ML20009F617

From kanterella
Jump to navigation Jump to search
Ro:On 810518,during Plant Fire Marshall Insp,Fire Barrier Penetration in Cable Spreading Room Was Declared Inoperable, Due to Improper Sealing.Penetration Sealed,Inspected & Returned to Svc on 810613
ML20009F617
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 06/24/1981
From: Clayton F
ALABAMA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8107310357
Download: ML20009F617 (1)


Text

QQ Alabama Power Company L i3 ,r.ICj,.Q (. I, 600 North 18th Street Post Office Box 2641 Birmingham Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr. b R ";;l 3 ;ffl "' Alabama Power the sournem e!ecirc sys:em June 24, 1981 , g s\' VN '

Docket No. 50-364 e

Mr. J. P. O'Reilly, Director

~.i . i.W'. O 9g\ W d.gi l' U. S. Nuclear Regulatory Commission 101 Marietta Street, N.W.

k 9

      • ]b,ce$ AIcd Q]

Suite 3100 -

M Atlanta, Georgia 30303  !? j\

sh

SUBJECT:

J. M. Farley Nuclear Plant Unit 2 Special Report

REFERENCE:

Unit 2 Technical Specification 3.7.12

Dear Mr. O'Reilly:

This Special Report is being submitted as required by Unit 2 Tech.

Spec. 3.7.12.

At 1300 en 5-18-81, during an inspection by the plant Fire Marshall, a fire barrier penetration in the cable spreading room was declared inoper able due to its not being properly sealed.

Tech. Spec. 3.7.12, in part, requires the above penetration to be functional. Tech. Spec. 3.7.12 accion statement requirements were met.

The penetration was sealed, inspected, and returna.d to service at 1630 on 6-13-81.

Yours very truly,

.,3.

  • A Nb0 f F. L. Clayton, Jg.

FLCJr/JRC:nac xc: Mr. W. H. Bradford Mr. W. G. Hairston File tsY h{e 8107310357 810624 PDR ADOCK 05000364 s PDR L