,A f.
'y Alabama Power Ccmp:ny 40 inverness Centst Parkway Post Office Box 1295 Birmingham, Alabar.ia 35201 Telephone 205 868 5581 W, G. Hairston,111 Senior Vice President Nuclear Operations May 1, 1990 Alabama Power tre southem elecrec system Docket Nos. 50-348 50-364 U. S. Nuclerr Regulatory Commission ATTN Docunient Control Desk Vashington, D. C. 20555 Gentlemen:
Joseph M. Farley Nuclear Plant - Units 1 and 2 Special Report No.90-003 Yard Fire Hydrant Inoperable For More Than Fourteen Days In accordance with the. requirements of Technical Specification 3.7.11.5, the enclosed Special Report No.90-003, Units 1 and 2, isiprovided.
Respectfully submitted, W.). ML-V. G. Hairston, III VGH,III/ JAR:n 1714 Enclosure cci Mr. S. D. Ebneter Mr. S. T. Hoffman Mr. G. F. Maxwell J
h 9005090354 900501
[ ff 1
PDR ADOCK 0500 8
s S
1\\(
P-
.E
\\
Enclosure
~
Special Report ho.90-003, Units 1 and 2 Yard Fire Hydrant Inoperable For More Than Fourteen Days nt 1100 on March 26, 1990, yard fire hydrant N1Y43V103 was disabled in order to support modifications to the Primary Access Point.
Due to the scope of the work, the hydrant could not be returned to service within fourteen days. Technical Specification 3.7.11.5 requires this yard fire hy/rnnt to be returned to operable status within 14 days, or a Special Rtncrt must be submitted within the following 30 days.
Therefore, this il Special Report is being submitted.
Yard fire hydrant N1Y43V103 was 1
returned to service on April 25, 1990.
Technical Specification action statement requirements were met for the hydrant.