| | Start date | Site | Title |
|---|
| ML26034C213 | 12 February 2026 | Limerick | Correction of Amendment Nos. 268 and 230 to Revise the Licensing and Design Basis Related to the Replacement of Safety-Related Analog Control Systems with a Single Digital Plant Protection System |
| IR 05000461/2025004 | 10 February 2026 | Clinton | Integrated Inspection Report 05000461/2025004 |
| ML26007A265 | 21 January 2026 | Grand Gulf Arkansas Nuclear River Bend Waterford | Issuance of Amendments Related to Revision of Technical Specifications to Use Online Monitoring Methodology |
| ENS 58100 | 28 December 2025 22:06:00 | LaSalle | Manual Reactor Scram Due to RCS Leak |
| L-25-142, Application to Revise Technical Specifications to Adopt TSTF-576, Revise Safety/Relief Valve Requirements | 18 December 2025 | Perry | Application to Revise Technical Specifications to Adopt TSTF-576, Revise Safety/Relief Valve Requirements |
| 05000461/LER-2025-003, Scram Turbine Hydraulic Oil Leak | 16 December 2025 | Clinton | Scram Turbine Hydraulic Oil Leak |
| 05000388/LER-2025-001, Event Involving the Trip of the Unit 2 Main Generator and Subsequent Automatic Reactor Scram | 16 December 2025 | Susquehanna | Event Involving the Trip of the Unit 2 Main Generator and Subsequent Automatic Reactor Scram |
| IR 05000321/2025003 | 12 December 2025 | Hatch 07200036 | Integrated Inspection Report 05000321/2025003 and 05000366/2025003 Independent Spent Fuel Installation 07200036/2024001 Exercise of Enforcement Discretion |
| 05000458/LER-2025-007, Division 1 Balance of Plant Isolation Results in Manual Reactor Trip | 8 December 2025 | River Bend | Division 1 Balance of Plant Isolation Results in Manual Reactor Trip |
| SVPLTR 25-0069, Core Operating Limits Report for Dresden Unit 2 Cycle 30 | 25 November 2025 | Dresden | Core Operating Limits Report for Dresden Unit 2 Cycle 30 |