ML18022A429

From kanterella
Revision as of 17:35, 19 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Package of Five Comments Urging Denial of Util Request for Exemption from 10CFR50,App E Requirements Re Emergency Response Plan Full Participation Exercise within 1 Yr Prior to Commercial Operation of Plant
ML18022A429
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/23/1986
From: MEDDOR A J, RISEKER R
AFFILIATION NOT ASSIGNED
To: DENTON H R
NRC
References
NUDOCS 8609230282
Download: ML18022A429 (12)


Text

REGULA Y INFOR~)}ATION DISTR I BUTI BYBTE}'}(R IDB)ACCESSION NBR: 8609230282 DOC.DATE: 86/09/23 NOTARIZED:

NO DOCKET FACIL: 50-400 Sheav on Hav ris Nucleav Power Planti Unit 1.Cav olina 05000400 AUTH.NAE AUTHOR AFFILIATION }'}EDDORi A.J.Affiliation Not Assigned RISEKER>R.Affiliation Not Assigned REC IP.NAI'}E RECIPIENT AFFILIATION DENTON, H.R.Office of Nuclear Reactor Regulation> Directov (post 85ii25

SUBJECT:

Package of five commentsI urging denial of util v equest for exemption from lOCFR50>App E re conduct of emev gene g v'esponse plan full pav ticipation exev cise within one gear pr i ov'o c ommer c i al opev ation o f plant.DIBTRIDVTIQN CODE: YECSD CQPIEB RECEIVED;LTR/ENCL g SIZE: TITLE: Request fov NRR Action (e.g.2.206 Petitions) Sc Related Cov v espondenc NOTES: Application fov permit v enewal filed.05000400 RECIPIENT ID CODE/NANE PWR-A PD2 LA BUCKLEY>8 Ol INTERNAL: EDO/ACB ELD FILF COPIES LTTR ENCL RECIPIENT ID CODE/NAi}E P4lR-A PD2 PD ELD/HDBl NRR DIR COPIEB LTTR ENCL EXTERNAL LPDR NBIC 03 05 NRC PDR 02 TOTAL NUl'}}3ER OF COPIEB REQUIRED: LTTR 11 ENCL -I"k I.L.1'i'I\t 1~4

Dear Hr.Denton:

I wish to urge dermal of CPS.1's request for exemption from the-d'equirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.Because of the, need for changes in the evacua-tion plan, I~g~believe this exercise should be conducted before the plant is permitted to operate at all.Jl Sincerely,]C'b09230282 600000 8+0923 pOa Woo<~0 Poa H Vr e 1~l g) C H~~f

Dear Hr.Denton:

I wish to urge denial of CPS,L's request for exemption from the requirement, und~10 CFR 50, Appendix E, that the Companp~<donductPa full participation exercise of t'e~Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, l believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely, vn p.~w ((f l~i'" i'~u~'-'g".4~i9 t'0'~w (p I'l

Dear Mr.Denton:

I wish to urge denial of CPS,L's truest for exemption from the requirement, upper 10 CPR 50, Appendix E, that the Company conduct a full participation exercise'o'd the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, l believe this exercise should be conducted before the plant is permitted to operate at, all.Sincerely, (@~)~ r I>\5C ip t 1.

Dear Mr.Denton:

I wish to urge denial of G16L's request for exemption from the requirement, unbar 10 CFR 50 Appendix E, that the Company conduct a full participation exercise of the Emergency Respons Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.Because of the need for changes in the evacua-tion plan, i believe this exercise should be conducted before the plant is permitted to operate at all.Sincere ~~

Dear'Nr.Denton:

~w h t e denial of CPSL's request for I wish to urge'nr 10 CFR 50, exemp ion t on from the requirement, un'der full Appen ix O'that the Company conduct a ful ation exercise of the Emergency p Res onse Sh on Harris nuclear power plant articxpa i Plan, for its ear h'ear before beginning commercial t n of the plant or before operating a g'reater than five percent of rated power.Because o f the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.Sincerely, C' ~AM I}}