Category:Inspection Plan
MONTHYEARIR 05000458/20240052024-08-22022 August 2024 Updated Inspection Plan for River Bend Station (Report 05000458/2024005) IR 05000458/20230062024-02-28028 February 2024 Annual Assessment Letter for River Bend Station - Report 05000458/2023006 IR 05000458/20230052023-08-21021 August 2023 Updated Inspection Plan for River Bend Station (Report 05000458/2023005) - Mid Cycle Letter IR 05000458/20220062023-03-0101 March 2023 Annual Assessment Letter for River Bend Station Report 05000458/2022006 ML23059A2332023-03-0101 March 2023 Cyber Security Inspection Request for Information ML22235A1082022-08-19019 August 2022 RBS Emergency Preparedness (EP) Exercise Inspection October 2022 RFI ML22186A0762022-07-0505 July 2022 Information Request, Security IR 2022402 ML22175A0652022-06-30030 June 2022 Notification of Inspection (NRC Inspection Report 05000458/2022004) and Request for Information ML22180A0612022-06-29029 June 2022 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000458/2022010) and Request for Information IR 05000458/20210062022-03-0202 March 2022 Annual Assessment Letter (Report 05000458/2021006) ML21253A2442021-09-13013 September 2021 Notification of NRC Triennial Heat Exchanger/Sink Performance Inspection (5000458/2021004) and Request for Information ML21232A2272021-09-0101 September 2021 RBS Mid-Cycle Inspection Plan Transmittal Letter 2021 ML21099A0312021-03-30030 March 2021 Email 3-30-2021 - Request for Information_ RBS EP Exercise Inspection (Week of 5_10_2021) ML21063A2372021-03-0303 March 2021 RBS 2020 Annual Assessment Letter ML20350B8112020-12-11011 December 2020 2021 RBS PIR Request for Information ML20337A4452020-12-0202 December 2020 Riverbend Station Inservice Inspection Request for Information ML20328A1202020-11-23023 November 2020 Notification of Evaluations of Changes, Tests, and Experiments Inspection (Inspection Report 05000458/2021001) and Request for Information ML20255A1892020-09-0909 September 2020 Email 09Sept2020 - RFI for RBS EP Exercise Inspection IR 05000458/20200052020-09-0101 September 2020 Updated Inspection Plan for River Bend Station (Report 05000458/2020005) ML20162A1122020-06-10010 June 2020 Notification of Inspection (NRC Inspection Report 05000458/2020003) and Request for Information ML20105A3712020-04-14014 April 2020 Notification of NRC Design Bases - Assurance Inspection (Teams) (05000458/2020011) and Initial Request for Information ML20055E1572020-03-0303 March 2020 RBS2019006 Annual Assessment Letter IR 05000458/20190052019-08-30030 August 2019 Updated Inspection Plan for River Bend Station, Report 05000458/2019005 ML19128A1012019-05-0808 May 2019 Notification of NRC Design Bases Assurance Inspection (Programs) (05000458/2019012) and Initial Request for Information IR 05000458/20180062019-03-0404 March 2019 Annual Assessment Letter for River Bend Station (Report 05000458/2018006) IR 05000458/20180052018-08-31031 August 2018 Updated Inspection Plan for River Bend Station (Report 05000458/2018005) ML18166A2362018-06-15015 June 2018 Notification Inspection Report 05000458/2018003, and Request for Information IR 05000458/20170062018-03-0101 March 2018 Annual Assessment Letter for River Bend Station (Report 05000458/2017006) IR 05000458/20170052017-08-28028 August 2017 Updated Inspection Plan for River Bend Station(Report 05000458/2017005) IR 05000458/20160062017-03-0101 March 2017 Annual Assessment Letter for River Bend Station (Report (05000458/2016006) ML17053C0312017-02-22022 February 2017 Notification of NRC Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans(05000458/2017008) and RFI IR 05000458/20160052016-09-12012 September 2016 Errata for Mid-Cycle Assessment Letter for River Bend Station (Report 05000458/2016005) IR 05000458/20164012016-08-31031 August 2016 Non-Public Security Inspection Plan for River Bend Station (NRC Physical Security Inspection Report Number 05000458/2016401) ML16242A3262016-08-31031 August 2016 Mid-Cycle Assessment Letter for River Bend Station (Report 05000458/2016005) IR 05000458/20150062016-03-0202 March 2016 Annual Assessment Letter for River Bend Station (Report 05000458/2015006) IR 05000458/20154012015-09-0101 September 2015 Non-Public Security Inspection Plan for River Bend Station (NRC Physical Security Inspection Report Number 05000458/2015401) IR 05000458/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for River Bend Station (05000458/2015005) ML15170A2332015-06-19019 June 2015 Notification of Evaluations of Changes, Tests, and Experiments, and Permanent Plant Modifications Inspection (05000458/2015007) and Request for Information IR 05000458/20144022014-09-0202 September 2014 Non-Public Security Inspection Plan for River Bend Station (NRC Physical Security Inspection Report Number 05000458/2014402) IR 05000458/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter for River Bend Station (Report 05000458/2014006) IR 05000416/20130062013-09-0303 September 2013 Mid-Cycle Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2013006) IR 05000458/20130062013-09-0303 September 2013 Mid-Cycle Assessment Letter for River Bend Station (Report 05000458/2013006) IR 05000458/20128012013-03-0404 March 2013 Annual Assessment Letter for River Bend Station (Report 05000458-12-801) IR 05000458/20120062012-09-0404 September 2012 IR 05000458-12-006, on 08/15/2012, Mid-Cycle Assessment Letter for River Bend Station, Inspection Plan ML12229A5112012-08-16016 August 2012 IR 05000458-12-010, River Bend, Augmented Inspection Team Follow-Up Inspection Planning Letter ML12180A5012012-06-28028 June 2012 IR 05000458-12-004, on 08/06/2012 - 08/10/2012, River Bend Station - Notification of Inspection (NRC Inspection and Request for Information) IR 05000458/20120012012-03-0505 March 2012 Annual Assessment Letter for River Bend Station (Report 05000458/2012001) ML11250A0632011-09-0707 September 2011 IR 05000458-11-005, on 11/14/2011, River Bend Station - Notification of Inspection and Request for Information ML1124305932011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan - River Bend Station IR 05000458/20110012011-03-0404 March 2011 IR 05000458-11-001, 03/01/2011 - 06/30/2012, Annual Assessment Letter for River Bend Station 2024-08-22
[Table view] Category:Letter
MONTHYEARIR 05000458/20213012024-11-14014 November 2024 NRC Initial Operator Licensing Examination Approval 05000458/2021301 ML24289A0312024-11-0808 November 2024 – Issuance of Amendments Related to the Removal of License Condition 2.F as Part of the Consolidated Line-Item Improvement Process (CLIIP) IR 05000458/20240102024-10-31031 October 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000458/2024010 IR 05000458/20240032024-10-31031 October 2024 Integrated Inspection Report 05000458/2024003 RBG-48315, Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement2024-09-24024 September 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement RBG-48306, Report of Changes and Errors to 10CFR50.462024-09-24024 September 2024 Report of Changes and Errors to 10CFR50.46 ML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24255A1192024-09-16016 September 2024 Notification of NRC Follow Up Inspection for One Severity Level (SL) III and Two SL IV or Three or More SL IV Violations and Request for Additional Information RBG-48311, Reply to a Notice of Violation, NRC Inspection Report 05000458/20240022024-08-28028 August 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2024002 IR 05000458/20240052024-08-22022 August 2024 Updated Inspection Plan for River Bend Station (Report 05000458/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24214A2752024-08-0202 August 2024 Acknowledgement of Readiness for Supplemental Inspection RBG-48308, Notification of Readiness for Supplemental Inspection2024-07-31031 July 2024 Notification of Readiness for Supplemental Inspection IR 05000458/20240022024-07-30030 July 2024 Integrated Inspection Report 05000458/2024002 and Notice of Violation ML24164A0862024-06-12012 June 2024 Notification of Commercial Grade Dedication Inspection (05000458/2024010) and Request for Information 05000458/LER-2023-005-01, Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String2024-06-0404 June 2024 Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 ML24093A0892024-05-16016 May 2024 Issuance of Amendment No. 214 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML24081A0072024-05-16016 May 2024 Issuance of Amendment No. 213 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b IR 05000458/20240012024-05-14014 May 2024 Integrated Inspection Report 05000458/2024001 ML24102A2842024-05-0707 May 2024 Summary of Regulatory Audit in Support of LARs to Revise Technical Specifications to Adopt Risk-Informed Completion Times and Implement the Provisions of 10 CFR 50.69 ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions RBG-48276, 2023 Annual Radioactive Effluent Release Report2024-04-23023 April 2024 2023 Annual Radioactive Effluent Release Report IR 05000458/20244022024-04-15015 April 2024 Security Baseline Inspection Report 05000458/2024402 (Full Report) RBG-48288, Louisiana Pollutant Discharge Elimination System Permit Renewal2024-04-15015 April 2024 Louisiana Pollutant Discharge Elimination System Permit Renewal ML24106A0432024-04-11011 April 2024 June 2024 Emergency Preparedness Exercise Inspection Request for Information ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair RBG-48277, 2023 Annual Radiological Environmental Operating Report2024-04-10010 April 2024 2023 Annual Radiological Environmental Operating Report IR 05000458/20243012024-04-0202 April 2024 Notification of NRC Initial Operator Licensing Examination 05000458/2024301 ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams IR 05000458/20240402024-03-15015 March 2024 – 95001 Supplemental Inspection Report 05000458/2024040 and Follow-Up Assessment ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24066A1802024-03-0707 March 2024 Notification of NRC Follow-Up Inspection for Any Severity Level I or II Traditional Enforcement Violation IR 05000458/20230062024-02-28028 February 2024 Annual Assessment Letter for River Bend Station - Report 05000458/2023006 RBG-48286, Revision to Owners Activity Report Form (OAR) for Cycle 222024-02-27027 February 2024 Revision to Owners Activity Report Form (OAR) for Cycle 22 RBG-48278, 2023 Spent Fuel Storage Radioactive Effluent Release Report2024-02-27027 February 2024 2023 Spent Fuel Storage Radioactive Effluent Release Report ML24031A0042024-02-21021 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0052 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000458/LER-2023-006, Automatic Reactor Scram Due to a Turbine Trip Following a Disconnect Failure at Switchyard2024-02-0808 February 2024 Automatic Reactor Scram Due to a Turbine Trip Following a Disconnect Failure at Switchyard RBG-48274, Notification of Readiness for Supplemental Inspection2024-02-0505 February 2024 Notification of Readiness for Supplemental Inspection IR 05000458/20230042024-01-30030 January 2024 Integrated Inspection Report 05000458/2023004 IR 05000458/20230402024-01-18018 January 2024 – 95001 Supplemental Inspection Supplemental Report 05000458/2023040 and Follow-Up Assessment Letter 05000458/LER-2023-005, Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String2024-01-16016 January 2024 Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 – Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and RBG-48271, Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk2024-01-12012 January 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk ML24011A1742024-01-11011 January 2024 Security Baseline Inspection Report (Cover Letter) 05000458/LER-2023-004, Drywall Post Accident Radiation Monitor Inoperable Due to Unrecognized Surveillance Failure2023-12-28028 December 2023 Drywall Post Accident Radiation Monitor Inoperable Due to Unrecognized Surveillance Failure ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting 2024-09-24
[Table view] |
Text
rch 2, 2005
SUBJECT:
ANNUAL ASSESSMENT LETTER - RIVER BEND STATION (REPORT 05000458/2005001)
Dear Mr. Hinnenkamp:
On February 2, 2005, the NRC staff completed its end-of-cycle plant performance assessment of River Bend Station. The end-of-cycle review for River Bend Station involved the participation of the reactor technical divisions in evaluating performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2004. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections that may conflict with your plant activities.
This performance review and enclosed inspection plan do not include physical protection information. A separate end-of-cycle performance review letter designated and marked as Exempt from Public Disclosure in Accordance with 10 CFR 2.390 will include the physical protection review and resultant inspection plan.
Overall, River Bend Station operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). However, as a result of the continuous review of licensee performance by NRC staff, we concluded that the Unplanned Scrams per 7000 Critical Hours PI has crossed the threshold from Green to White following a reactor scram that occurred on January 15, 2005. Accordingly, we plan to implement Supplemental Inspection Procedure 95001, Inspection for One or Two White Inputs in a Strategic Performance Area, after you have informed us that your evaluation is complete. The purpose of this supplemental inspection is to provide assurance that the root causes and contributing causes of risk significant performance issues are understood, the extent of cause and condition are identified, and the corrective actions are sufficient to prevent recurrence.
Entergy Operations, Inc. -2-Additionally, the reactor scrams of August 15 and October 1, 2004, are the subject of review under the Reactor Oversight Process PI Frequently Asked Question process for inclusion under the Scrams with Loss of Normal Heat Removal PI. Depending on the outcome of this review, the Scrams with Loss of Normal Heat Removal PI could cross the Green to White threshold retroactive to the fourth quarter of 2004. If that occurs, a 95002 Supplemental Inspection, Inspection For One Degraded Cornerstone Or Any Three White Inputs In a Strategic Performance Area, will be conducted in accordance with the Degraded Cornerstone Column of the NRC Action Matrix in lieu of a 95001 Supplemental Inspection.
The NRC issued a White inspection finding and associated Notice of Violation in a letter to you dated December 29, 2003. The issue was initially discussed in NRC Inspection Report 05000458/2002007, dated February 7, 2003. It was also discussed in our annual assessment letter, dated March 3, 2004. This finding involved the failure to properly lock open a valve in the condensate system that resulted in a loss of feedwater flow following a reactor scram in September 2002. A supplemental inspection utilizing Inspection Procedure 95001, Inspection for One or Two White inputs in a Strategic Performance Area, was performed February 23-27, 2004, to assess the adequacy of your evaluation and to review the corrective actions you have taken for this risk-significant performance issue. Upon completion of the inspection, a Regulatory Performance Meeting was conducted as prescribed in NRC Manual Chapter 0305 to discuss the event, root causes, and corrective actions. The supplemental inspection concluded that your staff performed a comprehensive evaluation of the event. The corrective actions taken to address the issues and to prevent recurrence were satisfactory and have been completed.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through September 30, 2006. The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the midcycle review meeting.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact David N. Graves at (817) 860-8141 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Arthur T. Howell III, Director Division of Reactor Projects
Entergy Operations, Inc. -3-Docket: 50-458 License: NPF-47 Enclosure:
River Bend Station Inspection/Activity Plan cc w/enclosure: Attorney General Senior Vice President and Department of Justice Chief Operating Officer State of Louisiana Entergy Operations, Inc. P.O. Box 94005 P.O. Box 31995 Baton Rouge, LA 70804-9005 Jackson, MS 39286-1995 H. Anne Plettinger Vice President 3456 Villa Rose Drive Operations Support Baton Rouge, LA 70806 Entergy Operations, Inc.
P.O. Box 31995 Burt Babers, President Jackson, MS 39286-1995 West Feliciana Parish Police Jury P.O. Box 1921 General Manager St. Francisville, LA 70775 Plant Operations Entergy Operations, Inc. Michael E. Henry, State Liaison Officer River Bend Station Department of Environmental Quality 5485 US Highway 61N Permits Division St. Francisville, LA 70775 P.O. Box 4313 Baton Rouge, LA 70821-4313 Director - Nuclear Safety Entergy Operations, Inc. Brian Almon River Bend Station Public Utility Commission 5485 US Highway 61N William B. Travis Building St. Francisville, LA 70775 P.O. Box 13326 1701 North Congress Avenue Wise, Carter, Child & Caraway Austin, TX 78711-3326 P.O. Box 651 Jackson, MS 39205 Jimmy Bello, President Pointe Coupe Parish Police Jury Mark J. Wetterhahn, Esq. P.O. Box 290 Winston & Strawn New Roads, LA 70760 1401 L Street, N.W.
Washington, DC 20005-3502 James Hunt, President East Feliciana Parish Police Jury Manager - Licensing P.O. Box 427 Entergy Operations, Inc. Clinton, LA 70722 River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 The Honorable Charles C. Foti, Jr.
Entergy Operations, Inc. -4-Riley Berthelot, Jr., President Col. Jeff Smith, Acting Director West Baton Rouge Parish Police Jury Military Department P.O. Box 757 Louisiana Office of Emergency Port Allen, LA 70767 Preparedness P.O. Box 44217 Bobby Simpson, Mayor-President 7667 Independence Blvd.
Office of the Mayor-President Baton Rouge, LA 70806 East Baton Rouge Parish P.O. Box 1471 Jesse Means, Jr., Director Baton Rouge, LA 70821 Office of Homeland Security and Emergency Preparedness Federal Emergency Management Agency West Feliciana Parish ATTN: Ron Castleman, Regional Director P.O. Box 1927 Region VI, Federal Center St. Francisville, LA 70775 800 North Loop 288 Denton, TX 76201-3698 Travis W. Prewitt, Director Office of Homeland Security and Walter Monsour/Irma Plummer/Alfred Emergency Preparedness Williams East Feliciana Parish Assistant Chief Administrative Officer P.O. Box 1927 Office of the Mayor/President Jackson, LA 70748 East Baton Rouge Parish P.O. Box 1471 The Honorable William D'Aquilla Baton Rouge, LA 70821 Mayor, Town of St. Francisville P.O. Box 400 Joanne Moreau, Director St. Francisville, LA 70775 Office of Homeland Security and Emergency Preparedness Institute of Nuclear Power Operations (INPO)
East Baton Rouge Parish Records Center P.O. Box 1471 700 Galleria Parkway SE, Suite 100 Baton Rouge, LA 70821 Atlanta, GA 30339 Sharlot Edwards, Director Office of Emergency Preparedness West Baton Rouge Parish P.O. Box 757 Port Allen, LA 70767 Don Ewing, Director Office of Emergency Preparedness Pointe Coupee Parish P.O. Box 248 New Roads, LA 70760
Entergy Operations, Inc. -5-Electronic distribution by RIV:
Regional Administrator (BSM1)
DRP Director (ATH)
DRS Director (DDC)
DRS Deputy Director (MRS)
Senior Resident Inspector (PJA)
Branch Chief, DRP/B (DNG)
Senior Project Engineer, DRP/B (RAK1)
Team Leader, DRP/TSS (RLN1)
RITS Coordinator (KEG)
V. Dricks, PAO (VLD)
W. Maier, RSLO (WAM)
C. Gordon (CJG)
DRS Branch Chiefs (LJS, MPS1, ATG, JAC)
S. Richards, Chief, NRR/DIPM/IIPB (SAR)
M. Case, Deputy Dir. for Inspection and Programs (MJC)
B. Sheron, Associate Dir. for Project Licensing and Technical Analysis (BWS)
B. Wetzel, Acting Chief, ROPMS, OEDO (BAW)
H. Berkow, Director, LPD4, NRR/DLPM (HNB)
A. Howe, Chief, PDIV-1, NRR/DLPM (AGH1)
M. Webb, NRR Project Manager (MKW)
SISP Review Completed: _dng____ ADAMS: /Yes G No Initials: ___dng__
/ Publicly Available G Non-Publicly Available G Sensitive / Non-Sensitive S:\DRP\DRPDIR\EOC 04\Assessment Letters\RBS.wpd RIV:C:DRP/C D:DRS D:DRP DNGraves;df DDChamberlain ATHowell III
/RA/ /RA/ /RA/
2/28/05 2/25/05 2/28/05 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
Page 1 of 2 River Bend 03/01/2005 08:36:40 Inspection / Activity Plan Report 22 03/04/2005 - 09/30/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type ALARA2 - ALARA PLANNING AND CONTROLS 2 1 1 IP 7112102 ALARA Planning and Controls 02/28/2005 03/04/2005 Baseline Inspections EB17B - PERMANENT PLANT MODS 4 1 IP 7111117B Permanent Plant Modifications 03/07/2005 03/11/2005 Baseline Inspections OB-EP2 - EMERG PREPAREDNESS PROGRAM INSPECTION 2 1 IP 7111402 Alert and Notification System Testing 06/13/2005 06/17/2005 Baseline Inspections 1 IP 7111403 Emergency Response Organization Augmentation Testing 06/13/2005 06/17/2005 Baseline Inspections 1 IP 7111404 Emergency Action Level and Emergency Plan Changes 06/13/2005 06/17/2005 Baseline Inspections 1 IP 71151 Performance Indicator Verification 06/13/2005 06/17/2005 Baseline Inspections ACRSA - ACCESS CONTROL TO RAD SIGNIFICANT AREAS 1 1 IP 7112101 Access Control to Radiologically Significant Areas 06/20/2005 06/24/2005 Baseline Inspections ALARA3 - ALARA PLANNING AND CONTROLS 1 1 IP 7112102 ALARA Planning and Controls 09/26/2005 09/30/2005 Baseline Inspections PEB-52 - RBS PIR INSPECTION 5 1 IP 71152B Identification and Resolution of Problems 10/24/2005 10/28/2005 Baseline Inspections 1 IP 71152B Identification and Resolution of Problems 11/14/2005 11/18/2005 Baseline Inspections RP TEAM - RADIATION SAFETY TEAM INSPECTION 4 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 10/31/2005 11/04/2005 Baseline Inspections 1 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 10/31/2005 11/04/2005 Baseline Inspections 1 IP 7112202 Radioactive Material Processing and Transportation 10/31/2005 11/04/2005 Baseline Inspections 1 IP 7112203 Radiological Environmental Monitoring Program 10/31/2005 11/04/2005 Baseline Inspections ACRSA - ACCESS CONTROL TO RAD SIGNIFICANT AREAS 1 1 IP 7112101 Access Control to Radiologically Significant Areas 03/20/2006 03/24/2006 Baseline Inspections EB-08G - IN SERVICE INSPECTION (BOILER) 1 1 IP 7111108G Inservice Inspection Activities - BWR 03/20/2006 03/24/2006 Baseline Inspections OB-RQ - REQUALIFICATION INSP 3 1 IP 7111111B Licensed Operator Requalification Program 04/17/2006 04/21/2006 Baseline Inspections EB21 - ENG-SSD&PC 5 1 IP 7111102 Evaluation of Changes, Tests, or Experiments 06/05/2006 06/09/2006 Baseline Inspections 1 IP 7111121 Safety System Design and Performance Capability 06/05/2006 06/09/2006 Baseline Inspections 1 IP 7111121 Safety System Design and Performance Capability 06/19/2006 06/23/2006 Baseline Inspections PEB - MAINTENANCE RULE BIENNIAL 1 1 IP 7111112B Maintenance Effectiveness 06/26/2006 06/30/2006 Baseline Inspections ALARA1 - ALARA PLANNING AND CONTROLS 1 1 IP 7112102 ALARA Planning and Controls 07/10/2006 07/14/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 River Bend 03/01/2005 08:36:40 Inspection / Activity Plan Report 22 03/04/2005 - 09/30/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EP1 - EMERG PREPAREDNESS EXERCISE 3 1 IP 7111401 Exercise Evaluation 08/14/2006 08/18/2006 Baseline Inspections 1 IP 7111404 Emergency Action Level and Emergency Plan Changes 08/14/2006 08/18/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 08/14/2006 08/18/2006 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.