Alabama Power Company 600 North 18th Street i
,)
Post Office Box 2641 Birmingham. Alabama 35291 i
/g4gV Telephone 205 323-5341 g3p
'JL$$5.??!!,
h thoi'sc7$1Cn, AlabamaPower
!9 SEP 26 A10 ; y umnen enc seern P. O. Drawer 470 Ashford, Alabama a6312 September 20, 1979 Mr. J. P. O'Reilly, Director i
U. S. Nuclear Regulatory Commission 101 Marietta Street, N. W.
Atlanta, Georgia 30303
SUBJECT:
J. M. Tarley Nuclear Plant Special Report
REFERENCE:
Technical Specification 6.9.2.f and 3.7.11.2.b
Dear Mr. O'Reilly:
This Special Report is being submitted as required by Tech. Spec.
6.9.2.f.
At 0800 on 8/14/79, the CO fire protection system for the diesel 2
generator building was declared inoperable due to the malfunction of the CO timers associated with diesel generator building rooms 1-2A and 2B.
2 A fire watch patrol with backup fire suppression equipment was established and the area was inspected at least once per hour as required by Tech. Spec. action statement 3.7.11.2.b.
The system was declared operable at 1300 on Of12/79, following timer replacement and the satisfactory performance of surveillance test FNP-1-STP-129 (Low Pressure CO System).
2 Yours very truly, A
b. Clayto, Jr.
FLCj r/TNE/mmb 1151 252 Y