federal participatio The NRC
'
participation included NRC Region IV management personnel on site and activation of the Region IV emergency response facility. An NRC inspection team was also on site to evaluate the licensee's emergency response capability. The evaluation results are documented in NRC Inspection Report 50-458/88-07. While participating in the exercise, !
the resident inspectors monitored the licensee actions to control and i mitigate the consequences of the simulated emergency. These i
.
observations were made in the control room, technical support center, i
?
and emergency operating facility. Licensee actions were deemed to be 1 controlled and proper to control and siitigate the simulated
- emergenc ;
' Inadvertent Activation of Emergency Sirens: At 7:31 p.m. CST on March 29, 1988, an emergency stren activated in West Feliciana Parish for approximately 3 minutes. The siren activation was caused by
'
lightning striking the siren. The Louisiana Office of Emergency Preparedness and the local radio station were notified of the
inadvertent siren activation. A message was transmitted over the emergency broadcast system at 7:49 p.m. CST stating that no actual ;
emergency existe ; Reactor Shutdown: During this inspection period, the licensee initiated a manual reactor shutdown as required by RBS T5s and !
received an automatic reactor scram during the subsequent reactor [
'
startu These reactor shutdowns are described below:
i a
r
_ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ . . _ _ _ _ _ _ _ _ _ - _ _ - _ _ - - _ _ _
. ..
. .
t l
Manual Reactor Shutdown Required by TSs: During full power operation on February 19, 1988, the "A" reactor recirculation pump tripped on an over-current condition. Reactor thermal power was reduced to within the limits specified in RBS TS Figure 3.4.1.1-1 within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and placed in Hot Shutdown :
within the subsequent 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. The licensee later determined that moisture had entered the pump motor conduit, which is i located in the drywell, resulting in the indicated ground at the i pump motor. The pump motor cable conduit was subsequently t cleaned and sealed and a reactor startup initiated on [
February 21, 198 *
Automatic Reactor Scram: During a reactor startup on February 21, 1988, with the reactor at approximately 4 percent thermal power, the reactor scram resulted from a main turbine trip signal. The reactor scram occurred during shell warming of '
the main turbine. Turbine first stage pressure was allowed to exceed the equivalent of 40 percent power and with the turbine stop valves closed, an automatic scram was initiated. The licensee has added a caution statement to the turbine shell warming procedure stating that a reactor scram will occur if (
turbine first stage pressure is allowed to exceed 40 percent indicated power. However, sufficient guidance was given in '
SOPS 50D-0080, "Turbine Generator Operation," Revision 4, to maintain turbine first stage pressure below 173 psig (40 percent power) and thus have prevented this reactor scra Reactor Core Isolation Cooling System: During this inspection period, the licensee experienced three events involving the reactor core isolation cooling (RCIC) system during surveillance testin ;
Two of these events involved repositioning of the RCIC suction line '
from the condensate storage tank (CST) to the suppression pool. The ;
third event involved an isolation of the RCIC system. These three ,
events are described below: ,i
STP-500-4550 - On March 8,1988, instrumentation and control (I&C) technicians were performing Surveillance Test Procedure STP-500-4550, "RPCS High and Low Power Setpoint Functional Test (C11-N654 A, D, C and D and C11-N655 A and B),"
when an unexpected actuation of relay E51-K79 energized, causing the RCIC suction path to transfer from the CST to the suppression pool. Similar occurrences have been identified in Condition Reports 86-1365, 86-1437, 87-0029, 87-0435, 87-0625, !
87-1715, 88-0043, 88-0052, 88-0143 and 88-0218, where spurious transients in Panel H13*P629 have caused trips in Rosemount trip i units. A field review of Panel H13*P629 panel wiring from the !
power supply to the rack identified several discrepancies with !
the signal ground and chassis ground. Modification ;
Request (MR) 88-0118 has been issued to correct the wiring i discrepancies and a log is to be maintained identifying any
'
i
l
_-_________ _____ _ __- - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _
__
.. .
_
further spurious trips. The above identified panel wiring discrepancies will be an unresolved item pending further review by the NRC inspector (458/8808-02). ,
- STP-209-4206 - On March 10, 1988, I&C technicians were -
performing STP-209-4206, "RCIC-Suppression Pool Water Level High Monthly CHFUNCT, 18 Month CHCAL, 18 Month LSFT (E51-N036A, E51-N636A) " when an incorrect lead was lifted from the adjacent panelspecIfiedintheSTP. This resulted in an unexpected switch of the RCIC '.uction path from the CST to the suppression poo The licensee's corrective actions to preclude reoccurrence will be to require the I&C technicians to give in-shop training on the event and the importance of ensuring actions required by the STP are first considered then correctly performe r STP-207-4538 - On February 23, 1988, during the performance of STP-207-4538, "RCIC Isolation-RCIC Steam Supply Pressure Low Monthly CHFUNCT," a lifted lead was relanded prior to the RCIC isolation being reset. This resulted in a RCIC turbine isolation and turbine tri This CTP had been revised per a temporary change notice (TCN) to identify a new lead to be lifted which is more readily accessible and will still prevent the turbine trip and isolatio Previous isolations have occurred because of shorting leads that were not easily accessibl However, the TCN required the I&C technicians to reland the lead prior to resetting the isolation signa A complete review of other applicable STPs was performed and no other instances where the lead was to be relanded prior to resetting the isolation logic were identified, e. Alarm Response Procedures - On March 10, 1988, the senior resident inspector was notified by the Office of Nu: lear Reactor Regulation that the setpoints given in Alarm Response Procedure [
(ARP) ARP-601-19, "P601-19 Alarm Responses," Revision 2, were incorrect for alarms 2403 and 20 9. This discovery was made during a review of a RBS TS change for main steam tunnel temprature isolations. Alarm numbers 2403 and 2409 are for main steam tunnel ambient temperature high and main steam tunnel ventilation differential temperature high. The immediate and long range actions to prevent the main steam isolation valves (MSIVs) from closing on high ambient temperature were reviewed by the resident inspectors, lhe immediate and long range actions were found to be inadequate for alarm 2403. The temperature at which the main steam tunnel ambient temperature should be maintained below was given as 180*F rather than the correct value of 130 F. A MSIV isolation will occur at 135* ;
In the event the main steam tunnel cooling systems can not maintain the ambient temperature from approaching the MSIV isolation setpoint, no additional operator actions are specified to prevent a full MSIV isolation. This failure to provide adequate ARPs for high main steam ;
tunnel temperature and differential temperature was identified by the i
. -__
- - ._
. * i
..
. .
l resident inspectors as an apparent violation (458/8808-01). The ,
licensee is presently reviewing the remaining ARPs for correct setpoint values. A condition report will be initiated by the licensee to identify and correct the identified deficiencie . Unresolved Item An unresolved item is an item about which additional information is required in order to determine if it is acceptable, a deviation, or a violation. There is one unresolved item in this repor Paragraph Item N Subject 8 458/8808-02 Panel Wiring Descrepancies I 1 Exit Intervfew An exit interview was conducted with licensee representatives identified i in paragraph 1 of this report. During this interview, the senior resident inspector reviewed the scope and findings of the inspectio t f