Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-458/88-21
ML20206G786
Person / Time
Site: River Bend Entergy icon.png
Issue date: 11/17/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Deddens J
GULF STATES UTILITIES CO.
References
NUDOCS 8811220457
Download: ML20206G786 (2)


Text

_ _ _ _ _ _ _ _ _ __

_ _ _

_

j h

~

j '

N.

....

,

NOV l 71988

.

,

.

.

..

,

,

In Reply Refer To:

Docket:

50-458/87-21 Gulf-States Utilities ATTN: Mr. James C. Deddens Senior Vice President (RBNG)

P.O. Box 220 St. Francisville, Louisiana 70775 Gentlemen:

Thank you for your letter of May 19, 1988, in response to our letter rnd Notice of Violation dated April 19, 1988. We have received your reply and find it responsive to the concerns raised in our Notice of Violation. We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been whieved and will be maintained.

Sincerely, Orijinal 4... c yy

.

A. D. Ucach L. J. Callan, Director Division of Reactor Projects cc:

Gulf Stater Utilities ATTN:

J. E. Booker, Manager-River Bend Oversight P.O. Box 2951 Beaumont, Texas 77704 Gulf States Utilities ATTN: Les England, Director Nuclaar Licensing - RBNG P.O. Box 220 St. Francisville, Louisiana 70775

,

Louisiana State University, Government Documents Department Louisiana Radiation Control Program Director bec to DMB (IE01)

'

RIV:RI J.

C:

$4

Pg e a F lhoan LJcallan 9'. p?

AJohnso

  1. //(,/88 n /i1/88 M AQ/88 5 $?bb gg

[$0l tp

'

'

,

,

,

.'.

-

,

Gulf States Utilities-2-

bec distrib. by RIV:

DRP RRI R. D. Martin, RA Section Chief (DRP/C)

Lisa Shea, RM/ALF MIS System RPB-DRSS RSTS Operator P.*oject Engineer, DRP/C RIV File W. Paulson, NRR Project Manager (MS:

13-D-18)

DRS A. Jrhnson T. Stetka

_ - _ _ _ _

'#

.,*

,

'

"

.

.

.

,

em

urzizrzas contraxv auze srnres

-

POST OF"#CE box 2951. BEAUMONT. TEXAS 777C4

- s AAEA OODE 713 836 6631 l

May 19, 1988 MAY 2 31988

,

'

RBO-27871

.

File Nos. G9.5, G15.4.1

--

.

U. S. Nuclear Regulatory Comission Document Control Desk Washington, DC 20555 Gentle =en:

RIVER BEND STATION - UNIT 1 REFER TO: REGION IV DOCKET NO. 50-458/ REPORT 87-21 This letter responds to the Notice of Violation contained in NRC

Inspection Report No. 50-458/87-21. Tha inspection was performed by Mr.

Johnson et al.

during the period of November 2-6, 1987 of activities

"

-

authorized by NRC Operating License NPF-47 for River Bend Station Unit 1.

Gulf States Utilities Co=pany's (CSU) responses to Notices of Violation 8721-01, "Failure to Adequately Support Qualification of Splices in Valve Operators," 8721-02, "Failure to Adequately Support Qualification of 300-Volt Instrunent Cable," 8721-03, "Failure to Adequately Support Qualification of Conax ECSA " and 8721-04,

"Failure to Adequately Support Qualification of MOV Terminal Blocks," are provided in the enclosed attach =ents pursuant to 10CFR2.201.

This completes GSU's responses to these items.

Sincerely, f.

W*

,

s

. E. Booker Manager-River Bend Oversight River Bend Nuclear Group

<

JEB/LAE/JRH/JVC/ch cc: /. S. Nuclest Regulatory Comission U

A 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 m

~

NRC Resident Inspector P.O. Box 1051 St. Francisville, LA 70775

-

Q h

yp

%

t ur _s

_ _.

.,

_

,

.

.,.

.

,

'

,

,

,.

.

.

.

.

UNITED STATES OF AMERICA

.

-

NUCLEAR REGULATORY COMMISSION STATE OF TEXAS

1 COUNTY OF JEFFERSON

1 In the Matter of

Docket No. 50-458

GULF STATES UTILITIES COMPANY

1 (River Bend Station Unit 1)

AFFIDAVIT J.

E.

Booker, being duly sworn, states that the in Manager-River riend Oversight for Gulf States Utilities Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission the documents attached hereto; that he has read all of the statements contained in such documents attached thereto and made a part thereof; and that all such statements made and matters set forth therein are true and correct to the best of his knowledge, information and belief.

,

d.f:. L dau fl.E. Booker Subscribed and sworn to befc e me, a Notary Public in and for the l

State and County above named, this /9 day of M

,

.

/ M O. d

'

Notary Public in and for

,

Jefferson County, Texas

..,i

,

.'.,

, i. ' "' \\

My Commission Expireu:

',

r

,

,

,

/-tf-qc

'l,,l

'

,

.

..- -.-,-._,,-__-_..-.._

. - __, _..__- _,.,.._.:

..

_

- _ _ - _.

.

,.

.

,

-

.

,.

.

-

.

.

Attachment 1

.

"

Response to Notice of Violation 50-458/8721-01 Level If REFERENCE:

Letter from J.

E.

tooker to Nuclear Re gulatory Commission, dated December 28, 1987.

Notice of Violatica - Letter from L. J. Callan to J. C.

Deddens, dated April 19, 1988.

FAILURE TO ADEQUATELY SUPPORT QUALIFICATION OF SPLICES IN VALVE j

OPERATORGt l

Paragraph (f) of 10CFR50..i9 requires that qualification of each i

component must be based en terting or experience with identical equipment, or with similar equipment with a supporting analysis, to show that the equipment to be qualified is acceptable.

Paragraph (k) of 10CFR50.49 states that equipment previously required by the Commission to be qualified to NUREG-0588 (For Comment version),

"Interim Staf f Position on Environmental Qualificaticn of Safety-Related Electrical Equipment " need not be requalified.

j Paragraph 5(1) of NURIG-0588 states that the qualification documentation shall verify that each type of electrical equipment is qualified for its application and meets its specified performance requirements. The basis of qualification shell be explained to show the relationship of all facets of proof needed to support adequacy of the complece equipment.

Data used to demonstrate the qualification of the equipaent shall be pertinent to the application and organised in an auditable form.

Contrary to paragraphs (f) and (k) of 10CFR50.49, and Section 5(1) of NUREG-0588, Category I,

EQ Job Book (EQJ3) 211.161 in the equipment quali81 cation file (EQF) for T95 and 35 tape splices, used in L.'.mitorque SMB/S'

motor operators inside and outside containment, did not adequately support qualification (1)

in that similarity between the tested in-line splice and the installed V-shape splice configurations was not established; and (2) the insulation recistance data taken during the in-line splice type test were not available in the EQF and consequently not reviewed for impact with regards to specified functional performance requirements of controi circuits at RBS.

REASON FOR VIOLATION:

During the evaluation of the qualification report (SDDF No.

6211.161-997-009A),

it apparently was assumed by Stone & Webster Engineering Corporation (SWEC) that Okonite Praving No. D-11486, Rev. 4 Attachment

Page

of 3

_

.

,

.

,

,

-

,

.

.

dated March 1, 1979, demonstrated similarity of the V-splice to the 90*

bolted lug splice identified as "Bolted Style Apparatus Lug".

'Furthermore, during consttuction at RBS, discussions held between Okonite and SWIC indicated that the V-splice was adequately represented by the tested configuration and therefore, the V-splice cor. figuration was added to Specification 248.000, the electrical installation specification.

Insulation resistance (IR) data was taken at various times during the qualification test program as described on page 7 of the test report.

The test report did not include IR data taken during the LOCA test sequence.

The IR data in the test report was evaluated for functional performance requirements as cocumented in the Category I Nonengineered Items Qualification Evaluation Sheet (pages 13 and 14 of the Qualification Program Results Checklist).

The technical performance evaluation for electrical characteristics states, "All post-LOCA values were acceptable - see NGRN, page 7 for exact values." The checklist is part of ths EQJB, was contained within the EQJB during the NRC inspection, and is dated November 31, 1981 Further review for IR data taken during the LOCA test was not performed because IEEE Standard 383-1974, "IEEE Standard for Type Test of Class IE Electric Cables. Field Splices, and Connections for Nuclear Power Generating Stations" and US NRC Regulatory Guide 1.131, "Qualification Tests of Electric Cables.

Field Splices, and Connections for Light-Water-Cooled Nvelear Power Plants", do not contain requirements for IR reasurecents during LOCA testing, but rather require operation under rated voltage and load, which was perfor=ed during the LOCA test.

The test report does indicate acceptable perf o r=anc e during the LOCA simulation.

GSU believes these do not constitute safety or technical concerns.

,

,

CORRECTIVE STETS WHICH HAVE BEEN TAKEN AND RESULTS ACHIEVED:

Upon 'ientification of the lack of a specific similarity analysis for the

,-splice, GSU immediately performed and documented the analysis requetted by the NRC inspectors. The similarity analysis was added to the EQJB during the inspection period.

The similarity analysis documents the acceptability of the V-splice, consisting of Okonite T-95 and No. 35 tape with bolted compression-type ring lugs oriented between 45* and 90' as required by Specification 248.000, appendix J,

as compared to the tested configuration consisting of 0xenite T-15 and No.

35 tape over an in-line splice made with compression-type butt splices.

The insulation resistance values measured by the equipment manufacturer

and requested by the NRC inspectors vers obtained during the inspection i

and were evaluated to assure that the reported values enveloped RBS conditions.

Engineering Department Procedure (EDP)-EQ-02, "Preparation, Review, Approval and pevision of Equipment Qualification Review Checklist "

was issued on February 4,

1988.

The procedure and checklist provide specific questions regardiag functional performance requirements and Attachuent

Page 2 of 3

- _ _ _ _ _ _ _ _ _ _

.

.

.

.

,

~

.

h similarity of tested-to installed-conditions. All EQJBs are being reviewed against the checklist and the completed checklist has been

' included in the EQJB.

Okonite Report NGRN-3 was in the Equipment Qualification File under EQJB 211.161 at the tice of the NRC inspection.

A specific reference to EQJB 211.161 is being added to the System Component Evaluation Worksheets (SCEW) for Linitorque motor operators to the splice qualification documentation.

CMP-1277

"Low, Medium and High Voltage Power Cable and Splicing,and Terminations " is a controlled plant maintenance procedure, and as such, controlled copies are maintained in the engineering department library for use by the EQ engineers.

Controlled copies of j

plant procedures are not included in the EQJBs.

l l

CORRECTIVE STEPS WHICH WILL BE TAKEN TO AVOID FURTHER VIOLATIONS As described in paragraph 2.3, EDP-EQ-02 was issued on 2/4/88, and will be used to review a total of 53 EQJBs to assure that similarity and functiona performance attributes of equipment qualification programs are adeque ely addressed in the RBS EQ files.

GSU has provided commitments to NRC via referenced letter dated December 28, 1967 to respond to the NRC's concern with auditability of the RBS EQJBs.

DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED Review of the EQJBs in accordance with EDP-EQ-02 has been completed and the checklist provided with the procedure incorporated into each job book.

Incorporation of the required references for documentation of functional performance requirements, and further demonstration of similarity of tested-to installed-equipment will be completed by June 30, 1988 for the EQJBa not reviewed by the NRC.

>

Attachment

Page 3 of 3

_

.

..

,

.-

_

.

.

,

,

,

.'

",

Attachment 2

.

Response to Notice of Violation 50-458/8721-02

~

"

Level IV REFERENCE:

Letter from J.

E.

Booker to Nuclear Regulatory Commission, dated December 28, 1987.

Notice of Violation - Letter from L. J. Callan to J. C. Daddens, dated April 19, 1988.

FAILURE TO ADEQUATELY SUPPORT QUALIFICATI0_N OF 300-VOLT INSTRUMENT CABLE:

Paragraph (f) of 10CFR50.49 requires that qua.'.ificat!.on of each component must be based on testing or experi nee with identical equipment, or with similar equipment with a supporting analysis, to show that the equipment to be qualified is acceptable.

Paragraph (k) of 10CFR50.49 states that equipment previcusly required by the Commission to be qualified to NUREG-0588 (For Comment version),

"Interim Staff Position on Environmental Qualification of Safety-Related Electrical Equipment," need not be requalified.

Paragraph 5(1) of NUREG-0588 states tLat the qualification documentation shall verify that each type of electrical equipment is qualified for its application and meets its specified performance requirements. The basis of qualification shall be explaiaed to show the relationship of all facets of proof needed to support adequacy of the :omplete equipment.

Data used to demonstrate the qualification of the equipment shall be pertinent to the application and organized in an auditable form.

Contrary to paragraphs (f) and (k) of 10CTR50.49, and Section 5(1)

of NUREG-0588 Category 1. EQJB 241.242 in the EQF for Rockbestos Firewall III 300-volt instrument cable, did not adequately support qualification (1)

in that similarity between the tested irradiation cross-linked insulation cable and th'. cable installed at RBS was not established (originally chemically cross-linked insulation cables were ordered at RBS and no information was available in the EQF to clarify what was installed); and (2)

in that no functional performance requirements on instrumentation circuits were performed and documented in the EQF in consideration of cable insulation resistances. 1he EQF did not verify that these cable types had been evaluated to meet the necessaty functional performance requirements specified.

Attachment 2 page 1 of 2

_ _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

- _ _ _ _ _

'

.,.

,.

,

[

.

.

'

.

REASON FOR THE VIOLATION:

.

'The similarity of the tested cable to the cable installed at RBS was established under SDDT 6241.242-158-012B, which was included in the EQJB at the time of the NRC inspection. Specifically, the SDDF includes a letter from the Rockbestos Coepany to SWEC, dated October 18, 1985 which provides a listing of cable procured under specification 241.242, by mark number, as compared to a test specimen from Rock *estos test reports QR5804, and QR5805.

The letter does not specifically identify whether the cross-linked polyethylene was manufactured with an irradiat. tan or chemical cross-linking process.

runctional performanta requirements for the cable were reviewed as evidenced by the equipaent qualification checklists contained in the EQJB.

Calculations documenting the acceptability of the insulation resistance measurements made during the LOCA testing were perf o rmed prior to the NRC inspection and were included in the EQJB in October 1987.

An analysis to evaluate the insulation resistance readings taken during the LOCA portion of the qualification test was performed and transnitted to GSU f rom SWEC via letters RBS-10926, dated October 16, 1987, and RBS-10930, dated October 28, 1987 The analysis was added to the EQJB upon receipt during October. No safety or technical concerns were identified.

.

CORRECTIVE STEPS WHICH HAVE BEEN TAKEN AND RESULTS ACHIEVED:

Similarity of the tested Rockbestos cable to the Rockbestos cable installed at RBS was further demonstrated by a letter received free Rockbestos Corporation dated November 13, 1987 which stated that all cable received at RBS under Specifiestion 241.242 was insulated with KXL 7600 irradiation cross-linked polyethylene. This letter has been added to the EQJB.

The analysis provided by SWEC to evaluate the insulacion tssistance of the cable during LOCA testing has been added to the EQJB as described

above.

!

CORRECTIVE STEPS WHICH WILL BE TAKEN TO AVOID FURTHER VIOLATIONS:

,

i l

EDP-EQ-02, discussed in response to Violation 458/8721-01, will assure that the similarity and functional performance requirements of future l

purchased items will be addressed in the EQJBs.

I DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED:

,

I The letter from Rockbestos Company indicating that RBS used nly

'

irradiation cross-linked polyethylene cable and the analysis of

potential leakage currents during a LOCA were incorporated into the EQJB during the NRC inspection period.

Attachment 2 Page 2 l

of 2 l

-

-

-

-

... - - - -. - - - - -.

Mp

.q.

,.

.

..

,,

Attachment 3 Response to Notice of Violation 50-458/8721-03

Level IV REFERENCE:

Letter from J.

E.

Booker to Nuclear Regulatory Commission, dated December 28, 1987.

Notice of Violation - Letter from L. J. Callan to J. C. Deddens, dated April 19, 1989.

FAILURE TO ADEQUATELY SUPPORT QUALIFICATION OF C0FAI ECSA-Paragraph (f) of 10CFR50.49 requires that qualification of each componer... must be based on testing or experience with identical equipment or with similar equipment with a supporting analysis, to show that the equipment to be qualified is acceptable.

Paragraph (k) of 10CFR50.49 states that equipment previously required by the Commission to be qualified to NUREG-0588 (For Comment version),

"Interim Staff Position on Environmental Qualification of Safety-Related Electrical Equipment," need not be requalified.

Paragraph 5(1) of NUREG-0588 states that the qualification documentation shall verify that each type of electrical equipment is qualified for its application and meets its specified performance requirements. The basis of qualification shall be explaired to show the relationship of all facets of proof needed to support adequacy of the complete eqsipment.

Data used to demonstrate the qualification of the equipment shall be pertinent to the application and organized in an auditable form.

Contrary to paragraphs (f) and (k) of 10CFR50.49, and Section 5(1) of NUREG-0588, Category I,

EQJB 211.161 in the EQF for Conax electrical conductor seal assembly (ECSA), did not adequately support qualification in that similarity between the tested ECSA and those installed was not established at RBS. The test profile, contained in the EQF, did not envelope the 100-day postaccident operating tinc.

The EQF did not

,

verify that the installed ECSAs had been evaluated to meet the necessary

'

functional performance requirements specified.

REASON FOR THE VIOLATION:

The simi'.arity between the tested electrical conductor seal assembly (ECSA) and those installed at RBS was established prior to the November 30, 1985 deadline reqt'. red by 10CFR50.49. Nonengineered Item Data Sheet 1136A, Specification 211.161, line number 152.8 states,

"Documentation Required:

Certificate of Conformance that the materials described in the purchase order, and supplied by the vendor, are identical to those

tested under the following reports:

Attachment 3 Page 1

,

of 3

'

l m

._

'

.

,.

.

,

'

.

.

1.

IPS-409, Revision A (RBS SDDF 6211.161-997-046A)

2.

IPS-409.1 (RBS.SDDF 6211.161-997-046A)

3.

IPS-1079 (RBS SDDF 6211.161-997-046A)

'

4.

IPS-1055 (RBS SDDF 6211.161-997-046A)

5.

IPS-1184 (RBS SDDF 6211.161-997-045A)"

IPS-1184, Section 4.1 states, "The ECSA Test Specimen Assembly shown in Conax Drawing N-20015 (Ref 2.5, Appendix C)

is identical to actual production ECSAs." In addition, the Certificate of Conformance supplied to the NRC Inspector during the inspection provided the information I

required by the specification and identified reports listed above es t

applicable to the supplied devices.

Similerity between the tested and installed configuration was also demonstrated.

IPS-1184, Section 4.2 states, "The four (4) ECSA inboard end connectors were spliced together in pairs using standard RayChem WCSF-N heat shrink tubing and procedures...".

RBS drawing no.

12210-EE-450BB shows the use of RayChem WCSF-N for installation of ECSAs t

through reference to the manufacturer's installation instructions.

With the exception of the Certificate of Cc formance, all documentatien discussed above was ine.luded in the EQJB.

The test profile contained within IPS-1184 (SDDF 6211.161-997-045A)

was

'

used as the basis for calculation 12210-EQS-53 dated May 20, 1985 which establinhed a 100 day postaccident operability period for equipment located outside the containment.

For equipment located within the

,

containment and required to be operable during a LOCA, the tested l'

profile was approximately 5'F lower than the RBS profile from t=30 minutes until t=3 hours. The test report was accepted on the basis that

,

the test profile provide

, to 40'F margin during the initial transient and from 10'F from t=3 hc s to approximately 140'F margfu at 15 days of the simulation, f

Upon identification of the NRC Inspectors concern with the test profile,

/

calculation G13.18.15.1*35 was performed to demonstrate the adequacy of the test profile as compared to RBS specific conditions.

The

!

calculation used an activation energy of 3.916 eV which had been providad by Conax and contained within the EQJB. The activation energy i

is based upon testing contained in Conax IPS-325 (contained within the EQJB)

and uses the methods described in IEEE Standard 101-1972, "Guide for Statistical Analysia of Thermal Life Test Data".

The IEEE standard

,

!

(

is the industry standard for development of activation energy values for T

noneetallic materf21s. Therefore, use of the activation energy provided

!

by Conax with the basis adequately documented is justified.

(

.

The EQJB demonstrated that the installed ECSAs had been evaluated for

,

t the specific performance requirements at RBS.

Specification 211.161,

'

Data Sheet 1136A, line 151.36 states that post-LOCA leakage current I

shall not exceed 0.02 mAdc. Section 6.7.4.2.1 of Conax IPS-1184 states,

"Recorded leakage currents never exceeded tl.e diminut! /e value of 0.02 mAdc over the test duration." The review checklist indicated that the

functional performance requirements demonstrated by IPS-1184 were j

l acceptable. This information was in the EQJB prior to the November 30,

!

l l

Atta:hment 3 Page 2 l

of 3

-

-

.

.'

.

.

.

,

.-

1985 deadline ptovided in 10CFR50.49. No technical or safety concerns were identified.

-

,

CORRECTIVE STEPS ivHICH HAVE BEEN TAKEN AND RESULTS ACHIEVED:

Upon identification of the discrepancy between the tested and specified LOCA profiles, an immediate evaluation was performed, documented in RBS calculation no. G13.18.15.1*35, and added to the EQJB.

CORRECTIVE STEPS WHICH WILL BE TAKDI TO AVOID PURTHER VIOLATIONS:

EDP-EQ-02, "Preparation, Review, Approval and Revision of Equipment Qualification Review Checklist," was issued on February 4, 1988. The procedure gives guidance on review and documentation of equipment qualification test results as compared

'o specific RBS conditions,

.

pATE WHEN FULL COMPLIANCE WILL BE ACHIEVED Calculation G13.18.15.1*35 was completed and added to the EQJB on November 18, 1987.

EDP-EQ-02 was issued on February 4, 1988.

Attachment 3 Page 3 of 3

..

_

_

.

- -

. __

, _ _.__,

._

. - -. _ -

.-. -

.-

,.

,.

.

.

.

,

.

Attachment 4

.

'

Response to Notice of ViolatGon 50-458/8721-04 Level IV RF.FERENCE:

Letter from J.

E.

Booker to Nucleer Regulatory Commission, dated

-

December 28, 1987.

Notice of Violation - Letter from L. J. Callan to J. C.

Deddens, dated April 19, 1988.

,

FAILURE TO ADEQUATELY SUPPORT QUALIFICATION OF HOV TERMINAL BLOCKS:

Paragraph (f) of 10CFR50.49 requires t: tat qualification of each component must be based on testing or experience with identical equipment, or with similar equipment with a supporting analysis, to show that the equipment to be qualified is acceptable.

Paragraph (k) of 10CFR50.49 states that equipment previously required by the Commission to ba qualified to NUREG-0588 (For Comment version),

"Interim Staff Position on Environmental Qualification of Safety-R31ated Electrical Equipment," need not be requalified.

Paragraph 5(1) of NUREG-0588 states that the qualification documentation shall verify that each type of electrical equipment is qualified for its application and meets its specified performance requirements. The basis of qualification shall be explained to show the relationship of all facets of proof needed to.upport adequacy of the complete equipment.

Data used to demonstrate the qualification of the equipment shall be pertinent to the application and organized in an auditable form.

Contrary to paragraphs (f) and (k) of 10CFR50.49, and Section 5(1) of NUREG-0588, Category I,

EQJB BOP-Limitorque and EQJB SRN S03 for Limitorque motor operators, did not adequately support qualification (1)

in that the terminal block ('i3) types used within the operators were not identified in the documentation file; (2) no methodology to establish qualification of these Tos were in the documentation file; and (3) a similarity analysis, to demonstrate qualification of tbs used in operaters represented by the EQJB SRN S03 file, was not available.

REASON FOR THE VIOLATION:

The tbs used within Limitorque operators were not identified in the EQJB at the time of the NRC inspection.

Maintenat. a work order (MWO)

R103851, dated February 3

'.987 was in the process of being completed during RBS refueling outage 1 (during the NRC inspection).

MWO R103851 was written in response to a concern with qualification of tbs in timitorque operators.

The MWO required that a 100% walkdown of all

,

l Attachment 4 Page 1 of 3

,

-

. ',

.

.

.

-

.

Limitorque operators be performed during RF1 to identify the make and model number of all tbs.

The traceability to existing qualification

' documentation was to be per f ormed upon completion of the walkdown

'

inspection.

The qualification documentation for tbs sithin the Limitorque operators could not be referenced on the SCEWs until the TB had been specifically identified.

RBS had previously obtained Limitorque test report B0119, on the various tbs stich provided documentation of testing performed included in the manufacture of Limitorque operators. During the course of the inspvetion, the NRC inspector stated that the NRC's position on B0119 vaa that the testing only demonstrated the adequacy of one type of

)

TB described in the test report. The NRC position was based upon a draft Information Notice which was not made available to GSU. As a result, CSU obtained Corporate Consulting Limited Report No.

A-686-85 (SDDF 6211.161-997-139A and 138A), performed the necessary similarity and functional performance,alyses, and added the documentation to the EQJB (SDDF 6228.212-047-1;JB) during the inspection period. The test report was subsequently revd.eved during the inspection and found to be acceptable.

References on the SCEW sheets to the appropriate qualification docutentation for the as found tbs could not be completed prior to the corpletion of the walkdown. The walkdown was completed on November 15, 1987, and revision control forms were prepared to litt the TB qualification on the SCEW sheets.

With regard to specific tbs inspected, as discussed during a telephone exit meeting on December 2,

1987, the Buchannan tbs contained within valves 1E22*MOVF004, and 1DTR*MOV146 vare replaced with qualified splices.

Even though the physical attributes of the tbs identified them as one of the Buchannan medel numbers qualified for service at RBS, the tbs were replaced with splices because no specific model number identification was visible on the TB.

The walkdown sheet for 1E22*MOVF001 indicates that as of October 5,

1987, this valve contained a tape splice.

Furthermore, following the NRC valkdown, GSU was requested to provide the documentation that controlled installation of the splice for valve IE22*MOVF001.

ISWP*MOV507B was determined to contain a Marathon 300 TB during the Limitorque walkdown.

These examples do not represent technical or safety concerns.

I CORRECTIVE STEPS WHICH HAVE BEEN TAKEN AND RESULTS AC3IEVED:

Upon completion of the activities required under MWO R103851, the tbs used in each Limitorque operator have been identified, the associated qualification documentation identified, and the specific reference added to the SCEw x%eet.

CORRECTIVE STEPS eRICH WILL BE TAKEN TO AVOID FURTHEd VIOLATIONS:

EDP-EQ-02,

"Preparation, Review. Approval and Revision of Equipment Qualification Review Checklist," was issued on February 4,

1988.

The ptocedure provides guidance on review and documentation of equipment qualification test results as compared to specific RBS conditions.

Attachment 4 Page 2 of 3

_a

.

s '..

-

-.

'

.

-

.

.

i.

DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED,:

.?he SCEW sheets for Limitorque operators have been updated to include f.dentification of the tbs by manufacturer and model number, reference to the appropriate qualification file, and identification of the reduced voltage calculation performed for each Class 1E Limitorque operator used at RBS. Updated SCEW sheets will be placed it. the EQJBs by June 30, 1988.

'

!

l

.

a i

a

t i

!

!

!

'

I

,

!

I

l

,

!

l I

r

!

'

'

l

'

i

[

,

Attachment 4 Page 3 of 3