ML20043B605

From kanterella
Jump to navigation Jump to search
Special Rept 90-005:on 900429,containment Bldg Personnel Hatch Opened to Support Maint Activities for More than 7 Days.Containment Personnel Hatch Closed & Declared Functional on 900509
ML20043B605
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 05/24/1990
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
90-005, 90-5, NUDOCS 9005300271
Download: ML20043B605 (2)


Text

, &a .

=*

? ' Alabama Power Com0any l'

. 40 invernass C;nter Parkwiy q' Post Office Box 1295 Barmangham, Alabama 35201

~ Telephone 20f. 868-5581 W. G. Hairston,111 Senior Vico President noie., op.ranon.

Alabamalbwer May 24, 1990 tre southem dectre system Docket No. S0-364 U. S. Nuclear Regulatory Commission ATTN: Document-Control Desk Vashington, D.-C. 20555 ,

i Joseph H. Farley Nuclear Plant - Unit 2 Special Report No.90-005, Fire Barrier Penetration Non-functional For More Than Seven Days'-

Gentlemen In accordance with the requirements of Technical Specification 3.7.12, the-enclosed Special Report No.90-005, Unit 2,=is submitted.

Respectfully submitted, G.),f W. G. Hairston,-III

)

-WGH,III/ JAR:mgd 18.1.40 i Enclosure cc: Mr. S. D. Ebneter Hr. S. T. Hoffman Mr. G. F. Maxwell l

9005300271 900524 PDR ADOCK 03000364 S PDC p

[kM M l yo

f J

4

. Special Report No.90-005, Unit 2 Fire' Barrier Penetration Non-f unctional- For More Than Seven Days _ '

At 0430 on April 29, 1990, the containment building personnel hatch (fire door number 2466) was opened to support maintenance activities inside the containment building.. Due to the scope of the work, the door was not .

closed after seven days. Technical Specification 3.7.12 requires that all non-functional fire barrier penetrations be restored to functional status. r within seven days or a Special Report aust be subaitted within the next 30 >i days. Therefore, this Special Report is being subaitted. . .

The containaent personnel hatch was closed and declared functional'on May.9. 1990 at 2330. Technical Specification action requirements were act for the personnel hatch.

A 1

VGH,III/JARimgd 18.1.40 l

l

,F t

l

.(b

.U I

s DI

. ,, -