Forwards Requalification Exam Rept 50-260/OL-89-01 Administered During Wks of 890710 & 17.Concerns Raised Re Operator Performance & Exam Administration
ML20247C948
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 09/01/1989
From: Wilson B
Office of Nuclear Reactor Regulation
To: Kingsley O
TENNESSEE VALLEY AUTHORITY
Shared Package
ML18033A946 List:
References
NUDOCS 8909140136
Download: ML20247C948 (3)


Text

_ _ _ _ __ _ _ _ _ ._.

September 1, 1989 Mr. Oliver D. Kingsley, Jr.

Senior Vice President, Nuclear Power Tennessee Valley Authority 1101 Market Street 6N 38A Lookout Place Chattanooga, TN 37402-2801

j.

Dear Mr. Kingsley:

i L

SUBJECT:

BROWNS FERRY REQUALIFICATION EXAMINATION REPORT 260/0L-89-01 l The NRC administered examinations during the weeks of July 10 and July 17, 1989, to employees of your company who currently hold licenses to operate the Browns Ferry Nuclear Plant. At the '.onclusion of the site visit, prelimirery findings were discussed with those members of your staff identified in tna Examination Report, Enclosure 1.

A table summarizing the examination results for each examined individual is provided in Enclosure 2. Comments made by your training staff concerning the accuracy of some of the answers to questions in the written examination are contained in Enclosure 3. Copies of the written examinations and answer keys are included in this report as Enclosure 4.

l A Requalification Program Evaluation is included as Enclosure 5. This Evaluation Report finds that the Browns Ferry Program continues to be unsatisfactory, based upon the performance of the licensed operators on this, and previously administered, examinations. A subsequent evaluation will be conducted prior to the restart of the Browns Ferry plant.

Your attention-is invited to information in the Requalification Evaluation Report which describes the NRC concerns over operator performance and exam administration. These concerns have been discussed with your training staff, both during the examination development process and during the observation visit conducted during the week of August 14, 1989. Any further questions concerning these matters can be addressed during the management meeting to be held at the Region II Offices in September.

A Simulation Facility Fidelity Report is provided in this report as Enclosure 6.

In accordance with 10 CFR 2.790(a), a copy of this letter and Enclosures 1, 3, 4, 5, and 6 will be placed in the NRC's Public Document Room. Enclosure 2 is l exempt from public disclosure pursuant to 10 CFR 2.790(a) and will not be sent to the Public Document Room.

8909140136 890901 PDR ADOCK 05000260 >

V FDC 1 rm

(

I' Mr. Oliver D. Kingsley, Jr. 2 September 1, 1989 Should you have any questions concerning this matter, please contact us.

Sincerely, (original signed by B. A. Wilson)

Bruce A. Wilson, Assistant Director for Inspection Programs Projects Division Office of Nuclear Reactor Regulation

Enclosures:

1. Examination Report No. 50-260/0L-89-01 2< . Requalification.Results Summary Sheet (Official Use Only - Privacy Act Information)
3. Facility Comments on Written Exam Items
4. R0/SR0 Examination and Answer Keys
5. Requalification Program Evaluation Report
6. Simulation Facility Fidelity Report cc w/ enc 1s 1, 2, 5, and 6:

G. Campbell, Plant Manager, Browns Ferry Nuclear Plant cc w/encls 1, 2, 3, 4, 5, and 6:

A. R. Champion, Operations Training Supervisor cc w/enci 1:

State of Alabama t________________. __ >

Mr. Oliver D. Kingsley, Jr. 3 September 1, 1989 bec w/encls 1, 3, 5, and 6:

W. S. Little, OSP

-D. C. Payne, DRS Browns Ferry Senior Resident Inspector bec w/encls;1, 5, and 6:

Operator Licensing Branch, NRR bec w/encls 1. 3, 4, 5, and 6:

Document Control Desk 1

1 i

RII RII RII RII RII rockman:btm f(P ne ) dsen les BWilson

/ 8/!o /89 j 8/fo/89 8/70/89 8/)/89 8/ /89 1