Informs That Listed Schedular Commitments Fulfill Requirements in Responding to Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment, Based on Review of Util
ML20246M476
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 05/09/1989
From: Black S
Office of Nuclear Reactor Regulation
To: Kingsley O
TENNESSEE VALLEY AUTHORITY
References
GL-88-14, TAC-71631, TAC-71632, TAC-71633, NUDOCS 8905190149
Download: ML20246M476 (4)


Text

-- . - - --. -.

b .

ff -

UNITED STATES ~

j"; Y g NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20666 fi

\.G* ..**-[:

I May 9, 1989

,f.a, a DocketNos.1EO-25k260/296-Mr. Oliver D. Kingsley, Jr.

Senior Vice President, Nuclear Power Tennessee Valley Authority 6N 38A Lookout Place

'1101 Market Street-Chattanooga, Tennessee 37402-2801

Dear Mr. Kingsley:

SUBJECT:

GENERIC LETTER'88 INSTRUMENT AIR SUPPLY SYSTEM PROBLEMS L

AFFECTINGSAFETY-RELATEDEQUIPMENT(TACNOS. 71631/71632/71633).-

On August 8,1988, the NRC staff issued NRC Generic Letter 88-14. " Instrument Air Supply System Problems Affecting Safety-Related Equipment." The letter requested licensees to review NUREG-1275, Volume 2 (" Operating Experience-

. Feedback Report - Air. Systems Problems"), and perform a design and

. operations verification of_ the instrument air system. The letter also requested that within 180 days of its receipt; licensees provide a written response that:-

1. Verified by test that actual instrument air quality is-consistent with the manufacturer's recommendations for individual components served.

2.' Verified that maintenance practices, emergency procedures, and training are adequate to ensure that safety-related equipment will function as intended on loss of instrument air.

3. Verified that the design of the entire instrument air system including air or other pneumatic accumulators is in accordance with its intended function, including verification by test that air-operated safety-related components will perform as expected in accordance with all design-basis events, including a loss cf the normal instrument air system. . This design. verification should include an analysis of current air-operated component failure positions to verify that they are correct-for assuring required safety functions.

In addition to the above, each licensee / applicant was requested to provide a discussion of their program for maintaining proper instrument air quality.

In a letter dated February 23, 1989, you responded to Generic Letter 88-14, describing the status of your verification of the above for the Browns. Ferry facility, as well as the implementation of a program for maintaining proper instrument air quality.

In order to satisfy the intent of the bulletin, you made the following schedular commitments to comply with the items listed above:

Off g5190j49g90509 r~ I P ADDCK 05000259 t: i PNU g

l 1

.- i

. 1 4

- - 2

1. TI-34 will be revised prior to Unit 2 restart to verify that adequate-margin (between the ambient air temperature and dew point range at air dryer outlets) is maintained.
2. Air quality testing will be performed on the Drywell Control Air (DCA) system prior to restart of the respective units.

-3. Additional. Preventative Maintenance Procedures (PMs) will be established to change the dryer desiccant in the control air system on a regular basis by March 28, 1989.

4. Site Director Standard Practice (SDSP)-6.9. " Cleanliness of Fluid Systems," will be changed by April 28,_1989, to add a cleanliness criteria for hydrocarbons, particulate and moisture for control air.
5. Specific procedures detailing maintenance work on the control air supply to pneumatic operators will be changed by April 28, 1989, to incorporate a check that the control air system is maintained per the guidelines of SDSP-6.9.
6. Maintenance procedures detailing work on the control air compressors will be changed by April 28, 1989, to specify approved cleaning solvents and to incorporate the cleanliness criteria of SDSP-6.9.
7. Mechanical Maintenance Instruction (MMI)-42, "MSIV/ ADS Accumulator Leakage" will be changed by March 28, 1989, to test for both slow and rapid depressurization.
8. The Abnormal Operating Instructions (A0Is) for loss of control air will be reviewed to address symptoms, automatic actions, failure position of critical valves, expected system response, operator actions, and system restorations for Unit 2 and common prior to Unit 2 restart. Procedures specific to Units 1 and 3 will be revised prior to the unit's respective restart.
9. The control air end users identified have been or will be tested to ensure that they fail to their as-designed position upon loss of air except in cases where not testing is justified. Presently, 96 of the 129 components have been tested; the remainder will be tested for loss of air prior to restart of Unit 2.
10. Seven additional air operated components that were not included in the Restart Test Program (RTP) will be tested for loss of air prior to the restart of Unit 2.
11. MMI-42 will be revised to include testing the MSRV and MSIV accumulators for both rapid and gradual loss of air. This testing is scheduled as part of the RTP to be completed prior to Unit 2 restart.
12. The program for restart of Units 1 and 3 will include a similar verification of design and verification by test that safety-related, air-operated components and accumulators perform in accordance with their intended function prior to restart of the affected unit.

d

  • 3
13. Electrical controls and annunciators for the control air dryers are inspected yearly)for Instruction (EPI DRYproper 001. operation per Electrical PreventiveThe frequency evaluated and revised if necessary prior to Unit 2 restart. 1
14. PMs will be developed to periodically change dryer desiccant and dryer inlet and outlet filters. These PMs will be established and implemented by March 28, 1989.
15. A program will be developed to monitor control air on a six-month frequency for hydrocarbons and particulate. This program will be implemented by July 1, 1989.

These commitments fulfill your requirements in responding to Generic Letter 88-14. When you have implemented all the above comitments, we request that you notify the staff in writing that all work related to Generic Letter 88-14 is completed.

The reporting and/or recordkeeping requirements contained in this letter affect fewer than ter respondents; therefore, OMB clearance is not required i under P.L. 96 511.

Sincerely, Original signed by Suzanne C. Bleck, Assistant Director for Projects TVA Projects Division Office of Nuclear Reactor Regulation cc: See next page Distribution CDocket File- E. Jordan NRC PDR ACRS(10)

Local PDR GPA/CA Projects Reading W. LeFave ADSP Reading G. Edison D. Crutchfield BFN Rdg. File B. D. Liaw S. Black R. Pierson L. Watson W. S. Little M. Simms G. Gears D. Moran T. Daniels l

N. Markisohn OGC B. Grimes

!!VA:AD P  :  :  :

l OFG :NKR:IVA/LA :NRR:IVA/FM :TVA: add

____:___ /P

RPi rs'on  :  :  :

NAME :MSimms f/Jh)ftlGe(Igf)is# :SBlad lbAE~!kfh59

~~

!k)N5h /  ![ifb9 ld)h)bh "~f

!" ~!

0FFICIAL RECORD COPY

's.

>3v' Mr. 011v' er D.',Kingsley, Jr. .q

, 'cc: .

5

, General Counsel ,. Regional Administrator, Region II LTennessee Valley Authority- U.S. Nuclear Regulatory Commission 400 West Swanit Hill Drive 101 Marietta Street, N.W.

E11 833- Atlanta, Georgia 30323 Knoxville, Tennessee 37902 Resident Inspector / Browns Ferry NP

~ Mr. C. H. : Fox ..

U.S. Nuclear Regulatory Consnission Tennessee Valley. Authority Route 12. Box 537-SN 157B Lookout Place Athens, Alabama'.35611 Chattanooga, Tennessee 37402-2801 Mr. 0.~J.~Zeringue . . Dr. Henry Myers Science Advisor Tennessee Valley Authority Consiittee on Interior

' Browns Ferry Nuclear Plant- and Insular Affairs P.O. Box.2000 U. S. House of. Representatives Decatur, Alabama 35602 Washington, D.C. 20515 Tennessee Valley Authority Mr. P. Carier Rockville Office -!

Tennessee Valley Authority 11921 Rockville Pike .

~

Browns Ferry Nuclear Plant Suite 402 P.O. Box 2000 Rockville, Maryland 20852 Decatur, Alabama 35602-Mr. D. L. Williams Tennessee Valley Authority 400 West Summit fifil Drive.

W10 885 Knoxville, Tennessa 37902 f Chairman, Limestone County Commission