| | Site | Start date | Title | Description |
|---|
| NEI 99-04, (Pbaps), Units 1, 2, and 3, Annual Commitment Revision Report for the Period 01/01/25 Through 12/31/25 | Peach Bottom | 29 January 2026 | (Pbaps), Units 1, 2, and 3, Annual Commitment Revision Report for the Period 01/01/25 Through 12/31/25 | | | CNL-25-048, Units 1 and 2, Application to Revise Technical Specification 5.5.3 Radioactive Effluent Controls Program to Support Revision of the Offsite Dose Calculation Manual That Accounts for Radionuclides Generated When Using Potassium Hydroxide | Sequoyah | 15 January 2026 | Units 1 and 2, Application to Revise Technical Specification 5.5.3 Radioactive Effluent Controls Program to Support Revision of the Offsite Dose Calculation Manual That Accounts for Radionuclides Generated When Using Potassium Hydroxide | | | ML25356A361 | Clinton | 29 December 2025 | Integrated Inspection Report 05000461/2025003 and 07201046/2025001 | | | IR 05000461/2025003 | Clinton | 29 December 2025 | Integrated Inspection Report 05000461/2025003 and 07201046/2025001 | | | IR 05000483/2025003 | Callaway | 18 December 2025 | Integrated Inspection Report 05000483/2025003 | | | ML25351A235 | Callaway | 18 December 2025 | Integrated Inspection Report 05000483/2025003 | | | ML25290A035 | Susquehanna | 13 October 2025 | Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 3, Section 3.1, Conformance with NRC General Design Criteria | | | ML25290A009 | Susquehanna | 13 October 2025 | Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 1, Section 1.2, General Plant Description | | | ML25290A087 | Susquehanna | 13 October 2025 | Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 12, Section 12.2, Radiation Sources | | | ML25290A091 | Susquehanna | 13 October 2025 | Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 13, Section 13.2, Training Program | |
|