Informs of Licensee Decision to Withdraw Proposed Plant risk-informed Inservice Insp Program,Originally Transmitted in Util .Licensee Expects to Resubmit Revised Program within Approx 6 Wks
ML18039A872
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 09/10/1999
From: Abney T
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-88-01, TAC-MA3989, NUDOCS 9909200064
Download: ML18039A872 (6)


Text

REGULAR~ Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)

AC,'CESSION NBR:9909200064 DOC.DATE: 99/09/10 NOTARIZED: NO DOCKET ¹ FACIL:50-260.Browns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260

" ~.AUTH.NAME AUTHOR AFFILIATION ABNEY,T.E.

Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT:

Informs of licensee decision to withdraw proposed plant risk-informed inservice insp program, originally transmitted in 981023 util ltr.

DISTRIBUTION CODE:

A047D COPIES RECEIVED:LTR I

ENCL Q SIZE:

oL TITLE: OR Submittal: Inservice/Testing/Relief from ASME Code NOTES:

RECIPIENT

,ID CODE/NAME LPD2-2 LA COPIES LTTR ENCL RECIPIENT ID CODE/NAME LONG,W COPIES LTTR ENCL 0

INTERNAL: ACRS NUDOCS-ABSTRACT RES/DET/ERAB EXTERNAL: LITCO ANDERSON NRC PDR FILE CENTER 0

0 C RP RES/DET/MEB NOAC 1

1 D

'E NOTE TO ALL "RIDSE RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE..'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE'NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 o

TOTAL NUMBER OF COPIES REQUIRED:

LTTR ll ENCL QO+

Cl 0

Tennessee Valley Authority, Post Office Box 2000, Decatur, Afatmma 35609-2000 September 10, 1999 U. S'. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

In the Matter-of Tennessee Valley Authority Docket No. 50-260 BROWNS FERRY NUCLEAR PLANT (BFN)

UNIT 2 WITHDRAWAL OF THE UNIT 2 RISK INFORMED INSERVICE INSPECTION (RI-ISI)

PROGRAM (MA3989)

The purpose of this letter is to inform NRC of TVA's decision to withdraw the proposed BFN Unit 2 pilot RI-ISI program.

This program was transmitted to NRC by TVA's letter dated October 23, 1998.

The proposed program contains an alternative to the current American Society of Mechanical EngineersSection XI inservice inspection requirements for Code Class 1,

2, and 3 piping.

In addition, the proposed RI-ISI program contains an alternative to Generic Letter (GL) 88-01 augmented inspection requirements for intergranular stress corrosion and cracking (IGSCC) associated with Categories A through G welds.

Subsequent to the BFN Unit 2 RI-ISI program submittal, the Nuclear Energy Institute (NEI) issued industry guidance in February 1999 regarding the format for proposed RI-ISI programs.

TVA plans to resubmit a revised BFN Unit 2 RI-ISI program that contains augmented IGSCC inspections for Category A welds only and is formatted in accordance with the NEI guidance.

TVA expects to resubmit the revised program within approximately six weeks.

L eeomoooe4 eeoe<0 I

PDR ADOCK 05000260 PDR

4l o ~.

U.S. Nuclear Regulatory Commission Page 2

September 10, 1999 There are no commitments contained in this letter.

If you have any questions, please telephone me at (256) 729-2636.

ce T,.

E.

ney Manager of Li e sing and Indust y ffairs cc:

Mr. Micha T. Anderson INEL Research Center 2151 North Boulevard P.O.

Box 1625 Idaho Falls, Idaho 83415-2209 Mr. William -O. Long, Senior Project Manager U.ST Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr. Paul E. Fredrickson, Branch Chief U.S. Nuclear Regulatory Commission Region II 61 Forsyth Street, S.W.

Suite 23T85 Atlanta, Georgia 30303 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road

Athens, Alabama 35611