| Site | Start date | Title | Description |
---|
IR 05000454/2024003 | Byron | 12 November 2024 | Integrated Inspection Report 05000454/2024003 and 05000455/2024003 | |
ML24254A463 | | 31 October 2024 | Sdaa FSER Chapter 14 - ITAAC | |
IR 05000341/2024002 | Fermi | 14 August 2024 | Integrated Inspection Report 05000341/2024002 | |
IR 05000498/2024002 | South Texas | 9 August 2024 | Integrated Inspection Report 05000498/2024002 and 05000499/2024002 | |
IR 05000528/2024002 | Palo Verde | 29 July 2024 | Integrated Inspection Report 05000528/2024002 and 05000529/2024002 and 05000530/2024002 | |
ML24131A137 | | 23 May 2024 | NRC SLR Guidance Public Comment Crosswalk | |
IR 05000341/2024001 | Fermi | 30 April 2024 | Integrated Inspection Report 05000341/2024001 | |
ML24130A069 | South Texas | 25 April 2024 | Updated Final Safety Analysis Report, Revision 22, Chapter 13, Conduct of Operations | |
ML24113A127 | Byron Braidwood | 22 April 2024 | Audit Plan in Support of Review of LAR Revision of TS 3.7.15, 3.7.16, and 4.3.1 (EPID: L-2023-LLA-0136) (Non-Proprietary) | |
ML24109A097 | Monticello | 17 April 2024 | 1 to the Updated Safety Analysis Report, Chapter 15, USAR Drawings, Table of Contents | |