Ro:On 801227,one Tube in Steam Generator 1C Satisfactorily Plugged.Defective Tube Located by Pressurizing Secondary Side & Performing Visual Insp for Leaks.Tube Plugging Reported Per Tech Spec 4.4.5.5.a
ML19341B280
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 01/12/1981
From: Clayton F
ALABAMA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8101300580
Download: ML19341B280 (1)


Text

_

Alabama Power Company 600 North 18th Street Post Office Box 2641 ,# 4 Birmegham. Alabama 35291 Te6ephone 205 250-1000

- 1)Jpg,

.,,,a?q.-

I

' . ". C ! ' ' .

F. L CLAYTON, JR. f L

Senior Vice Pressdent -8 d[.'/ M3 ham 3 g g 3J mesournem eewc system January 12, 1981 8/- 60+'- 03Li Mr. J. P. O'Reilly, Director D

/

U. S. Nuclear Regulatory Commission 101 Marietta Street, N.W.

/(( \) .,

Atlanca, GA 30303 E 'c1 2 4g gO . r

SUBJECT:

J. M. Farley Nuclear Plant g

Plugging of Tube in S. G. 1C .dd 8.a.klgg/Sg7 (S)

Dear Mr. O'Reilly:

p (pe This letter is to inform you that one tube (row 1, in Steam Generator 1C was satisfactorily plugged on December 27, 1980.

The defective tube was located by pressurizing the secondary side and performing a visual inspection for. leaks. Although the defective tube was discovered separate from the inservice inspection and by means other than eddy current examination, this letter is submitted in order to meet the in-tent of Tech. Spec. section 4.4.5.5.a which states: "Following each inservice inspection of steam generator tubes, the number of tubes plugged in each steam generator shall be reported to the Commission within 15 days."