ML20039D309
| ML20039D309 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 12/17/1981 |
| From: | Biddinger C ALABAMA POWER CO. |
| To: | Warr J ALABAMA, STATE OF |
| References | |
| NUDOCS 8112310512 | |
| Download: ML20039D309 (1) | |
Text
.
I Au bama Power Company 6C ) North 18th Street 06M0,REGl? N Post Office Box 2641 Birmir.pham, Alabama 35291 Telephoi e 205 250-1000 lj= ah.i A. r, ;. j j- @ i-s M DE N gQ**'
AlabamaPower the sournem electnc system December 17, 1981 O
k[;s Mr. James W. Warr N'sh Chief Administrative Officer b
j'
'3 y
Alabama Water Improvement Commission 7
]
O 21 Gunter Park Drive, West
{
c _ E C g g %,:
Montgomery, Alabama 36130
': i t q
r L.
-s
Dear Mr. Warr:
'c '
y y
Re:
Farley Nuclear Plant N
NPDES Permit No. AL0024019
/
In accordance with Part II.A.2 of the referenced permit, we are submitting a noncompliance report for a violation which occurred at the referenced plant. Analysis performed on December 11, 1981 indicated a Fecal Coliform value of too numerous to count (TNTC) for the Sewage Treatment Plant 2A (Discharge Point 011).
The chlorination system of the sewage facility malfunctioned, causing the chlorine residual to decrease below normal operating levels.
As a result, the fecal coliform count increased and exceeded the allowable limit.
The noncompliance was detected on the sample date, December 10, 1981. The chlorination system was repaired on December 15, 1981.
Future operation will include testing the chlorine residual to ensure proper functioning of the chlorination system.
If you need additional information, please contact me.
Very truly yours, ff Q JA--
= >
T Biddinger, MaI ger Environmental and Research Services JLF:y scc: Nuclear Regulatory Commission ohoghhf8 ib D
,! [ *> V
'/s