o      '                  June 20, 1988 Docket Nos. 50-259/260/296 APPLICANT: Tennessee Valley Authority FACILITY:      Browns Ferry Nuclear Plant, Units 1, 2 and 3
 
==SUBJECT:==
 
==SUMMARY==
OF MEETING HELD ON MAY 18, 1988 - SEISMIC QUALIFICATION (CORRECTION)
In the above meeting sumary dated June 9,19S8, the attached page was inadvertently omitted. The omitted page is the first page of Enclosure 2 and should follow the list of attendees (Enclosure 1) in the treeting sunrary.
Original Signed by
                                        ' Janet L. Kelly, Project Engineer TVA Projects Civision                    '
Office of Special Projects
 
==Attachment:==
 
As stated, cc w/ attachment:                                                            ,
See next page Distribution Dockct File NRC PDR Local PDR Those on Attached List                                                        ,
i h          34 880620 P      [DOCM05000259  PDR OSP:TVA/LA        OSb    /Pli MSims h{      '
JKelly:as 6/JQ/88            6/$/88 e
 
  '                                                                                                                          Ei :losure 2
                .        e REVIEW COMMENTS ON BFN INTERIM CRITERIA FOR SEISMI._ CDESIGN PROGRAM (DISCUSSIONTOPICSFORMAY 18, 1988 MEETIFS)                                                                        l I. Drywell Steel Platforms
 
==References:==
: 1. Letter from R. Gridley (TVA) to NRC, "BFN - Seismic Qualification of Drywell Steel," dated March 10, 1988.
: 2. Letter from R. Gridley (TVA) to NRC, "BFN - Seismic Qualification of Drywell Steel - (NRC TAC No. 00302)," dated April 28, 1988.                                                                          l A. Enclosure 1 and Table 1 of Enclosure 1:
: 1.            3rd sentence of Item 2 under Resolution Section - How were these                                                  ' j loads generated and applied to the platferm model?                                                                  -
: 2.            Items 3, 5 and 6 under Resolution Section - If modifications                                                        .
are needed as a result of evaluation, why are the interim operability criteria instead of long tenn criteria for design criteria) to be used for the design of modifications.
: 3.            Licensing Issue - Provide basis for changing the factor "1.6" to "1.7" (References 1 and 2).
: 4.            Item 3 of "Justification" -
(i) HRC NUREG-0800, "Standard Review Plan," was issued after                                                          1 BFN was licensed.                    It is the staff's position that this                                i document should be used as a whole package instead of piece                                              l by piece.                                                                                                i (ii) The staff treated the Mark I Torus Long Term Integrity Program as a case by case evaluation.                                              T refore, the        ,
criteria accepted under this program a                                                  pplicable for    '
other evaluation, e.g., BFN Seismic Design Program.
: 5.            Table 1 -
(i) The allowable stresses for steel and weld are given as a range because of the use of "up to." Specific allowable stresses should be explicitly defined for each of different load cembinations to be considered in the re-start evaluation.
(ii) The "Similar to" in the temark for the concrete anchor criteria is unspecified and should be clearly defined.
(iii)What are the allowables for steel members under t w pression and bending.
(iv) What are the allowable tension and shear stressss for bolts.
C' . b.S? v )g
 
l' Browns Ferry Nuclear Plant Units 1, 2, and 3 cc:
General Counsel                          Regional Administrator, Region II Tennessee Valley Authority              U.S. Nuclear Regulatory Commission 400 West Summit Hill Drive              101 Marietta Street, N.W.
E11 B33.                                Atlanta, Georgia 30323 Knoxville, Tennessee 37902 Resident Inspector /Brcwns Ferry NP        l Mr. R. L. Gridley                        U.S. Nuclear Regulatory Commission        1 Tennessee Valley Authority              Route 12, Box 637 -
SN 157B Lookout Place                    Athens, Alabama 35611 Chattanooga, Tennessee 37402-2801 Mr. Richard King                          1 Mr. H. P. Pomrehn                        c/o U.S. GA0 Tennessee Valley Authority              1111 North Shore Drive                    l l
Browns Ferry Nuclear Plant              Suite 225, Box 194 P.O. Box 2000                            Knoxville, Tennessee 37919 Decatur, Alabama 35602 Dr. Henry Myers, Science Advisor Mr. M. J. May                            Connittee on Interior Tennessee Valley Authority                and Insular Affairs Browns Ferry Nuclear Plant              U.S. House of Representatives P.O. Box 2000                            Washington, D.C. 20515 Decatur, Alabama 35602 Mr. D. L. Williams                      Mr. S. A. White Tennessee Valley Authority              Manager of Nuclear Power 400 West Summit Hill Drive              Tennessee Valley Authority W10 885                                  6N 38A lookout Place Knoxville, Tennessee 37902              1101 Market Street Chattanooga, Tennessee 37402-2801 Chairman, Limestone County Commission P.O. Box 188 Athens, Alabama 35611 Claude Earl Fox, M.D.
State Health Officer State Department of Public Health State Office Building Montgomery, Alabama 36130
 
t
          .    <                                              1 i
DISTRIBUTION FOR MEETING
 
==SUMMARY==
DATED:    June 20, 1988 Facility: Browns Ferry Nuclear Plant, Units 1. 2 and 3*
  -Docket File NRC PDR Local PDR                                                    l Projects' Reading S. Ebneter J. Partlow J. Axelrad S. Richardson                                              -
S. Black                                                      l B. D. Liaw                                                    I J. Kelly G. Gears
: 0. Moran M. Sims F. McCoy                                                      ;
J. Rutberg                                                    l T. Cheng T. Tsai ACRS(10)
CPA/PA GPA/CA (M. Callahan) (5)
F. Miraglia
: 2. Jordan P. Gwynn                                                      l J. Scarborough                                                !
G. Marcus C. Miller T. Elsasser C. Ader TVA-Rockville BFN Rdg. File
  *cc:  Licensee / Applicant & Service List 1
i
__}}

Latest revision as of 12:27, 13 November 2020

Forwards Page Inadvertently Omitted from Summary of 880609 Meeting Re Seismic Qualification
ML20196A033
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 06/20/1988
From: Joseph Kelly
NRC OFFICE OF SPECIAL PROJECTS
To:
TENNESSEE VALLEY AUTHORITY
References
NUDOCS 8806290434
Download: ML20196A033 (4)


Text

.

o ' June 20, 1988 Docket Nos. 50-259/260/296 APPLICANT: Tennessee Valley Authority FACILITY: Browns Ferry Nuclear Plant, Units 1, 2 and 3

SUBJECT:

SUMMARY

OF MEETING HELD ON MAY 18, 1988 - SEISMIC QUALIFICATION (CORRECTION)

In the above meeting sumary dated June 9,19S8, the attached page was inadvertently omitted. The omitted page is the first page of Enclosure 2 and should follow the list of attendees (Enclosure 1) in the treeting sunrary.

Original Signed by

' Janet L. Kelly, Project Engineer TVA Projects Civision '

Office of Special Projects

Attachment:

As stated, cc w/ attachment: ,

See next page Distribution Dockct File NRC PDR Local PDR Those on Attached List ,

i h 34 880620 P [DOCM05000259 PDR OSP:TVA/LA OSb /Pli MSims h{ '

JKelly:as 6/JQ/88 6/$/88 e

' Ei :losure 2

. e REVIEW COMMENTS ON BFN INTERIM CRITERIA FOR SEISMI._ CDESIGN PROGRAM (DISCUSSIONTOPICSFORMAY 18, 1988 MEETIFS) l I. Drywell Steel Platforms

References:

1. Letter from R. Gridley (TVA) to NRC, "BFN - Seismic Qualification of Drywell Steel," dated March 10, 1988.
2. Letter from R. Gridley (TVA) to NRC, "BFN - Seismic Qualification of Drywell Steel - (NRC TAC No. 00302)," dated April 28, 1988. l A. Enclosure 1 and Table 1 of Enclosure 1:
1. 3rd sentence of Item 2 under Resolution Section - How were these ' j loads generated and applied to the platferm model? -
2. Items 3, 5 and 6 under Resolution Section - If modifications .

are needed as a result of evaluation, why are the interim operability criteria instead of long tenn criteria for design criteria) to be used for the design of modifications.

3. Licensing Issue - Provide basis for changing the factor "1.6" to "1.7" (References 1 and 2).
4. Item 3 of "Justification" -

(i) HRC NUREG-0800, "Standard Review Plan," was issued after 1 BFN was licensed. It is the staff's position that this i document should be used as a whole package instead of piece l by piece. i (ii) The staff treated the Mark I Torus Long Term Integrity Program as a case by case evaluation. T refore, the ,

criteria accepted under this program a pplicable for '

other evaluation, e.g., BFN Seismic Design Program.

5. Table 1 -

(i) The allowable stresses for steel and weld are given as a range because of the use of "up to." Specific allowable stresses should be explicitly defined for each of different load cembinations to be considered in the re-start evaluation.

(ii) The "Similar to" in the temark for the concrete anchor criteria is unspecified and should be clearly defined.

(iii)What are the allowables for steel members under t w pression and bending.

(iv) What are the allowable tension and shear stressss for bolts.

C' . b.S? v )g

l' Browns Ferry Nuclear Plant Units 1, 2, and 3 cc:

General Counsel Regional Administrator, Region II Tennessee Valley Authority U.S. Nuclear Regulatory Commission 400 West Summit Hill Drive 101 Marietta Street, N.W.

E11 B33. Atlanta, Georgia 30323 Knoxville, Tennessee 37902 Resident Inspector /Brcwns Ferry NP l Mr. R. L. Gridley U.S. Nuclear Regulatory Commission 1 Tennessee Valley Authority Route 12, Box 637 -

SN 157B Lookout Place Athens, Alabama 35611 Chattanooga, Tennessee 37402-2801 Mr. Richard King 1 Mr. H. P. Pomrehn c/o U.S. GA0 Tennessee Valley Authority 1111 North Shore Drive l l

Browns Ferry Nuclear Plant Suite 225, Box 194 P.O. Box 2000 Knoxville, Tennessee 37919 Decatur, Alabama 35602 Dr. Henry Myers, Science Advisor Mr. M. J. May Connittee on Interior Tennessee Valley Authority and Insular Affairs Browns Ferry Nuclear Plant U.S. House of Representatives P.O. Box 2000 Washington, D.C. 20515 Decatur, Alabama 35602 Mr. D. L. Williams Mr. S. A. White Tennessee Valley Authority Manager of Nuclear Power 400 West Summit Hill Drive Tennessee Valley Authority W10 885 6N 38A lookout Place Knoxville, Tennessee 37902 1101 Market Street Chattanooga, Tennessee 37402-2801 Chairman, Limestone County Commission P.O. Box 188 Athens, Alabama 35611 Claude Earl Fox, M.D.

State Health Officer State Department of Public Health State Office Building Montgomery, Alabama 36130

t

. < 1 i

DISTRIBUTION FOR MEETING

SUMMARY

DATED: June 20, 1988 Facility: Browns Ferry Nuclear Plant, Units 1. 2 and 3*

-Docket File NRC PDR Local PDR l Projects' Reading S. Ebneter J. Partlow J. Axelrad S. Richardson -

S. Black l B. D. Liaw I J. Kelly G. Gears

0. Moran M. Sims F. McCoy  ;

J. Rutberg l T. Cheng T. Tsai ACRS(10)

CPA/PA GPA/CA (M. Callahan) (5)

F. Miraglia

2. Jordan P. Gwynn l J. Scarborough  !

G. Marcus C. Miller T. Elsasser C. Ader TVA-Rockville BFN Rdg. File

  • cc: Licensee / Applicant & Service List 1

i

__