ML20210V562: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
#REDIRECT [[IR 05000254/1986017]]
{{Adams
| number = ML20210V562
| issue date = 10/01/1986
| title = Forwards Insp Repts 50-254/86-17 & 50-336/86-19 on 860818- 0929.No Violation Noted
| author name = Wenzinger E
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| addressee name = Opeka J
| addressee affiliation = NORTHEAST NUCLEAR ENERGY CO.
| docket = 05000245, 05000336
| license number =
| contact person =
| document report number = NUDOCS 8610100731
| package number = ML20210V568
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 2
}}
See also: [[see also::IR 05000254/1986017]]
 
=Text=
{{#Wiki_filter:T.'    .
      .
    ,
    .
                                            no.T011995
          Docket Nos. 50-245; 50-336
          Northeast Nuclear Energy Company
          ATTN: Mr. John F. Opeka
                  Senior Vice President-Nuclear
                  Engineering and Operations Group
          Post Office Box 270
          Hartford, Connecticut 06141-0270
          Gentlemen:
          Subject:    Routine Inspection 50-245/86-17; 50-336/86-19 (8/18/86-9/29/86)
          This refers to the above subject resident inspection of Millstone 1 and 2.  The
          inspection findings have been discussed with Mr. Romberg of your staff.
          No violations were identified and no reply to this letter is required.
          Your cooperation with us is appreciated.
                                                    Sincerely,
                                                            Rh S4aed Sri
                                                            /AY        -
                                                    Edward C. Wenz nger, Chief
                                                    Projects Branch No. 3
                                                    Division of Reactor Projects
          Enclosure:    NRC Region I Report 50-245/86-17; 50-336/86-19
          cc w/ encl:
          E. J. Mroczka, Vice President, Nuclear Operations
          W. D. Romberg, Station Superintendent
          D. O. Nordquist, Manager of Quality Assurance
          R. T. Laudenat, Manager, Generation Facilities Licensing
          Gerald Garfield, Esquire
          Public Document Room (PDR)
          Local Public Document Room (LPDR)
          Nuclear Safety Information Center (NSIC)
          NRC Resident Inspector
          State of Connecticut
.
                                          8610100731 861001
                                          PDR  ADOCK 05000245
                                          G                PDR                        g(
                                                                                      -/
 
    *
  e,
  .
      Northeast Nuclear Energy Company          2
                                                          OCT 011986
      bec w/ encl:
      Region I Docket Room (with concurrences)
      Management Assistant, DRMA (w/o encl)
      DRP Section Chief
      M. McBride, RI, Pilgrim
      P Swetland, SRI, Haddam~ Neck
      J. T. Shedlosky, SRI, Millstone 3
      J. Shea, LPM, NRR
      Robert J. Bores, DRSS
I
      RI:DRP          RI:DRP        RI:DRP
          OY
      Grant /meo
                          0
                      McCabe
                                          AQ
                                          zRger
      9/29/86          ts\\
f
        ob
                                    0FFICIAL RECORD COPY
}}

Latest revision as of 05:06, 19 December 2021

Forwards Insp Repts 50-254/86-17 & 50-336/86-19 on 860818- 0929.No Violation Noted
ML20210V562
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 10/01/1986
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20210V568 List:
References
NUDOCS 8610100731
Download: ML20210V562 (2)


See also: IR 05000254/1986017

Text

T.' .

.

,

.

no.T011995

Docket Nos. 50-245; 50-336

Northeast Nuclear Energy Company

ATTN: Mr. John F. Opeka

Senior Vice President-Nuclear

Engineering and Operations Group

Post Office Box 270

Hartford, Connecticut 06141-0270

Gentlemen:

Subject: Routine Inspection 50-245/86-17; 50-336/86-19 (8/18/86-9/29/86)

This refers to the above subject resident inspection of Millstone 1 and 2. The

inspection findings have been discussed with Mr. Romberg of your staff.

No violations were identified and no reply to this letter is required.

Your cooperation with us is appreciated.

Sincerely,

Rh S4aed Sri

/AY -

Edward C. Wenz nger, Chief

Projects Branch No. 3

Division of Reactor Projects

Enclosure: NRC Region I Report 50-245/86-17; 50-336/86-19

cc w/ encl:

E. J. Mroczka, Vice President, Nuclear Operations

W. D. Romberg, Station Superintendent

D. O. Nordquist, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

Gerald Garfield, Esquire

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut

.

8610100731 861001

PDR ADOCK 05000245

G PDR g(

-/

e,

.

Northeast Nuclear Energy Company 2

OCT 011986

bec w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

DRP Section Chief

M. McBride, RI, Pilgrim

P Swetland, SRI, Haddam~ Neck

J. T. Shedlosky, SRI, Millstone 3

J. Shea, LPM, NRR

Robert J. Bores, DRSS

I

RI:DRP RI:DRP RI:DRP

OY

Grant /meo

0

McCabe

AQ

zRger

9/29/86 ts\\

f

ob

0FFICIAL RECORD COPY