ML20140E232: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20140E232
| number = ML20140E232
| issue date = 01/27/1986
| issue date = 01/27/1986
| title = Ack Receipt of 851223 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-298/85-30.Addl Info Re Cause of Violation Needed within 30 Days of Ltr Date, Per 860103 Telcon W/Pilant,Weavor & Trevors
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-298/85-30.Addl Info Re Cause of Violation Needed within 30 Days of Ltr Date, Per 860103 Telcon W/Pilant,Weavor & Trevors
| author name = Gagliardo J
| author name = Gagliardo J
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8602030208
| document report number = NUDOCS 8602030208
| title reference date = 12-23-1985
| package number = ML20140E238
| package number = ML20140E238
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE

Latest revision as of 17:54, 12 December 2021

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-298/85-30.Addl Info Re Cause of Violation Needed within 30 Days of Ltr Date, Per 860103 Telcon W/Pilant,Weavor & Trevors
ML20140E232
Person / Time
Site: Cooper Entergy icon.png
Issue date: 01/27/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20140E238 List:
References
NUDOCS 8602030208
Download: ML20140E232 (1)


See also: IR 05000298/1985030

Text

r

,

.~ JAN 2 71986

In Reply Refer To:

Docket: 50-298/85-30

Nebraska Public Power District

ATTN: J. M. Pilant, Manager, Technical

Staff-Nuclear Power Group

P. O. Box 499

Columbus, Nebraska 68601

Gentlemen:

Thank you for your letter of December 23, 1985, in response to our letter

and the attached Notice of Violation dated November 27, 1985. As a result of

our review, we find that additional information, as discussed with your

Messrs. Pilant, Weaver and Trevors during a telephone call on January 3,

1986, is needed. Specifically, we request that you provide us with

information concerning the reason for the violation. Please provide the

supplemental information within 30 days of the date of this letter.

Sincerely,

Original Signed By

J. E. Gagliardo

J. E. Gagliardo, Chief

Reactor Projects Branch

CC:

Guy Horn, Division Manager

of Nuclear Operations

Cooper Nuclear Station

P. O. Box 98

Brownville, Nebraska 68321

Kansas Radiation Control Program Director

Nebraska Radiation Control Program Director

bec to DMB (IE01)

bcc distrib. by RIV:

RPB DRSP

Resident inspector R. D. Martin, RA

Section Chief (RPB/A) ). Weiss, LFMB (AR-2015

RIV File RSTS Operator

RIV:RPB/A1 O RPB/ RPB I, /

WMMcNeill/lk

/ /d//86

JPJay o

g/3)/86

JEGag

/// / 6

rdo

[j

8602030200 e60127 8 \ g'

" I

PDR ADOCK 0S00 I lt

.