IR 05000458/1988014

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violation Noted in Insp Rept 50-458/88-14
ML20207L870
Person / Time
Site: River Bend Entergy icon.png
Issue date: 10/12/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Deddens J
GULF STATES UTILITIES CO.
References
NUDOCS 8810180004
Download: ML20207L870 (2)


Text

,

__

- -. -

-

- - - - - - - - - - - - - - - - - - - - - - - - -

___

.

..>.n OCT I 21988

,

.

i In Reply Refer To:

Docket:

50-458/88-14 i

I Gulf States Utilities ATTN: Mr. Jtmes C. Deddens Senior Vice President (RBNG)

P.O. Box 220 St, Francisv111e, Louisiana 70775 Gentlemen:

Thank you for your letter of September 22, 1988, in response to our letter and Notice of Violation dattJ August 22, 1988. We have reviewed your reply and find it responsive to the concerns raised in our Nutice of Violation. We will review the im;1ementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained.

.

Sincere 1/,

Original Signed 13y L J. Callan L. J. Callan, Director Division of Reactor Projects CC:

Gulf States Utilities ATTN:

J. E. Booker, Manager-River Bend Oversight P.O. Box 2951 Deaumont, Texas 77704

Gulf States Utilities ATTN:

les England. Director i

huclear Licensing - RBNG P.O. Box 220 St. Francisv111e, Louisiana 70775 l

Loutstana State University, Government Documents Departreent Louisiana Radiation Control Program Director R

KEPS:RPB C:

S:RPB C:RPB C:

BC D:

P JK

'

RJ tt BMurray Lo table LCallan P p/

/0/(7/

to /(.,

G tb /( /

p//

'\\

8310180004 881012 PDR ADOCK 05000458

FDC 1h@)

- - - - - - - - -

---

-

-

_ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ ________ ____ __________

. _ _ _ _ _ _ _ _ _ _ _

_ _ _ _

.

_ _ _ _ _ _ _.

_ _ _ _ _ _ _

,

.,

.

Gulf States Utilities-2-bec to DMB (IE04)

bec w/ copy of non-safeguards portion of letter dated August 22, 1988:

R. D. Martin, RA DRP Resident Inspector Section Chief, DRP/C Lisa Shea, RM/ALF MIS System DRS RSTS Operator RPB-DRSS RIV File Inspector Section Chief B. Murray R. L. Bangart R. E. Hall Project Engineer, DRP/C W. Paulson, NRR Project Manager

>

I

-

i I

l l

,

I

,

)

__

.

- _ _ _ _ _ _ _ _

/

.,

-

,

.

GULF STATES UTILITIES COMPA NY

>

.

-

..... w,:, m

, - - - - -

_

B O Vf E2 3

"

September 22, 1988 m1

,

.'

R8G-28873

,!

g-g 1l

'

File Nos. G9.5, G15.4.1 i

t

._-

h U. S. Nuclear Regulatory Comission Document Control Desk Washington, DC 20555 Gentlemen:

RIVER BEND STATION - UNIT 1 REFER T0: REGION IV DOCKET NO. 50-458/ REPORT 88-14 This letter is being provided at this time, as discussed w.th Mr. Les Constable, in response to the Notice of Violation contained in NRC Inspection Report No.

50-458/88-14.

The inspection was performed by Mr.

James A. F. Kelly on June 13-17, 1988 of activities authorized by NRC Operating License NPF-47 for River Bend Station - Unit 1.,

Gulf States Utilities Company's (GSU)

response to Violation 8814-01,

"Failure to Follow the Security Incident Reporting Requirements" is

,

provided in the enclosed attachment pursuant to 10CFR2.201.

This completes GSU's response to this item.

,

(

In accordance with F'.?R73.21, information contained in the attachment has l

been determined to contain safeguar'ds information and should be handled accordingly.

Should you have any questions, please contact Mr. Rick J.

King at (504)

381-4146, incer %,

, C. Deddens Senior Vice President River Bend Nuclear Group Attachment cc: U. S. Nuclev Regulatory Comission 611 Ryan P1 sa Drive, Suite 1000 Arlington, TX 76011 NRC Resident Inspector (w/o attachment)

THIS PAGE NOT SUBJECT TO PROTECTIVE REQUIREMrNTS WHEN SEPARATED FROM MATERIAL CONTAINING.

DDkDdk_____

'l