| Site | Start date | Title | Description |
---|
ML24254A463 | | 31 October 2024 | Sdaa FSER Chapter 14 - ITAAC | |
IR 05000341/2024002 | Fermi | 14 August 2024 | Integrated Inspection Report 05000341/2024002 | |
IR 05000498/2024002 | South Texas | 9 August 2024 | Integrated Inspection Report 05000498/2024002 and 05000499/2024002 | |
IR 05000528/2024002 | Palo Verde | 29 July 2024 | Integrated Inspection Report 05000528/2024002 and 05000529/2024002 and 05000530/2024002 | |
IR 05000341/2024001 | Fermi | 30 April 2024 | Integrated Inspection Report 05000341/2024001 | |
ML24130A069 | South Texas | 25 April 2024 | Updated Final Safety Analysis Report, Revision 22, Chapter 13, Conduct of Operations | |
ML24113A127 | Byron Braidwood | 22 April 2024 | Audit Plan in Support of Review of LAR Revision of TS 3.7.15, 3.7.16, and 4.3.1 (EPID: L-2023-LLA-0136) (Non-Proprietary) | |
ML24109A097 | Monticello | 17 April 2024 | 1 to the Updated Safety Analysis Report, Chapter 15, USAR Drawings, Table of Contents | |
ML24072A005 | Watts Bar | 15 April 2024 | Issuance of Amendment Nos. 165 and 72 Regarding Increase in the Maximum Number of Tritium Producing Burnable Absorber Rods and Supporting Changes, and Revision to the Updated Final Safety Analysis Report | |
ML23312A146 | Watts Bar | 8 November 2023 | Updated Final Safety Analysis Report (UFSAR) Amendment 5 - Table of Contents | |