Text
.
s
,
.
.
y
..
.
In Reply Refer-To:
_
. Docket:
50-458/88-08
W 2m
Gulf States Utilities
ATTN: Mr. James C. Deddens
Senior Vice President (RBNG)
P.O.. Box-220
St. Francisville, LA 70775
Gentlemen:
This refers to the inspection conducted by Messrs. D. D. Chamberlain and
.
W. B. Jones of this office during the period February 16 through March 31,
1988, of activities authorized by NRC Operating License NPF-47 for River Bend
Station, and to the discussion of our findings with you and other members of
,
your staff at the conclusion of the inspection.
Areas examined during the inspection included status of facility license
condition, review of licensee action on NRC Bulletin 80-70, 10 CFR Part 21
reports, surveillance test observation, maintenance observation, and
4
operational safety verification. Within these areas, the inspection consisted
of selective examination of procedures and representative records, interviews
with personnel, and observations by the NRC inspectors. The inspection
findings are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities wera in
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.?01
of the NRC's "Rules of Practice," Part 2, Title 10. Code of Federal
Regulations. Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
One unresolved item is identified in paragraph 8 of the enclosed inspection
report.
We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items are identified in
paragraph 2 of the enclosed report.
1
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
"
by the Paperwork Reduction Act of 1980, PL 96-511.
i
DRP/C
DRP b
RIV:DRP/SR
DRP/C
p
DDChamberlain/cz
GLMadsen
EJHoll U
LJCallan
f/M/88
y/p/88
g /88
f/t /88
(E ol
8805060130 880S02
ADOCK 05000458
s \\
O
.- - -
-
- -
,
-
- _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _
_ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ - _ _ _
.
.
.
.
.
.
Gulf States Utilities
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,i:ul Qaed By:
Cng
L. J. CALLAN
L. J. Callan, Director
Division of Reactor Projects
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-458/88-08
cc w/ enclosures:
Gulf States Utilities
ATTN:
Mr. J. E. Booker, Manager-
River Bend Oversight
P.O. Box 2951
Beaumont, Texas 77704
Gulf States Utilities
ATTN:
Mr. Les England, Director,
Nuclear Licensing - RBNG
P.O. Box 220
St. Francisville, Louisiana 70775
Louisiana State University,
Government Documents Department
Louisiana Radiation Control Program Director
bec to DMB (IE01)
bcc distrib. by RIV:
- DRP
- Resident Inspector
R. D. Martin, RA
- Section Chief (DRP/C)
- Lisa Shea, RM/ALF
- HIS System
RPSB-DRSS
- RSTS Operator
- Project Engineer, DRP/C
- RIV File
- W. Paulson, NRR Project Manager
- R. Hall
- DRS
- TSS
- w/766