MONTHYEARIR 05000458/20240052024-08-22022 August 2024 Updated Inspection Plan for River Bend Station (Report 05000458/2024005) IR 05000458/20230062024-02-28028 February 2024 Annual Assessment Letter for River Bend Station - Report 05000458/2023006 IR 05000458/20230052023-08-21021 August 2023 Updated Inspection Plan for River Bend Station (Report 05000458/2023005) - Mid Cycle Letter IR 05000458/20220062023-03-0101 March 2023 Annual Assessment Letter for River Bend Station Report 05000458/2022006 ML23059A2332023-03-0101 March 2023 Cyber Security Inspection Request for Information ML22235A1082022-08-19019 August 2022 RBS Emergency Preparedness (EP) Exercise Inspection October 2022 RFI ML22186A0762022-07-0505 July 2022 Information Request, Security IR 2022402 ML22175A0652022-06-30030 June 2022 Notification of Inspection (NRC Inspection Report 05000458/2022004) and Request for Information ML22180A0612022-06-29029 June 2022 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000458/2022010) and Request for Information IR 05000458/20210062022-03-0202 March 2022 Annual Assessment Letter (Report 05000458/2021006) ML21253A2442021-09-13013 September 2021 Notification of NRC Triennial Heat Exchanger/Sink Performance Inspection (5000458/2021004) and Request for Information ML21232A2272021-09-0101 September 2021 RBS Mid-Cycle Inspection Plan Transmittal Letter 2021 ML21099A0312021-03-30030 March 2021 Email 3-30-2021 - Request for Information_ RBS EP Exercise Inspection (Week of 5_10_2021) ML21063A2372021-03-0303 March 2021 RBS 2020 Annual Assessment Letter ML20350B8112020-12-11011 December 2020 2021 RBS PIR Request for Information ML20337A4452020-12-0202 December 2020 Riverbend Station Inservice Inspection Request for Information ML20328A1202020-11-23023 November 2020 Notification of Evaluations of Changes, Tests, and Experiments Inspection (Inspection Report 05000458/2021001) and Request for Information ML20255A1892020-09-0909 September 2020 Email 09Sept2020 - RFI for RBS EP Exercise Inspection IR 05000458/20200052020-09-0101 September 2020 Updated Inspection Plan for River Bend Station (Report 05000458/2020005) ML20162A1122020-06-10010 June 2020 Notification of Inspection (NRC Inspection Report 05000458/2020003) and Request for Information ML20105A3712020-04-14014 April 2020 Notification of NRC Design Bases - Assurance Inspection (Teams) (05000458/2020011) and Initial Request for Information ML20055E1572020-03-0303 March 2020 RBS2019006 Annual Assessment Letter IR 05000458/20190052019-08-30030 August 2019 Updated Inspection Plan for River Bend Station, Report 05000458/2019005 ML19128A1012019-05-0808 May 2019 Notification of NRC Design Bases Assurance Inspection (Programs) (05000458/2019012) and Initial Request for Information IR 05000458/20180062019-03-0404 March 2019 Annual Assessment Letter for River Bend Station (Report 05000458/2018006) IR 05000458/20180052018-08-31031 August 2018 Updated Inspection Plan for River Bend Station (Report 05000458/2018005) ML18166A2362018-06-15015 June 2018 Notification Inspection Report 05000458/2018003, and Request for Information IR 05000458/20170062018-03-0101 March 2018 Annual Assessment Letter for River Bend Station (Report 05000458/2017006) IR 05000458/20170052017-08-28028 August 2017 Updated Inspection Plan for River Bend Station(Report 05000458/2017005) IR 05000458/20160062017-03-0101 March 2017 Annual Assessment Letter for River Bend Station (Report (05000458/2016006) ML17053C0312017-02-22022 February 2017 Notification of NRC Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans(05000458/2017008) and RFI IR 05000458/20160052016-09-12012 September 2016 Errata for Mid-Cycle Assessment Letter for River Bend Station (Report 05000458/2016005) IR 05000458/20164012016-08-31031 August 2016 Non-Public Security Inspection Plan for River Bend Station (NRC Physical Security Inspection Report Number 05000458/2016401) ML16242A3262016-08-31031 August 2016 Mid-Cycle Assessment Letter for River Bend Station (Report 05000458/2016005) IR 05000458/20150062016-03-0202 March 2016 Annual Assessment Letter for River Bend Station (Report 05000458/2015006) IR 05000458/20154012015-09-0101 September 2015 Non-Public Security Inspection Plan for River Bend Station (NRC Physical Security Inspection Report Number 05000458/2015401) IR 05000458/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for River Bend Station (05000458/2015005) ML15170A2332015-06-19019 June 2015 Notification of Evaluations of Changes, Tests, and Experiments, and Permanent Plant Modifications Inspection (05000458/2015007) and Request for Information IR 05000458/20144022014-09-0202 September 2014 Non-Public Security Inspection Plan for River Bend Station (NRC Physical Security Inspection Report Number 05000458/2014402) IR 05000458/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter for River Bend Station (Report 05000458/2014006) IR 05000416/20130062013-09-0303 September 2013 Mid-Cycle Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2013006) IR 05000458/20130062013-09-0303 September 2013 Mid-Cycle Assessment Letter for River Bend Station (Report 05000458/2013006) IR 05000458/20128012013-03-0404 March 2013 Annual Assessment Letter for River Bend Station (Report 05000458-12-801) IR 05000458/20120062012-09-0404 September 2012 IR 05000458-12-006, on 08/15/2012, Mid-Cycle Assessment Letter for River Bend Station, Inspection Plan ML12229A5112012-08-16016 August 2012 IR 05000458-12-010, River Bend, Augmented Inspection Team Follow-Up Inspection Planning Letter ML12180A5012012-06-28028 June 2012 IR 05000458-12-004, on 08/06/2012 - 08/10/2012, River Bend Station - Notification of Inspection (NRC Inspection and Request for Information) IR 05000458/20120012012-03-0505 March 2012 Annual Assessment Letter for River Bend Station (Report 05000458/2012001) ML11250A0632011-09-0707 September 2011 IR 05000458-11-005, on 11/14/2011, River Bend Station - Notification of Inspection and Request for Information ML1124305932011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan - River Bend Station IR 05000458/20110012011-03-0404 March 2011 IR 05000458-11-001, 03/01/2011 - 06/30/2012, Annual Assessment Letter for River Bend Station 2024-08-22
[Table view] Category:Letter
MONTHYEARIR 05000458/20213012024-11-14014 November 2024 NRC Initial Operator Licensing Examination Approval 05000458/2021301 ML24289A0312024-11-0808 November 2024 – Issuance of Amendments Related to the Removal of License Condition 2.F as Part of the Consolidated Line-Item Improvement Process (CLIIP) IR 05000458/20240102024-10-31031 October 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000458/2024010 IR 05000458/20240032024-10-31031 October 2024 Integrated Inspection Report 05000458/2024003 RBG-48315, Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement2024-09-24024 September 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement RBG-48306, Report of Changes and Errors to 10CFR50.462024-09-24024 September 2024 Report of Changes and Errors to 10CFR50.46 ML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24255A1192024-09-16016 September 2024 Notification of NRC Follow Up Inspection for One Severity Level (SL) III and Two SL IV or Three or More SL IV Violations and Request for Additional Information RBG-48311, Reply to a Notice of Violation, NRC Inspection Report 05000458/20240022024-08-28028 August 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2024002 IR 05000458/20240052024-08-22022 August 2024 Updated Inspection Plan for River Bend Station (Report 05000458/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24214A2752024-08-0202 August 2024 Acknowledgement of Readiness for Supplemental Inspection RBG-48308, Notification of Readiness for Supplemental Inspection2024-07-31031 July 2024 Notification of Readiness for Supplemental Inspection IR 05000458/20240022024-07-30030 July 2024 Integrated Inspection Report 05000458/2024002 and Notice of Violation ML24164A0862024-06-12012 June 2024 Notification of Commercial Grade Dedication Inspection (05000458/2024010) and Request for Information 05000458/LER-2023-005-01, Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String2024-06-0404 June 2024 Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 ML24093A0892024-05-16016 May 2024 Issuance of Amendment No. 214 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML24081A0072024-05-16016 May 2024 Issuance of Amendment No. 213 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b IR 05000458/20240012024-05-14014 May 2024 Integrated Inspection Report 05000458/2024001 ML24102A2842024-05-0707 May 2024 Summary of Regulatory Audit in Support of LARs to Revise Technical Specifications to Adopt Risk-Informed Completion Times and Implement the Provisions of 10 CFR 50.69 ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions RBG-48276, 2023 Annual Radioactive Effluent Release Report2024-04-23023 April 2024 2023 Annual Radioactive Effluent Release Report IR 05000458/20244022024-04-15015 April 2024 Security Baseline Inspection Report 05000458/2024402 (Full Report) RBG-48288, Louisiana Pollutant Discharge Elimination System Permit Renewal2024-04-15015 April 2024 Louisiana Pollutant Discharge Elimination System Permit Renewal ML24106A0432024-04-11011 April 2024 June 2024 Emergency Preparedness Exercise Inspection Request for Information ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair RBG-48277, 2023 Annual Radiological Environmental Operating Report2024-04-10010 April 2024 2023 Annual Radiological Environmental Operating Report IR 05000458/20243012024-04-0202 April 2024 Notification of NRC Initial Operator Licensing Examination 05000458/2024301 ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams IR 05000458/20240402024-03-15015 March 2024 – 95001 Supplemental Inspection Report 05000458/2024040 and Follow-Up Assessment ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24066A1802024-03-0707 March 2024 Notification of NRC Follow-Up Inspection for Any Severity Level I or II Traditional Enforcement Violation IR 05000458/20230062024-02-28028 February 2024 Annual Assessment Letter for River Bend Station - Report 05000458/2023006 RBG-48286, Revision to Owners Activity Report Form (OAR) for Cycle 222024-02-27027 February 2024 Revision to Owners Activity Report Form (OAR) for Cycle 22 RBG-48278, 2023 Spent Fuel Storage Radioactive Effluent Release Report2024-02-27027 February 2024 2023 Spent Fuel Storage Radioactive Effluent Release Report ML24031A0042024-02-21021 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0052 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000458/LER-2023-006, Automatic Reactor Scram Due to a Turbine Trip Following a Disconnect Failure at Switchyard2024-02-0808 February 2024 Automatic Reactor Scram Due to a Turbine Trip Following a Disconnect Failure at Switchyard RBG-48274, Notification of Readiness for Supplemental Inspection2024-02-0505 February 2024 Notification of Readiness for Supplemental Inspection IR 05000458/20230042024-01-30030 January 2024 Integrated Inspection Report 05000458/2023004 IR 05000458/20230402024-01-18018 January 2024 – 95001 Supplemental Inspection Supplemental Report 05000458/2023040 and Follow-Up Assessment Letter 05000458/LER-2023-005, Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String2024-01-16016 January 2024 Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 – Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and RBG-48271, Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk2024-01-12012 January 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk ML24011A1742024-01-11011 January 2024 Security Baseline Inspection Report (Cover Letter) 05000458/LER-2023-004, Drywall Post Accident Radiation Monitor Inoperable Due to Unrecognized Surveillance Failure2023-12-28028 December 2023 Drywall Post Accident Radiation Monitor Inoperable Due to Unrecognized Surveillance Failure ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting 2024-09-24
[Table view] |
Text
rch 4, 2003
SUBJECT:
ANNUAL ASSESSMENT - RIVER BEND STATION (REPORT 50-458/2003-01)
Dear Mr. Hinnenkamp:
On February 6, 2003, the NRC staff completed its end-of-cycle plant performance assessment of River Bend Station. The end-of-cycle review for River Bend Station involved the participation of all technical divisions in evaluating performance indicators for the most recent quarter and inspection results for the period from January 1 through December 31, 2002. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections that may conflict with your plant activities.
Overall, River Bend Station operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter was within the Regulatory Response column of the NRCs Action Matrix based on one finding of low to moderate risk significance (White) in the Emergency Preparedness Cornerstone for failure to comply with the requirements of 10 CFR 50.47(b)(7). Between 1985 and January 2002, River Bend Station did not provide emergency preparedness information to members of the public utilizing facilities within the licensees owner controlled area. A supplemental inspection utilizing Inspection Procedure 95001, Inspection Procedure for One or Two White Inputs in a Strategic Performance Area, was conducted during the week of November 25, 2002, and NRC reviewed your actions regarding this issue. Your evaluation of the issue was satisfactory and appropriate corrective actions had been implemented.
However, the significance of another finding, the failure to properly lock open a condensate valve that inadvertently closed following a reactor scram in September 2002 and resulted in a loss of feedwater flow, is still under review as part of the Significance Determination Process.
The enclosed inspection plan details the inspections scheduled through March 31, 2004. In addition to the baseline inspection program, Temporary Instruction 2515/148, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures, will be performed at River Bend Station during this inspection cycle. The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be
Entergy Operations, Inc. -2-resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last six months of the inspection plan are tentative and may be revised at the Midcycle Review meeting.
As you are aware, since the terrorist attacks on September 11, 2001, the NRC has issued several Orders and threat advisories to enhance security capabilities and improve guard force readiness. We have conducted inspections to review your implementation of these requirements and have monitored your actions in response to changing threat conditions. For calendar year 2003, we plan to continue these inspections and conduct portions of the security baseline inspection program, as well as perform additional inspections to evaluate your compliance with new requirements that may be ordered. Based on our final determinations in this regard, we will notify you of any inspection plan changes.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 817-860-8141 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Arthur T. Howell III, Director Division of Reactor Projects Docket: 50-458 License: NPF-47 Enclosure:
River Bend Station Inspection/Activity Plan cc w/enclosure:
Executive Vice President and Chief Operating Officer Entergy Operations, Inc.
P.O. Box 31995 Jackson, Mississippi 39286-1995 Vice President Operations Support Entergy Operations, Inc.
P.O. Box 31995 Jackson, Mississippi 39286-1995
Entergy Operations, Inc. -3-General Manager Plant Operations River Bend Station Entergy Operations, Inc.
P.O. Box 220 St. Francisville, Louisiana 70775 Director - Nuclear Safety River Bend Station Entergy Operations, Inc.
P.O. Box 220 St. Francisville, Louisiana 70775 Wise, Carter, Child & Caraway P.O. Box 651 Jackson, Mississippi 39205 Mark J. Wetterhahn, Esq.
Winston & Strawn 1401 L Street, N.W.
Washington, DC 20005-3502 Manager - Licensing River Bend Station Entergy Operations, Inc.
P.O. Box 220 St. Francisville, Louisiana 70775 The Honorable Richard P. Ieyoub Attorney General Department of Justice State of Louisiana P.O. Box 94005 Baton Rouge, Louisiana 70804-9005 H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, Louisiana 70806 President West Feliciana Parish Police Jury P.O. Box 1921 St. Francisville, Louisiana 70775 Michael E. Henry, State Liaison Officer Department of Environmental Quality P.O. Box 82135 Baton Rouge, Louisiana 70884-2135
Entergy Operations, Inc. -4-Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, Texas 78701-3326 Jimmy Bello, President Pointe Coupe Parish Police Jury P.O. Box 290 New Roads, Louisiana 70760 James Hunt, President East Feliciana Parish Police Jury P.O. Box 427 Clinton, Louisiana 70722 Ted Denstel, Parish President West Baton Rouge Parish Counsel P.O. Box 757 Port Allen, Louisiana 70767 Burt Babers, President West Feliciana Parish Police Jury P.O. Box 1921 St. Francisville, Louisiana 70775 Bobby Simpson, Mayor-President Office of the Mayor-President P.O. Box 1471 Baton Rouge, Louisiana 70821 Federal Emergency Management Ron Castleman, Regional Director Region VI, Federal Center 800 North Loop 288 Denton, Texas 76201-3698 Jim Brewer Assistant Chief Administrative Officer Office of the Mayor/President East Baton Rouge Parish P.O. Box 1471 Baton Rouge, Louisiana 70821
Entergy Operations, Inc. -5-Joanne Moreau, Director Dept. of Emergency Management East Baton Rouge Parish P.O. Box 1471 Baton Rouge, Louisiana 70821 Charles LeBlanc, Director Dept. of Emergency Management West Baton Rouge Parish P.O. Box 757 Port Allen, Louisiana 70767 Don Ewing, Director Dept. of Emergency Management Pointe Coupee Parish P.O. Box 248 New Roads, Louisiana 70760 Col. Michael A. Brown Assistant Director Louisiana Office of Emergency Preparedness 7667 Independence Blvd.
Baton Rouge, Louisiana 70806 Tara Wicker Asst. Chief Administrative Officer P.O. Box 1471 Baton Rouge, Louisiana 70821 Jesse Means, Director Dept. of Emergency Management West Feliciana Parish P.O. Box 1927 St. Francisville, Louisiana 70775 T. W. Prewitt, Director Dept. of Emergency Management East Feliciana Parish P.O. Box 640 Jackson, Louisiana 70748 Institute of Nuclear Power Operations (INPO)
700 Galleria Parkway SE Atlanta, Georgia 30339-5943
Entergy Operations, Inc. -6-Electronic distribution by RIV:
Regional Administrator (EWM)
DRP Director (ATH)
DRS Director (DDC)
Senior Resident Inspector (PJA)
Branch Chief, DRP/B (DNG)
Senior Project Engineer, DRP/B (RAK1)
Staff Chief, DRP/TSS (PHH)
RITS Coordinator (NBH)
RidsNrrDipmlipb V. L. Dricks, PAO (VLD)
W. A. Maier, RSLO (WAM)
C. J. Gordon (CJG)
DRS Branch Chiefs (TWP, ATG, CSM)
W. D. Travers, EDO (WDT)
C. A. Carpenter, Chief, Nrr/DIPM/IIPB (CAC)
R. K. Frahm, PPR Program Manager, NRR/DIPM/IIPB (RKF)
R. W. Sheron, Associate Dir. for Project Licensing and Technical Analysis (BWS)
S. Morris, Acting Chief, Regional Operations Staff, OEDO (SAM1)
H. Berkow, NRR Project Director (HNB)
R. Gramm, Chief, Section 1, NRR/DLPM (RAG)
D. Wrona, NRR Project Manager (DJW1)
S:\DRP\DRPDIR\EOC 2003\Assessment Letters\RBS.wpd RIV:C:DRP/B D:DRS D:DRP DNGraves;df;vlh DDChamberlain ATHowell
/RA/ /RA/ /RA/
2/26/03 2/27/03 3/2/03 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
Page 1 of 1 River Bend 03/05/2003 07:37:50 Inspection / Activity Plan Report 22 03/02/2003 - 03/31/2004 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EMB - ISI 2 1 IP 7111108G Inservice Inspection Activities - BWR 03/17/2003 03/21/2003 Baseline Inspections ACCESSPI - ACRSA/PI 1 1 IP 7112101 Access Control to Radiologically Significant Areas 03/24/2003 03/28/2003 Baseline Inspections 1 IP 71151 Performance Indicator Verification 03/24/2003 03/28/2003 Baseline Inspections ALARA2 - ALARA PLANNING AND CONTROLS 1 1 IP 7112102 ALARA Planning and Controls 03/24/2003 03/28/2003 Baseline Inspections ALARA3 - ALARA PLANNING AND CONTROLS 1 1 IP 7112102 ALARA Planning and Controls 07/14/2003 07/18/2003 Baseline Inspections SEC-TI - SECURITY ORDER VERIFICATION (2515/148) 4 1 IP 2515/148 Inspection of Nuclear Reactor Safeguards - Interim Compensatory Measures 07/14/2003 07/18/2003 Safety Issues RP-TM - RAD SAFETY TEAM 4 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 08/18/2003 08/22/2003 Baseline Inspections 1 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 08/18/2003 08/22/2003 Baseline Inspections 1 IP 7112202 Radioactive Material Processing and Transportation 08/18/2003 08/22/2003 Baseline Inspections 1 IP 7112203 Radiological Environmental Monitoring Program 08/18/2003 08/22/2003 Baseline Inspections PSB-S1 - SECURITY BASELINE INSPECTION 1 1 IP 7113002 Access Control (Search of Personnel, Packages, and Vehicles: Identification and Authorizati 10/06/2003 10/10/2003 Baseline Inspections 1 IP 7113003 Response to Contingency Events (Protective Strategy and Implementation of Protective Stra 10/06/2003 10/10/2003 Baseline Inspections 1 IP 71151 Performance Indicator Verification 10/06/2003 10/10/2003 Baseline Inspections OB-PIR - RB PIR INSPECTION 5 1 IP 71152B Identification and Resolution of Problems 10/27/2003 11/07/2003 Baseline Inspections EMB - TRIENNIAL FIRE PROTECTION 3 1 IP 7111105T Fire Protection 02/09/2004 02/13/2004 Baseline Inspections 1 IP 7111105T Fire Protection 02/23/2004 02/27/2004 Baseline Inspections ALARA1 - ALARA PLANNING AND CONTROLS 1 1 IP 7112102 ALARA Planning and Controls 02/09/2004 02/13/2004 Baseline Inspections ACCESSPI - ACRSA/PIV 1 1 IP 7112101 Access Control to Radiologically Significant Areas 02/23/2004 02/27/2004 Baseline Inspections EMB - MAINTENANCE EFFECTIVENESS 1 1 IP 7111112B Maintenance Effectiveness 03/15/2004 03/19/2004 Baseline Inspections This report does not include INPO and OUTAGE activities.