Category:REPORTABLE OCCURRENCE REPORT (SEE ALSO AO
MONTHYEARML20043B5861990-05-24024 May 1990
[Table view]Special Rept 90-004:on 900427,fire Barriers Nonfunctional for More than 7 Days.Caused by Planned Const Activities to Modify Primary Access Point.Fire Barriers Expected to Be Restored by 900701 ML20043B6051990-05-24024 May 1990 Special Rept 90-005:on 900429,containment Bldg Personnel Hatch Opened to Support Maint Activities for More than 7 Days.Containment Personnel Hatch Closed & Declared Functional on 900509 ML20042F7561990-05-0101 May 1990 Special Rept 90-003:on 900326,yard Fire Hydrant Inoperable for More than 14 Days in Order to Support Mods to Primary Access Point.Hydrant Returned to Svc on 900425 ML20006C5171990-02-0101 February 1990 Special Rept 90-002:on 900125,water Level in Both Fire Protection Water Storage Tanks Less than Tech Spec Limits. Pipe Will Be Evaluated to Determine Cause of Failure & Affected Section Will Be Replaced ML20006D2531990-01-31031 January 1990 Special Rept 90-001:on 900111,Train Reactor Vessel a Level Indicating Sys Inoperable for More than 7 Days.Replacement of Train a RVLIS Scheduled to Begin During Next Refueling Outage in Fall of 1990 ML20006B9811990-01-26026 January 1990 Ro:On 900125,fire Protection Water Storage Tanks Decreased Below Required Min Level Caused by Crack in Fire Protection Sys Yard.Crack Was Isolated & Level Restored to Above Min within Two Hours ML19332C8281989-11-21021 November 1989 Special Rept 89-005:on 891030,fire Barrier Penetration Open for More than 7 Days During Ninth Refueling Outage.Cause Not Stated.Continuous Fire Watch,Operability of Fire Detectors & Hourly Watch Patrol Established ML19327B9731989-11-0101 November 1989 Special Rept 89-003:on 891013,fire Barrier Penetration Open for More than 7 Days During Ninth Refueling Outage.Hatches Opened to Support Outage Activities.Containment Personnel & Equipment Hatches Closed on 891014 ML19327B9701989-11-0101 November 1989 Special Rept 89-004:during Refueling Outage,Six Steam Generator Tubes Exceeded Pluggable Limit Based on Eddy Current Testing Results.Total of 24 Steam Generator Tubes Plugged ML20050C1081982-03-12012 March 1982 Ro:During Low Power Physics Testing for Cycle 4,moderator Temp Coefficient in Hot Zero Power,Beginning of Cycle Condition Measured Greater than Required by Tech Spec. Control Rod Withdrawal Limits Established ML20050C1221982-03-12012 March 1982 Ro:On 820228,safety Injection & Reactor Trip Occurred During Attempt to Synchronize Unit.Also on 820228,boron Concentration in Boron Injecton Tank Fell Below Min Required Level ML20050B0091982-03-10010 March 1982 Ro:On 820310,inadvertent Actuation of Fire Protection Deluge Sys on Cooling Tower 1A Caused Levels in Fire Protection Tanks a & B to Fall Approx 85,000 Gallons.Caused by Maint Activities.Pressure Decrease Investigated ML20041A5191982-02-0808 February 1982 Ro:On 820101,fire Door 418 Declared Inoperable Due to Improper Closure.Door Repaired & Returned to Svc on 820114. Delay Due to Hardware Procurement ML20039E0731981-12-28028 December 1981 Ro:On 811226,containment Spray Additive Tank Isolation valve,V024,found in Closed Position Rendering Containment Spray Additive Tank Inoperable.Valve Opened & Locked. Investigation Underway.Further Details Forthcoming ML20039D3051981-12-18018 December 1981 Ro:On 811116,seal on Fire Barrier Cable Penetration 34-100-06 Damaged & Declared Inoperable.Cause Not Stated. Training in Administrative Requirements Will Be Given for Implementing Design Changes Re Breach of Fire Barrier ML20039D3091981-12-17017 December 1981 Ro:On 811211,analysis Performed Indicating Fecal Coliform Value Too High to Calculate for Sewage Treatment Plant 2A.Caused by Chlorination Sys Malfunctioning Causing Chlorine Residual to Decrease ML20009F6171981-06-24024 June 1981 Ro:On 810518,during Plant Fire Marshall Insp,Fire Barrier Penetration in Cable Spreading Room Was Declared Inoperable, Due to Improper Sealing.Penetration Sealed,Inspected & Returned to Svc on 810613 ML20009F8401981-06-11011 June 1981 Ro:On 810610,as Result of Inadvertent Actuation of Fire Protection Deluge Sys on Cooling Tower 2B,levels in Tanks a & B Fell to Approx 235,000 Gallons.Clipper Valve Opened & Deluge Sys Actuated ML20009G1441981-05-18018 May 1981 Ro:On 810515,fire Main in Low Voltage Switchyard Ruptured, Causing Protection Tanks a & B Levels to Fall Below Tech Specs.Cause of Initial Rupture Not Stated.Tank Returned to Acceptable Levels.Followup Will Be Provided ML20003F6891981-04-15015 April 1981 Ro:On 810321,cable Spreading Room Sprinkler Sys Was Declared Inoperable.Caused by Spurious Actuation of Sprinkler Sys. Smoke Detector Reset Switch Was Modified & Sys Returned to Svc ML19341B2801981-01-12012 January 1981 Ro:On 801227,one Tube in Steam Generator 1C Satisfactorily Plugged.Defective Tube Located by Pressurizing Secondary Side & Performing Visual Insp for Leaks.Tube Plugging Reported Per Tech Spec 4.4.5.5.a ML19257C5921980-01-21021 January 1980 Ro:On 791024,w/plant in Mode 4,train a Safety Injection Block Light Turned Off,Actuating Injection on Train A.Cause Undetermined.P/O Universal Card A416 Replaced.Logic Test Performed on Train a & Train Returned to Svc on 791025 ML19290B7401979-11-0808 November 1979 RO-79-055-01P:Westinghouse Notified Util of Potential for P-4 Permissive Failures to Remain Unidentified During Performance of Surveillance Tests.Details Will Be Provided in Followup Rept ML19210F0261979-11-0707 November 1979 RO-79-054-01P:on 791107,cooling Tower B Fire Resulted in Reduction of Fire Protection Tank Levels.Tanks a & B Fell to 120,000 Gallons.Tank Levels Will Be Returned to Min Acceptable Levels on 791107 ML19250A4761979-10-0909 October 1979 Nonroutine Environ Operating Rept:On 791008,inadvertent Gaseous Release Occurred During Maint on Waste Gas Decay Tank 8 Inlet Isolation Valve Bonnet.Caused by Faulty Instructions of Work Request & Inadequate Communication ML19209D1371979-10-0808 October 1979 Ro:On 791008,inadvertent Gas Release Occurred While Performing Maint on Waste Gas Decay Tank Inlet Isolation Valve Bonnet.Bldg Was Evacuated.Radiation Tests on Personnel Negative ML19253B3551979-09-20020 September 1979 Ro:On 790814,carbon Dioxide Fire Protection Sys for Diesel Generator Bldg Declared Inoperable.Caused by Malfunction of Carbon Dioxide Timers Associated W/Rooms 1-2A & 2R.Fire Watch Conducted Until Timer Replaced & Sys Operable ML19208B2011979-08-28028 August 1979 RO-79-041-01P:on 790825,Westinghouse Submitted Rept Re Heat Sink Shorting on Certain 7300 Series Printed Circuit Cards. Seismic Vibration Could Cause Card Guide Rubbing of Heat Sinks & Calibr Shift 1990-05-24 Category:LER) MONTHYEARML20043B5861990-05-24024 May 1990
[Table view]Special Rept 90-004:on 900427,fire Barriers Nonfunctional for More than 7 Days.Caused by Planned Const Activities to Modify Primary Access Point.Fire Barriers Expected to Be Restored by 900701 ML20043B6051990-05-24024 May 1990 Special Rept 90-005:on 900429,containment Bldg Personnel Hatch Opened to Support Maint Activities for More than 7 Days.Containment Personnel Hatch Closed & Declared Functional on 900509 ML20042F7561990-05-0101 May 1990 Special Rept 90-003:on 900326,yard Fire Hydrant Inoperable for More than 14 Days in Order to Support Mods to Primary Access Point.Hydrant Returned to Svc on 900425 ML20006C5171990-02-0101 February 1990 Special Rept 90-002:on 900125,water Level in Both Fire Protection Water Storage Tanks Less than Tech Spec Limits. Pipe Will Be Evaluated to Determine Cause of Failure & Affected Section Will Be Replaced ML20006D2531990-01-31031 January 1990 Special Rept 90-001:on 900111,Train Reactor Vessel a Level Indicating Sys Inoperable for More than 7 Days.Replacement of Train a RVLIS Scheduled to Begin During Next Refueling Outage in Fall of 1990 ML20006B9811990-01-26026 January 1990 Ro:On 900125,fire Protection Water Storage Tanks Decreased Below Required Min Level Caused by Crack in Fire Protection Sys Yard.Crack Was Isolated & Level Restored to Above Min within Two Hours ML19332C8281989-11-21021 November 1989 Special Rept 89-005:on 891030,fire Barrier Penetration Open for More than 7 Days During Ninth Refueling Outage.Cause Not Stated.Continuous Fire Watch,Operability of Fire Detectors & Hourly Watch Patrol Established ML19327B9731989-11-0101 November 1989 Special Rept 89-003:on 891013,fire Barrier Penetration Open for More than 7 Days During Ninth Refueling Outage.Hatches Opened to Support Outage Activities.Containment Personnel & Equipment Hatches Closed on 891014 ML19327B9701989-11-0101 November 1989 Special Rept 89-004:during Refueling Outage,Six Steam Generator Tubes Exceeded Pluggable Limit Based on Eddy Current Testing Results.Total of 24 Steam Generator Tubes Plugged ML20050C1081982-03-12012 March 1982 Ro:During Low Power Physics Testing for Cycle 4,moderator Temp Coefficient in Hot Zero Power,Beginning of Cycle Condition Measured Greater than Required by Tech Spec. Control Rod Withdrawal Limits Established ML20050C1221982-03-12012 March 1982 Ro:On 820228,safety Injection & Reactor Trip Occurred During Attempt to Synchronize Unit.Also on 820228,boron Concentration in Boron Injecton Tank Fell Below Min Required Level ML20050B0091982-03-10010 March 1982 Ro:On 820310,inadvertent Actuation of Fire Protection Deluge Sys on Cooling Tower 1A Caused Levels in Fire Protection Tanks a & B to Fall Approx 85,000 Gallons.Caused by Maint Activities.Pressure Decrease Investigated ML20041A5191982-02-0808 February 1982 Ro:On 820101,fire Door 418 Declared Inoperable Due to Improper Closure.Door Repaired & Returned to Svc on 820114. Delay Due to Hardware Procurement ML20039E0731981-12-28028 December 1981 Ro:On 811226,containment Spray Additive Tank Isolation valve,V024,found in Closed Position Rendering Containment Spray Additive Tank Inoperable.Valve Opened & Locked. Investigation Underway.Further Details Forthcoming ML20039D3051981-12-18018 December 1981 Ro:On 811116,seal on Fire Barrier Cable Penetration 34-100-06 Damaged & Declared Inoperable.Cause Not Stated. Training in Administrative Requirements Will Be Given for Implementing Design Changes Re Breach of Fire Barrier ML20039D3091981-12-17017 December 1981 Ro:On 811211,analysis Performed Indicating Fecal Coliform Value Too High to Calculate for Sewage Treatment Plant 2A.Caused by Chlorination Sys Malfunctioning Causing Chlorine Residual to Decrease ML20009F6171981-06-24024 June 1981 Ro:On 810518,during Plant Fire Marshall Insp,Fire Barrier Penetration in Cable Spreading Room Was Declared Inoperable, Due to Improper Sealing.Penetration Sealed,Inspected & Returned to Svc on 810613 ML20009F8401981-06-11011 June 1981 Ro:On 810610,as Result of Inadvertent Actuation of Fire Protection Deluge Sys on Cooling Tower 2B,levels in Tanks a & B Fell to Approx 235,000 Gallons.Clipper Valve Opened & Deluge Sys Actuated ML20009G1441981-05-18018 May 1981 Ro:On 810515,fire Main in Low Voltage Switchyard Ruptured, Causing Protection Tanks a & B Levels to Fall Below Tech Specs.Cause of Initial Rupture Not Stated.Tank Returned to Acceptable Levels.Followup Will Be Provided ML20003F6891981-04-15015 April 1981 Ro:On 810321,cable Spreading Room Sprinkler Sys Was Declared Inoperable.Caused by Spurious Actuation of Sprinkler Sys. Smoke Detector Reset Switch Was Modified & Sys Returned to Svc ML19341B2801981-01-12012 January 1981 Ro:On 801227,one Tube in Steam Generator 1C Satisfactorily Plugged.Defective Tube Located by Pressurizing Secondary Side & Performing Visual Insp for Leaks.Tube Plugging Reported Per Tech Spec 4.4.5.5.a ML19257C5921980-01-21021 January 1980 Ro:On 791024,w/plant in Mode 4,train a Safety Injection Block Light Turned Off,Actuating Injection on Train A.Cause Undetermined.P/O Universal Card A416 Replaced.Logic Test Performed on Train a & Train Returned to Svc on 791025 ML19290B7401979-11-0808 November 1979 RO-79-055-01P:Westinghouse Notified Util of Potential for P-4 Permissive Failures to Remain Unidentified During Performance of Surveillance Tests.Details Will Be Provided in Followup Rept ML19210F0261979-11-0707 November 1979 RO-79-054-01P:on 791107,cooling Tower B Fire Resulted in Reduction of Fire Protection Tank Levels.Tanks a & B Fell to 120,000 Gallons.Tank Levels Will Be Returned to Min Acceptable Levels on 791107 ML19250A4761979-10-0909 October 1979 Nonroutine Environ Operating Rept:On 791008,inadvertent Gaseous Release Occurred During Maint on Waste Gas Decay Tank 8 Inlet Isolation Valve Bonnet.Caused by Faulty Instructions of Work Request & Inadequate Communication ML19209D1371979-10-0808 October 1979 Ro:On 791008,inadvertent Gas Release Occurred While Performing Maint on Waste Gas Decay Tank Inlet Isolation Valve Bonnet.Bldg Was Evacuated.Radiation Tests on Personnel Negative ML19253B3551979-09-20020 September 1979 Ro:On 790814,carbon Dioxide Fire Protection Sys for Diesel Generator Bldg Declared Inoperable.Caused by Malfunction of Carbon Dioxide Timers Associated W/Rooms 1-2A & 2R.Fire Watch Conducted Until Timer Replaced & Sys Operable ML19208B2011979-08-28028 August 1979 RO-79-041-01P:on 790825,Westinghouse Submitted Rept Re Heat Sink Shorting on Certain 7300 Series Printed Circuit Cards. Seismic Vibration Could Cause Card Guide Rubbing of Heat Sinks & Calibr Shift 1990-05-24 Category:TEXT-SAFETY REPORT MONTHYEARML20217P0761999-10-0606 October 1999
[Table view]Non-proprietary, Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs ML20217G0361999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20212E7451999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Hcgs,Unit 1.With Summary of Changes,Tests & Experiments Implemented During Aug 1999.With ML20216E4941999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Jmfnp.With ML20210T2161999-08-0606 August 1999 Draft SE Supporting Proposed Conversion of Current TS to ITS for Plant ML20211B2011999-08-0404 August 1999 Informs Commission About Results of NRC Staff Review of Kaowool Fire Barriers at Farley Nuclear Plant,Units 1 & 2 & Staff Plans to Address Technical Issues with Kaowool & FP-60 Barriers ML20210R6031999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20196J3791999-06-30030 June 1999 Safety Evaluation of TR WCAP-14750, RCS Flow Verification Using Elbow Taps at Westinghouse 3-Loop Pwrs. Rept Acceptable ML20209G0661999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-267, Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-023, Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with ML20206G7471999-05-0404 May 1999 Safety Evaluation Accepting Corrective Actions Taken by SNC to Ensure That Valves Perform Intended Safety Functions & Concluding That SNC Adequately Addressed Requested Actions in GL 95-07 L-99-020, Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20206C9461999-04-30030 April 1999 1:Final Cycle 16 Freespan ODSCC Operational Assessment L-99-161, Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20205N0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20204D7271999-03-15015 March 1999 ISI Refueling 15,Interval 2,Period 3,Outage 3 for Jm Farley Nuclear Generating Plant,Unit 1 ML20207M6421999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20203A2651999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20199D8611999-01-12012 January 1999 SER Accepting Relief Request for Inservice Insp Program for Plant,Units 1 & 2 ML20199E6591998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20206C8081998-12-31031 December 1998 Alabama Power 1998 Annual Rept ML20198K4091998-12-18018 December 1998 COLR for Jm Farley,Unit 1 Cycle 16 ML20198B2561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20195E2281998-11-16016 November 1998 Safety Evaluation Authorizing Relief Request for Second 10-year ISI Program Relief Request 56 for Plant,Unit 1 ML20195C9681998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20155E0271998-10-29029 October 1998 SER Approving & Denying in Part Inservice Testing Program Relief Requests for Plant.Relief Requests Q1P16-RR-V-3 & Q2P16-RR-V Denied Since Requests Do Not Meet Size Requirement of GL 89-04 ML20154B6121998-10-0101 October 1998 Safety Evaluation Granting Second 10-year ISI Requests for Relief RR-13 & RR-49 Through RR-55 for Jm Farley NPP Unit 1 ML20151V8341998-09-30030 September 1998 Non-proprietary Rev 2 to NSA-SSO-96-525, Jm Farley Nuclear Plant Safety Analysis IR Neutron Flux Reactor Trip Setpoint Change ML20154H6001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20154H0121998-09-30030 September 1998 Submittal-Only Screening Review of Farley Nuclear Plant IPEEE (Seismic Portion) ML20197C8991998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20237C5471998-08-20020 August 1998 Suppl to SE Re Amends 137 & 129 to Licenses NPF-2 & NPF-8, Respectively.Se Being Supplemented to Incorporate Clarifications/Changes & Revise Commitment for Insp of SG U-bends in Rows 1 & 2 for Unit 2 Only ML20236Y1121998-07-31031 July 1998 Voltage-Based Repair Criteria 90-Day Rept ML20237B1891998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20237A2181998-07-24024 July 1998 Jm Farley Unit 2 ISI Rept Interval 2,Period 3 Outage 1, Refueling Outage 12 ML20236U6141998-07-23023 July 1998 Safety Evaluation Authorizing Use of Alternative Alloy 690 Welds (Inco 52 & 152) as Substitute for Other Weld Metal ML20236R8671998-07-0909 July 1998 Safety Evaluation Concluding That Southern Nuclear Operating Co USI A-46 Implementation Program Has Met Purpose & Intent of Criteria in GIP-2 & Staff SSER-2 on GIP-2 for Resolution of USI A-46 ML20236M5981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20154H0461998-06-30030 June 1998 Technical Evaluation Rept on Review of Farley Nuclear Plant IPEEE Submittal on High Winds,Flood & Other External Events (Hfo) ML20248M3121998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20247F3631998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20217D2591998-04-21021 April 1998 Safety Evaluation Accepting Licensee Proposed Alternative Re Augmented Exam of Reactor Vessel Shell Welds for Plant ML20247E8851998-03-31031 March 1998 FNP Unit 2 Cycle 13 Colr ML20217H3191998-03-31031 March 1998 Safety Evaluation Accepting Proposed Changes to Plant Matl Surveillance Programs ML20216D5941998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Joseph M Farley Nuclear Plant,Units 1 & 2 ML20217D4081998-03-24024 March 1998 Safety Evaluation Accepting Proposed Changes to Maintain Calibration Info Required by ANSI N45.2.4-1972 ML20216H6731998-03-17017 March 1998 SER Accepting Quality Assurance Program Description Change for Joseph M Farley Nuclear Plant,Units 1 & 2 ML20216J6851998-03-16016 March 1998 Revised Pages 58 & 59 to Fnp,Units 1 & 2,Power Uprate Project BOP Licensing Rept ML20216D9811998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Jm Farley Nuclear Plant,Units 1 & 2 1999-09-30 |
Text
, &a .
=*
? ' Alabama Power Com0any l'
. 40 invernass C;nter Parkwiy q' Post Office Box 1295 Barmangham, Alabama 35201
~ Telephone 20f. 868-5581 W. G. Hairston,111 Senior Vico President noie., op.ranon.
Alabamalbwer May 24, 1990 tre southem dectre system Docket No. S0-364 U. S. Nuclear Regulatory Commission ATTN: Document-Control Desk Vashington, D.-C. 20555 ,
i Joseph H. Farley Nuclear Plant - Unit 2 Special Report No.90-005, Fire Barrier Penetration Non-functional For More Than Seven Days'-
Gentlemen In accordance with the requirements of Technical Specification 3.7.12, the-enclosed Special Report No.90-005, Unit 2,=is submitted.
Respectfully submitted, G.),f W. G. Hairston,-III
)
-WGH,III/ JAR:mgd 18.1.40 i Enclosure cc: Mr. S. D. Ebneter Hr. S. T. Hoffman Mr. G. F. Maxwell l
9005300271 900524 PDR ADOCK 03000364 S PDC p
[kM M l yo
f J
4
. Special Report No.90-005, Unit 2 Fire' Barrier Penetration Non-f unctional- For More Than Seven Days _ '
At 0430 on April 29, 1990, the containment building personnel hatch (fire door number 2466) was opened to support maintenance activities inside the containment building.. Due to the scope of the work, the door was not .
closed after seven days. Technical Specification 3.7.12 requires that all non-functional fire barrier penetrations be restored to functional status. r within seven days or a Special Report aust be subaitted within the next 30 >i days. Therefore, this Special Report is being subaitted. . .
The containaent personnel hatch was closed and declared functional'on May.9. 1990 at 2330. Technical Specification action requirements were act for the personnel hatch.
A 1
VGH,III/JARimgd 18.1.40 l
l
,F t
l
.(b
.U I