| Site | Start date | Title | Description |
---|
IR 05000454/2024003 | Byron | 12 November 2024 | Integrated Inspection Report 05000454/2024003 and 05000455/2024003 | |
ML24254A463 | | 31 October 2024 | Sdaa FSER Chapter 14 - ITAAC | |
IR 05000341/2024002 | Fermi | 14 August 2024 | Integrated Inspection Report 05000341/2024002 | |
IR 05000498/2024002 | South Texas | 9 August 2024 | Integrated Inspection Report 05000498/2024002 and 05000499/2024002 | |
IR 05000528/2024002 | Palo Verde | 29 July 2024 | Integrated Inspection Report 05000528/2024002 and 05000529/2024002 and 05000530/2024002 | |
ML24131A137 | | 23 May 2024 | NRC SLR Guidance Public Comment Crosswalk | |
ML24122C630 | Dresden | 7 May 2024 | UFSAR Chapter 12, Radiation Protection Redacted | |
IR 05000341/2024001 | Fermi | 30 April 2024 | Integrated Inspection Report 05000341/2024001 | |
ML24130A069 | South Texas | 25 April 2024 | Updated Final Safety Analysis Report, Revision 22, Chapter 13, Conduct of Operations | |
ML24130A062 | South Texas | 25 April 2024 | Updated Final Safety Analysis Report, Revision 22, Chapter 1, Introduction and General Description of Plant | |