ML19253B355: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:_        .      .
{{#Wiki_filter:_        .      .
_.          ._ _      _ . , . . .  .
Alabama Power Company 600 North 18th Street                                                                i      ,)
Alabama Power Company 600 North 18th Street                                                                i      ,)
Post Office Box 2641 Birmingham. Alabama 35291
Post Office Box 2641 Birmingham. Alabama 35291 i            /g4gV Telephone 205 323-5341 g3p
                                                                        &
i            /g4gV Telephone 205 323-5341 g3p
                                               'JL$$5.??!!,                                        h thoi'sc7$1Cn,                      ,                                      AlabamaPower
                                               'JL$$5.??!!,                                        h thoi'sc7$1Cn,                      ,                                      AlabamaPower
                                             !9 SEP 26 A10 ; y                      umnen enc seern P. O. Drawer 470 Ashford, Alabama a6312 September 20, 1979
                                             !9 SEP 26 A10 ; y                      umnen enc seern P. O. Drawer 470 Ashford, Alabama a6312 September 20, 1979 i
                                              ,
Mr. J. P. O'Reilly, Director U. S. Nuclear Regulatory Commission 101 Marietta Street, N. W.
i Mr. J. P. O'Reilly, Director U. S. Nuclear Regulatory Commission
  -
-
101 Marietta Street, N. W.
Atlanta, Georgia            30303
Atlanta, Georgia            30303



Latest revision as of 00:41, 2 February 2020

Ro:On 790814,carbon Dioxide Fire Protection Sys for Diesel Generator Bldg Declared Inoperable.Caused by Malfunction of Carbon Dioxide Timers Associated W/Rooms 1-2A & 2R.Fire Watch Conducted Until Timer Replaced & Sys Operable
ML19253B355
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 09/20/1979
From: Clayton F
ALABAMA POWER CO.
To:
References
NUDOCS 7910150431
Download: ML19253B355 (1)


Text

_ . .

Alabama Power Company 600 North 18th Street i ,)

Post Office Box 2641 Birmingham. Alabama 35291 i /g4gV Telephone 205 323-5341 g3p

'JL$$5.??!!, h thoi'sc7$1Cn, , AlabamaPower

!9 SEP 26 A10 ; y umnen enc seern P. O. Drawer 470 Ashford, Alabama a6312 September 20, 1979 i

Mr. J. P. O'Reilly, Director U. S. Nuclear Regulatory Commission 101 Marietta Street, N. W.

Atlanta, Georgia 30303

SUBJECT:

J. M. Tarley Nuclear Plant Special Report

REFERENCE:

Technical Specification 6.9.2.f and 3.7.11.2.b -

Dear Mr. O'Reilly:

This Special Report is being submitted as required by Tech. Spec.

6.9.2.f.

At 0800 on 8/14/79, the CO 2 fire protection system for the diesel generator building was declared inoperable due to the malfunction of the CO 2 timers associated with diesel generator building rooms 1-2A and 2B.

A fire watch patrol with backup fire suppression equipment was established and the area was inspected at least once per hour as required by Tech. Spec. action statement 3.7.11.2.b.

The system was declared operable at 1300 on Of12/79, following timer replacement and the satisfactory performance of surveillance test FNP-1-STP-129 (Low Pressure CO 2 System).

Yours very truly, A -

, b . Clayto , Jr.

FLCj r/TNE/mmb 1151 252 Y

7910150 O I 3 OFFICIAL COPY