MONTHYEARML18039A9021999-10-15015 October 1999 Forwards LER 99-010-00 Re Occurrence of Plant Reactor Scram Due to Main Turbine Trip Which Resulted in Main Steam Moisture Separator.All Plant Safety Systems Operated as Designed in Response to Event ML20217E0711999-10-14014 October 1999 Grants Approval for Util to Submit Original,One Signed Paper Copy & Six CD-ROM Copies of Updates to FSAR as Listed,Per 10CFR50.4(c),in Response to ML18039A8961999-10-14014 October 1999 Forwards LER 99-009-00,re Manual Reactor Scram on Unit 2 from 54% Power,Iaw 10CFR50.73(a)(2)(iv).All Plant Safety Sys Operated as Designed in Response to Event ML20217D3261999-10-0808 October 1999 Responds to Re Event Concerning Spent Fuel Pool Water Temperature Being Undetected for Approx Two Days at Browns Ferry Unit 3 ML20217F7751999-10-0808 October 1999 Confirms 991006 Telcon Between T Abney of Licensee Staff & a Belisle of NRC Re Meeting to Be Conducted on 991109 in Atlanta,Ga to Discuss Various Maintenance Issues ML18039A8931999-10-0808 October 1999 Forwards LER 99-008-00,concerning HPCI Sys Being Declared Inoperable,Iaw 10CFR50.73(a)(2)(v).There Are No Commitments Contained in Ltr ML18039A8881999-10-0808 October 1999 Provides Licensee Supplemental Response to NRC 980713 RAI Re GL 87-02,Suppl 1, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors. ML20217B5481999-10-0101 October 1999 Requests Exception to 10CFR50.4(c) Requirement to Provide Total of Twelve Paper Copies When Submitting Revs to BFN UFSAR ML20212M1481999-09-28028 September 1999 Refers to Management Meeting Conducted on 990927 at Region II for Presentation of Recent Plant Performance.List of Attendees & Copy of Presentation Handout Encl ML20212F7751999-09-22022 September 1999 Requests Operator & Senior Operator License Renewals for Listed Individuals and Licenses ML20212D3651999-09-20020 September 1999 Forwards SE Accepting Licensee 990430 Proposed Rev to Plant, Unit 3 Matl Surveillance Program ML18039A8721999-09-10010 September 1999 Informs of Licensee Decision to Withdraw Proposed Plant risk-informed Inservice Insp Program,Originally Transmitted in Util 981023 Ltr.Licensee Expects to Resubmit Revised Program within Approx 6 Wks ML20211Q5731999-09-0909 September 1999 Submits Response to Administrative Ltr 99-03 Re Preparation & Scheduling of Operator Licensing Exams.Completed NRC Form 536,operator Licensing Exam Data,Which Provides Plant Current Schedules for Specific Info Requested Encl ML20211G6491999-08-26026 August 1999 Confirms Telcon with T Abney on 990824 Re Mgt Meeting Which Has Been re-scheduled from 990830-0927.Purpose of Meeting to Discuss BFN Status & Performance ML20210Q6931999-08-0909 August 1999 Forwards Updated Changes to Distribution Lists for Browns Ferry & Bellefonte Nuclear Plants ML18039A8371999-08-0606 August 1999 Forwards BFN Unit 2 Cycle 10 ASME Section XI NIS-1 & NIS-2 Data Repts, for NRC Review.Corrected Inservice Insp Summary Rept for Unit 3 Cycle 8 Operation,Included in Rept ML20210Q4421999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006. Authorized Representative of Facility Must Submit Ltr with List of Individuals to Take exam,30 Days Before Exam Date ML20210N1051999-08-0202 August 1999 Forwards SE Accepting Licensee 990326 Request for Relief from ASME B&PV Code,Section XI Requirements.Request for Relief 3-ISI-7,pertains to Second 10-year Interval ISI for Plant,Unit 3 ML20210G8991999-07-28028 July 1999 Discusses 990726 Open Mgt Meeting for Discussion on Plant Engineering Status & Performance.List of Attendees & Presentation Handout Encl ML18039A8181999-07-26026 July 1999 Forwards LER 99-004-00 Re Inoperability of Two Divisions of Plant CSS Due to Personnel Error During Surveillance Testing.Event Reported Per 10CFR50.73(a)(2)(i)(B) ML20210G8051999-07-22022 July 1999 Discusses DOL Case DC Smith Vs TVA Investigation.Oi Concluded That There Was Not Sufficient Evidence Developed During Investigation to Substantiate Discrimination.Nrc Providing Results of OI Investigation to Parties ML20210F3031999-07-22022 July 1999 Submits Rept Re Impact of Changes or Errors in Methodology Used to Demonstrate Compliance with ECCS Requirements of 10CFR50.46.One Reportable non-significant Error Was Found During Time Period of 980601-990630 ML20209J0251999-07-16016 July 1999 Forwards SE Which Constitutes Staff Review & Approval of TVA Ampacity Derating Test & Analyses for Thermo-Lag Fire Barrier Configurations as Required in App K of Draft Temporary Instruction, Fpfi, ML20210B2671999-07-14014 July 1999 Confirms 990702 Telcon Between T Abney of Licensee Staff & Author Re Mgt Meeting Scheduled for 990830 at Licensee Request in Atlanta,Ga to Discuss Browns Ferry Nuclear Plant Status & Performance ML20209E3421999-07-0707 July 1999 Confirms Arrangements Made During 990628 Telephone Conversation to Hold Meeting on 990726 in Atlanta,Ga to Discuss Plant Engineering Status & Performance ML20209E5511999-07-0707 July 1999 Informs That as Result of NRC Review of Util Responses to GL 92-01,rev 1 & Suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2.This Closes TACs MA1180,MA1181 & MA1179 ML20196J3531999-06-30030 June 1999 Responds to Re Boeing Rocket Booster Mfg Facility Being Constructed in Decatur,Al.Nrc Has No Unique Emergency Planning Concerns Re Proximity of Boeing Facility to BFN ML20196G9111999-06-28028 June 1999 Discusses Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits ML18039A8081999-06-28028 June 1999 Forwards LER 99-004-00 Re Esfas That Occurred When RPS Motor Generator Tripped.Rept Is Submitted IAW Provisions of 10CFR50.73(a)(2)(iv) as Event of Condition That Resulted in Automatic Actuation of ESF ML18039A8111999-06-25025 June 1999 Requests Permanent Relief from Inservice Insp Requirements of 10CFR50.55a(g) for Volumetric Exam of Bfn,Unit 3 Circumferential RPV Welds,Per GL 98-05 ML20196F8741999-06-23023 June 1999 Forwards Safety Evaluation Accepting Util Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20196F8131999-06-22022 June 1999 Forwards Rev 24 to Security Personnel Training & Qualification Plan,Per 10CFR50.54(p).Rev Withheld ML18039A8051999-06-22022 June 1999 Forwards LER 99-003-00,re Automatic Reactor Scram Due to Turbine Trip.Rept Numbered 99-001 Should Be Deleted & Replaced with Encl Rept as Result of Error Noted in 990614 Rept ML18039A8031999-06-18018 June 1999 Responds to NRC Staff Verbal Request Re TS Change TS-376, Originally Submitted on 970312, & Proposed Changes to TS to Extend Current 7-day AOT for EDGs to 14 Days ML18039A7931999-06-0101 June 1999 Provides Summary of Major Activities Performed at BFN During Scheduled Unit 2 Cycle 10 Refueling Outage ML20195D3321999-06-0101 June 1999 Informs That Cb Fisher,License OP-5525-4,can No Longer Maintain License at Plant Because of Physical Condition That Causes Licensee to Fail to Meet Requirements of 10CFR55.21 ML18039A7911999-05-24024 May 1999 Informs That by Meeting Test Criteria Established by Test Based on Ansi/Ans 3.5-1985 (License Amends 254 & 214) power- Uprate Simulation Acceptable for Operator Training ML18039A7891999-05-24024 May 1999 Informs That Oscillation Power Range Monitor Module Has Been Enabled for Current Cycle of Operation Following Unit 2 Cycle 10 Refueling Outage Which Was Completed on 990509 ML20195B9361999-05-24024 May 1999 Informs That Do Elkins,License SOP-3392-6,no Longer Needs to Maintain License as Position Does Not Require License ML20206U6551999-05-14014 May 1999 Informs That ML Meek & Wd Dawson Will No Longer Need to Maintain SRO Licenses at Plant,Due to Termination of Employment,Effective 990521 ML20206Q8421999-05-10010 May 1999 Forwards Medical Info on DM Olive,License SOP-20540-2,in Response to NRC 990428 Telcon.Encl Withheld from Public Disclosure IAW 10CFR2.790(a)(6) ML18039A7771999-05-0606 May 1999 Forwards LER 99-003-00,providing Details Re Plant HPCI Sys Being Declared Inoperable Due to Loose Electrical Connection.Ltr Contains No Commitments ML20206G6611999-05-0404 May 1999 Forwards SE Accepting GL 88-20,submitted by TVA Re multi-unit Probabilistic Risk Assessement (Mupra) for Plant, Units 1,2 & 3 ML18039A7741999-04-30030 April 1999 Forwards Proposed Rev to BFN Unit 3 RPV Matl Surveillance Program,For NRC Approval ML20206H5901999-04-30030 April 1999 Forwards Notification of Revs to BFN Unit 2 Emergency Response Data Sys Data Point Library.Revs Were Implemented on 990413 DD-99-06, Informs That Time Provided by NRC within Which Commission May Act to Review Director'S Decision (DD-99-06) Has Expired.Decision Became Final Agency Action on 990423.With Certificate of Svc.Served on 9904281999-04-28028 April 1999 Informs That Time Provided by NRC within Which Commission May Act to Review Director'S Decision (DD-99-06) Has Expired.Decision Became Final Agency Action on 990423.With Certificate of Svc.Served on 990428 ML18039A7681999-04-27027 April 1999 Requests Relief from Specified Inservice Insp Requirements in Section XI of ASME Boiler & Pressure Vessel Code,Per 10CFR50.55a(a)(3)(i).Relief Requests 2-ISI-8 & 3-ISI-8,encl for NRC Review & Approval ML18039A7591999-04-27027 April 1999 Forwards Annual Radiological Environ Operating Rept Browns Ferry Nuclear Plant 1998. Rept Includes Results of Land Use Censuses,Summarized & Tabulated Results of Radiological Environ Samples in Format of Reg Guide 4.8 & NUREG-1302 ML18039A7651999-04-27027 April 1999 Forwards Rev 0 to TVA-COLR-BF2C11, Browns Ferry Nuclear Plant Unit 2,Cycle 11 Colr. ML18039A7541999-04-23023 April 1999 Requests Approval of Bfnp Unit 3 Risk-Informed ISI (RI-ISI) Program,Per 10CFR50.55(a)(3)(i) & GL 88-01.Encl RI-ISI Program Is Alternative to Current ASME Section XI ISI Requirments for Code Class 1,2 & 3 Piping 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18039A9021999-10-15015 October 1999 Forwards LER 99-010-00 Re Occurrence of Plant Reactor Scram Due to Main Turbine Trip Which Resulted in Main Steam Moisture Separator.All Plant Safety Systems Operated as Designed in Response to Event ML18039A8961999-10-14014 October 1999 Forwards LER 99-009-00,re Manual Reactor Scram on Unit 2 from 54% Power,Iaw 10CFR50.73(a)(2)(iv).All Plant Safety Sys Operated as Designed in Response to Event ML18039A8881999-10-0808 October 1999 Provides Licensee Supplemental Response to NRC 980713 RAI Re GL 87-02,Suppl 1, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors. ML18039A8931999-10-0808 October 1999 Forwards LER 99-008-00,concerning HPCI Sys Being Declared Inoperable,Iaw 10CFR50.73(a)(2)(v).There Are No Commitments Contained in Ltr ML20217B5481999-10-0101 October 1999 Requests Exception to 10CFR50.4(c) Requirement to Provide Total of Twelve Paper Copies When Submitting Revs to BFN UFSAR ML20212F7751999-09-22022 September 1999 Requests Operator & Senior Operator License Renewals for Listed Individuals and Licenses ML18039A8721999-09-10010 September 1999 Informs of Licensee Decision to Withdraw Proposed Plant risk-informed Inservice Insp Program,Originally Transmitted in Util 981023 Ltr.Licensee Expects to Resubmit Revised Program within Approx 6 Wks ML20211Q5731999-09-0909 September 1999 Submits Response to Administrative Ltr 99-03 Re Preparation & Scheduling of Operator Licensing Exams.Completed NRC Form 536,operator Licensing Exam Data,Which Provides Plant Current Schedules for Specific Info Requested Encl ML20210Q6931999-08-0909 August 1999 Forwards Updated Changes to Distribution Lists for Browns Ferry & Bellefonte Nuclear Plants ML18039A8371999-08-0606 August 1999 Forwards BFN Unit 2 Cycle 10 ASME Section XI NIS-1 & NIS-2 Data Repts, for NRC Review.Corrected Inservice Insp Summary Rept for Unit 3 Cycle 8 Operation,Included in Rept ML18039A8181999-07-26026 July 1999 Forwards LER 99-004-00 Re Inoperability of Two Divisions of Plant CSS Due to Personnel Error During Surveillance Testing.Event Reported Per 10CFR50.73(a)(2)(i)(B) ML20210F3031999-07-22022 July 1999 Submits Rept Re Impact of Changes or Errors in Methodology Used to Demonstrate Compliance with ECCS Requirements of 10CFR50.46.One Reportable non-significant Error Was Found During Time Period of 980601-990630 ML18039A8081999-06-28028 June 1999 Forwards LER 99-004-00 Re Esfas That Occurred When RPS Motor Generator Tripped.Rept Is Submitted IAW Provisions of 10CFR50.73(a)(2)(iv) as Event of Condition That Resulted in Automatic Actuation of ESF ML18039A8111999-06-25025 June 1999 Requests Permanent Relief from Inservice Insp Requirements of 10CFR50.55a(g) for Volumetric Exam of Bfn,Unit 3 Circumferential RPV Welds,Per GL 98-05 ML20196F8131999-06-22022 June 1999 Forwards Rev 24 to Security Personnel Training & Qualification Plan,Per 10CFR50.54(p).Rev Withheld ML18039A8051999-06-22022 June 1999 Forwards LER 99-003-00,re Automatic Reactor Scram Due to Turbine Trip.Rept Numbered 99-001 Should Be Deleted & Replaced with Encl Rept as Result of Error Noted in 990614 Rept ML18039A8031999-06-18018 June 1999 Responds to NRC Staff Verbal Request Re TS Change TS-376, Originally Submitted on 970312, & Proposed Changes to TS to Extend Current 7-day AOT for EDGs to 14 Days ML18039A7931999-06-0101 June 1999 Provides Summary of Major Activities Performed at BFN During Scheduled Unit 2 Cycle 10 Refueling Outage ML20195D3321999-06-0101 June 1999 Informs That Cb Fisher,License OP-5525-4,can No Longer Maintain License at Plant Because of Physical Condition That Causes Licensee to Fail to Meet Requirements of 10CFR55.21 ML20195B9361999-05-24024 May 1999 Informs That Do Elkins,License SOP-3392-6,no Longer Needs to Maintain License as Position Does Not Require License ML18039A7911999-05-24024 May 1999 Informs That by Meeting Test Criteria Established by Test Based on Ansi/Ans 3.5-1985 (License Amends 254 & 214) power- Uprate Simulation Acceptable for Operator Training ML18039A7891999-05-24024 May 1999 Informs That Oscillation Power Range Monitor Module Has Been Enabled for Current Cycle of Operation Following Unit 2 Cycle 10 Refueling Outage Which Was Completed on 990509 ML20206U6551999-05-14014 May 1999 Informs That ML Meek & Wd Dawson Will No Longer Need to Maintain SRO Licenses at Plant,Due to Termination of Employment,Effective 990521 ML20206Q8421999-05-10010 May 1999 Forwards Medical Info on DM Olive,License SOP-20540-2,in Response to NRC 990428 Telcon.Encl Withheld from Public Disclosure IAW 10CFR2.790(a)(6) ML18039A7771999-05-0606 May 1999 Forwards LER 99-003-00,providing Details Re Plant HPCI Sys Being Declared Inoperable Due to Loose Electrical Connection.Ltr Contains No Commitments ML20206H5901999-04-30030 April 1999 Forwards Notification of Revs to BFN Unit 2 Emergency Response Data Sys Data Point Library.Revs Were Implemented on 990413 ML18039A7741999-04-30030 April 1999 Forwards Proposed Rev to BFN Unit 3 RPV Matl Surveillance Program,For NRC Approval ML18039A7681999-04-27027 April 1999 Requests Relief from Specified Inservice Insp Requirements in Section XI of ASME Boiler & Pressure Vessel Code,Per 10CFR50.55a(a)(3)(i).Relief Requests 2-ISI-8 & 3-ISI-8,encl for NRC Review & Approval ML18039A7591999-04-27027 April 1999 Forwards Annual Radiological Environ Operating Rept Browns Ferry Nuclear Plant 1998. Rept Includes Results of Land Use Censuses,Summarized & Tabulated Results of Radiological Environ Samples in Format of Reg Guide 4.8 & NUREG-1302 ML18039A7651999-04-27027 April 1999 Forwards Rev 0 to TVA-COLR-BF2C11, Browns Ferry Nuclear Plant Unit 2,Cycle 11 Colr. ML20206C8591999-04-23023 April 1999 Informs That Util Has Determined,Dr Bateman No Longer Needs to Maintain His License,Effective 990331,per Requirement of 10CFR55.55(a) ML18039A7541999-04-23023 April 1999 Requests Approval of Bfnp Unit 3 Risk-Informed ISI (RI-ISI) Program,Per 10CFR50.55(a)(3)(i) & GL 88-01.Encl RI-ISI Program Is Alternative to Current ASME Section XI ISI Requirments for Code Class 1,2 & 3 Piping ML18039A7581999-04-23023 April 1999 Responds to Item 4 of 981117 RAI Re TS Change Request 376 Re Extended EDG Allowed Outage Time,In Manner Consistent with Rgs 1.174 & 1.177 ML20206C1241999-04-21021 April 1999 Forwards Annual Occupational Radiation Exposure Rept for 1998, IAW TS Section 5.6.1.Rept Reflects Radiation Exposure Data as Tracked by Electronic Dosimeters on Radiation Work Permits ML20205T0971999-04-15015 April 1999 Submits Change in Medical Status for DM Olive in Accordance with 10CFR55.25,effective 990315.Encl Medical Info & Certification of Medical Exam,Considered by Util to Be of Personal Nature & to Be Withheld,Per 10CFR2.790(a)(6) ML18039A7441999-04-0707 April 1999 Forwards LER 99-001-00,providing Details Re Inoperability of Two Trains of Standby Gas Treatment Due to Breaker Trip on One Train in Conjunction with Planned Maint Activities on Other.Ltr Contains No New Commitments ML18039A7431999-03-30030 March 1999 Responds to NRC 990112 RAI Re BFN Program,Per GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Movs. ML18039A7421999-03-30030 March 1999 Provides Results of Analysis of Design Basis Loca,As Required by License Condition Re Plants Power Uprate Operating License Amends 254 & 214 ML18039A7411999-03-30030 March 1999 Provides Partial Response to NRC 981117 RAI Re TS Change Request 376,proposing to Extend Current 7 Day AOT for EDG to 14 Days ML18039A7371999-03-26026 March 1999 Requests Relief from Specified ISI Requirements in Section XI of ASME Boiler & Pressure Vessel Code,1989 Edition.Encl Contains Request for Relief 3-ISI-7,for NRC Review & Approval ML18039A7331999-03-26026 March 1999 Forwards Rev 4 to TVA-COLR-BF2C10, Bnfp,Unit 2,Cycle 10 COLR, IAW Requirements of TS 5.6.5.d.COLR Was Revised to Extend Max Allowable Nodal Exposure for GE GE7B Fuel Bundles ML18039A7291999-03-22022 March 1999 Forwards Revised Epips,Including Index,Rev 26A to EPIP-1, Emergency Classification Procedure & Rev 26A to EPIP-5, General Emergency. Rev 26A Includes All Changes Made in Rev 26 as Well as Identified Errors ML20204G8471999-03-19019 March 1999 Reports Change in Medical Status for Ma Morrow,In Accordance with 10CFR55.25.Encl Medical Info & Certification of Medical Exam,Considered by Util to Be of Personal Nature & to Be Withheld from Pdr,Per 10CFR2.790(a)(6).Without Encl ML20207M0611999-03-11011 March 1999 Forwards Goals & Objectives for May 1999 for Browns Ferry Nuclear Plant,Units 1,2 & 3,radiological Emergency Plan Exercise.Plant Exercise Is Currently Scheduled for Wk of 990524 ML18039A6971999-02-22022 February 1999 Forwards Typed TS Pages,Reflecting NRC Approved TS Change 354 Requiring Oscillation PRM to Be Integrated Into Approved Power uprate,24-month Operating Cycle & Single Recirculation Loop Operation ML18039A6961999-02-19019 February 1999 Provides Util Response to GL 95-07 Re RCIC Sys Injection Valves (2/3-FCV-71-39) for BFN Units 2 & 3.Previous Responses,Dtd 951215,1016 & 960730,0315 & 0213,supplemented ML18039A6911999-02-19019 February 1999 Forwards Rev 3 to Unit 2 Cycle 10 & Rev 1 to Unit 3 Cycle 9, Colr.Colrs for Each Unit Were Revised to Include OLs Consistent with Single Recirculation Loop Operation ML20203B6031999-02-0404 February 1999 Requests Temporary Partial Exemption from Requirements of 10CFR50.65,maint Rule for Unit 1.Util Requesting Exemption to Resolve Issue Initially Raised in NRC Insp Repts 50-259/97-04,50-260/97-04 & 50-296/97-04,dtd 970521 ML18039A6741999-01-21021 January 1999 Responds to NRC 981209 Ltr Re Violations Noted in Insp Repts 50-259/98-07,50-260/98-07 & 50-296/98-07,respectively. Corrective Actions:Will Revise Procedure NEPD-8 Re Vendor Nonconformance Documentation Submission to TVA ML20199F6951999-01-0808 January 1999 Submits Request for Relief from ASME Section XI Inservice Testing Valve Program to Extend Interval Between Disassembly of Check Valve,Within Group of Four Similar Check Valves for EECW Dgs,From 18 to 24 Months 1999-09-09
[Table view] |
Text
REGULAT Y INFORMATION DISTRIBUTIO YSTEM (RIDS)
ACCESSION NBR:9906080102 DOC.DATE: 99/05/24 NOTARIZED: NO DOCKET ¹ FACIL:50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260
~
, 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee 05000296 AUTH. NAME . AUTHOR AFFILIATION ABNEY,T.E. Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Records ManageNhnt Branch (Document Control Desk)
SUBJECT:
Informs that by meeting test criteria established by this test based on ANSI/ANS 3.5-1985 (license amends 254 & 214) power uprate simulation was found to be acceptable for operator training.
DISTRIBUTION CODE: D030D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: TVA Facilities Routine Correspondence NOTES:
RECIPIENT COPIES RECIPIENT COPIES 0 ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL LPD2-2 LA 1 1 LPD2-2 PD 1 1 DEAGAZIO,A 1 1 INTERNAL: ACRS 1 1 FILE CENTER 0 1 1 OGC/HDS3 1 0 SSEB/SES 1 1 EXTERNAL: NOAC 1 1 NRC PDR 1 1 D
'E NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM OR REDUCE THE NUMBER OF COPZES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT DISTRIBUTION LISTS THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 8
4i ~ i Tennessee Valley Authority, Post Office Box 2000, Decatur. Alabama 36609 May 24, 1999 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
In the Matter of Docket Nos. 50-260 Tennessee Valley Authority 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) CLOSURE OF OPERATIONS TRAINING LICENSE CONDITION ASSOCIATED WITH UNITS 2 AND 3 POWER UPRATE OPERATING LICENSE AMENDMENTS 254 AND 214 (TAC NOS. M99711 AND M99712)
In a September 8, 1998 letter (Reference 1), NRC issued a license amendment to allow operation of BFN Units 2 and 3 at 3458 megawatts thermal power. As part of the amendment, NRC added the following license condition: "Classroom and simulator training on all power uprate related changes that affect operator performance will be conducted prior to operating at uprated conditions. Simulator changes that are consistent with power uprate conditions will be made and simulator fidelity will be validated in accordance with ANSI/ANS 3.5-1985. Training and the plant simulator will be modified, as necessary, to incorporate changes identified during startup testing."
990i0S010a e~om~
PDR ADQCK 05000260 P POR
1 U. S. Nuclear Regulatory Commission Page 2 May 24, 1999 By letter dated October 1, 1997 (Reference 2), TVA requested a license amendment to allow BFN to operate Units 2 and 3 at the uprated power level of 3458 megawatts thermal. In a March 30, 1998 letter (Reference 3), the staff requested additional information regarding the proposed power uprate license amendment. The letter stipulated that TVA propose a license condition and/or a commitment that certain aspects of operation training be completed prior to operating BFN at uprated conditions. These actions included the following:
(a) Provide classroom and simulator training on all changes that effect operator performance caused by the power uprate modification. All training and the plant simulator will be modified, as necessary, to incorporate changes identified during the startup testing program.
(b) Complete simulator changes that are consistent with ANSI/ANS 3.5-1985. Simulator fidelity will be re-validated in accordance with ANSI/ANS 3 '-1985, Section 5.4.1, "Simulator Performance Testing."
Simulator revalidation will include comparison of individual simulated systems and components and simulated integrated plant steady state and transient performance with reference plant responses using similar startup test procedures.
(c) Complete all control room and plant process computer system changes as a result of the power uprate.
(d) Modify operator training and the plant simulator, as required, to address all related issues and discrepancies that are identified during the startup testing program.
In letter dated April 28, 1998 (Reference 4), TVA provided the requested information. As part of that response TVA committed to complete the requested actions. By letter dated September 1, 1998 (Reference 5), TVA agreed to the previously stated operating. license condition. Accordingly, on September 8, 1998, the NRC issued the license condition as part of the power uprate license amendment.
This letter provides notification that the required training activities required for power uprate implementation have been completed.
0 Ol Ig C
U. S. Nuclear Regulatory Commission Page 3 May 24, 1999 Com leted Actions Prior to operator requalification. training, the training content .was revised to include power uprate parameters.
Engineering and design data was used to revise the training material. Classroom training which included uprated conditions, involved an overview of various aspects of the power uprate (i.e., operating parameter value changes, setpoints and scaling changes, procedure changes, system
.changes,,startup test plan, etc.).
Simulator training was conducted in conjunction with the classroom training. The scenarios utilized included, those that demonstrated changes in plant responses at uprated power including changes in time to achieve critical points for operator actions. The operators were required to respond to the transients using applicable plant procedures.
The BFN simulator was modified to support Unit 3 power uprate implementation. The power uprate modifications were implemented on the simulator using engineering and design analysis prior to installation in Unit 3. Since the simulator reference unit is Unit 2, the installation of power uprate based on Unit 3 design caused some differences between the simulator and its'eference unit. These differences were noted and discussed as part of the classroom training.
Prior to training on the simulator, an acceptance test consistent with American Nuclear Standards Institute/American Nuclear Society (ANSI/ANS) 3.5-1985, Appendix B.l.l, was run to bench mark the simulator performance. The thrust of the test was to ensure the simulator heat balance matched the engineering and design analysis data for 105 percent steady-
,state power. Satisfactory completion of each test was accomplished'ith no major problems identified, therefore, the power uprate simulation was determined to be acceptable for operator training.
During the startup of Unit 3, Operations Training Instructors observed control room operators as they transitioned from Mode 4 through Mode 1 to track Unit 3's plant response during the power uprate startup test program. Observations from Unit 3 startup were included in revised Unit 3 and Unit 2 Power Uprate Classroom Training Lesson Plans.
Following startup of Unit 3, actual plant data was collected and a comparison analysis that would identify any performance differences between Unit 3 and the simulator was run. A steady state test was performed on the .simulator that met the intent of ANSI/ANS 3.5-1985; Section 5.4.1. In that test,
U. S.. Nuclear Regulatory Commission Pa.ge 4 May 24, 1999 the simulator values were compared with actual plant reference data. The results indicated that-, the simulator displayed good agreement w'ith. Unit 3 plant data" and no major problems were identified. The results of the testing also assured that the design data used as the basis of the simulator power uprate changes, was. accurate when compared to actual Unit 3 plant data. By meeting the test criteria established by this test based on ANSI/ANS 3..5-1985, the
,power uprate simulation was found to be acceptable for opera'tor training.
There are no commitments made in this letter. If you have any questions, please telephone me at (256) 729-2636.
Si cerel T.
Manager o z.cens'ng and In ustry Aff irs
,cc: See age 6
t ~
U. S. Nuclear Regulatory Commission P@~e 5 May 24, 1999 RE FERENCE S 1.. NRC letter to TVA dated September 8, 1998, Issuance of Amendment Power Uprate Browns Ferry Plant, Units 2 and 3
- 2. TVA letter to NRC dated October 1, 1997, Browns Ferry Nuclear Plant (BFN) Units 2 and 3 Technical Specification (TS) Change TS-384 Request For License Amendment For Power Uprate Operation
- 3. NRC Letter -to TVA dated March 30,, 1998, Browns Ferry Plant, Units 2 and 3 .Request For Additional Information Regarding Technical Specification Change TS 384', Request For License Amendment For Power Uprate Operation (TAC NOS. 'M99711, M99712)
- 4. TVA letter to NRC dated April 28, 1998, Browns Ferry Nuclear Plant (BFN) Response to Request For Additional Information (RAI) Regarding Units 2 and 3 Techni;cal Specification (TS) Change TS 384, Response To The Request For Additional Information Relating To License Amendment For Power Uprate Operation (TAC NOS. M99711, M99712) 5.. TVA letter to NRC dated September 1, 1998, Browns Ferry Nuclear Plant (BFN) Units 2 and 3 Technical Specification (TS) NO. 384 Request For License Amendment For Power Uprate Operation, Proposed Operating License Conditions (TAC NOS. M99711, and M99712)
II U.. S. Nuclear Regulatory Commission.
Page 6 May 24, 1999
.cc: Mr. Albert W. De Agazio, Senior Project Manager U.S. Nuclear Regulatory Commission One White. Fl'int, North 11555 Rockville Pike Rockville, Maryland .20852-1 Mr. Paul E. Fredrickson, Branch Chi.'ef U.S. Nuclear Regulatory Commission Region II 61 Forsyth Street, S. W,.